Professional Documents
Culture Documents
For
21 Contribution
22 Contribution (After OTP generation)
23 Contribution (After OTP submission)
24 Contribution Successful
Design Team Product Android
Design eHTML Desgin Approved Target Start End Status
26-Nov 24-Nov
23-Nov 20-Nov Done✅
14-Nov 11-Nov Done✅
19-Nov 15-Nov Done✅
10-Nov 5-Nov Done✅
29-Nov 27-Nov Done✅
For iOS
iOS QA UAT
Start Date End Date QA Start Date QA End Date UAT Start Date
13-Aug 16-Aug
13-Aug 16-Aug
13-Aug 16-Aug
19-Aug 21-Aug
22-Aug 23-Aug
26-Aug 26-Aug
27-Aug 27-Aug
28-Aug 28-Aug
29-Aug 29-Aug
30-Aug 30-Aug
3-Sep 3-Sep
4-Sep 4-Sep
5-Sep 5-Sep
6-Sep 6-Sep
9-Sep 13-Sep
16-Sep 24-Sep
25-Sep 26-Sep
System Slow
7-Oct 7-Oct
9-Oct 9-Oct
10-Oct 10-Oct
14-Oct 11-Oct
16-Oct 15-Oct
22-Oct 17-Oct
25-Oct 23-Oct
30-Oct 29-Oct
31-Oct 31-Oct
1-Nov 1-Nov
6-Nov 4-Nov
7-Nov 7-Nov
8-Nov 8-Nov
same as 26th row
11-Nov 11-Nov
13-Nov 12-Nov
14-Nov 14-Nov
15-Nov 15-Nov
18-Nov 18-Nov
19-Nov 19-Nov
20-Nov 20-Nov
21-Nov 21-Nov
22-Nov 22-Nov
6-Jan 6-Jan
13-Dec 9-Dec
20-Dec 16-Dec
26-Dec 23-Dec
31-Dec 30-Dec
3-Jan 2-Jan
28-Nov 25-Nov
Induction
10-Jan 7-Jan
16-Jan 13-Jan
20-Jan 17-Jan
22-Jan 21-Jan
UAT Development
UAT End Date Live Date
S.Nopng namfeedback
1 Dashboalast 5 contributions--to add S
2 dashboardc colors to be changed
3 cureent value, cost value, withdrawal and profit to be displayed
4 10 digits for current value, cost val and profit
6 Adding a Total Tab
7 Include commas everywhere
12 address, bank, scheme, nominee, nodal office details
13 icon change for nod ofc and => POP + SP
8 Remove word Scheme
9 in contr, contr date should be displayed as 08-Jan-2019
10 Set total in place of tot contr.
11 In tab bar, set contribute in place of contribution
14 remove rate us
5 Remove as on in top of pie chart
15
16
17
type status
spelling Done✅
syamala to give color codes Done✅
backend
Done✅
Done✅
Done✅
Done✅
Done✅