You are on page 1of 1

DETAIL SECT.

OF CORRIDOR

DETAIL SECT. OF RAMP & CORRIDOR

COLUMN ELEV. DETAIL OF STIFFENER DETAIL OF FOOTING TIE BEAM

NOTE :

FOUNDATION PLAN
DETAIL OF F-1 / C-1

VARIOUS DPWH FOUNDATION PLAN, DETAIL OF F-1 / C-1,


PROPOSED PROJECTS COLUMN ELEVATION, BOD
NAPOLEON B. TORIBIO NELSON S. ANTONIO DOMICIANO B. LUSICA (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) 11
DETAIL OF STIFFENER,
STRUCTURAL DESIGN STRUCTURAL DESIGN PROJECT MANAGER
STANDARD ONE-STOREY DETAIL OF FOOTING TIE BEAM, S-4
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 16
POSITION: STRUCTURAL ENGINEER POSITION: STRUCTURAL ENGINEER SCHOOL BUILDING DETAIL SECTION OF RAMP & CORRIDOR,
PRC No.: 32516 TIN No.: 107-915-002 PRC No.: 14234 TIN No.: 178-384-258 OIC, BUILDING DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 5-CLASSROOM ) DETAIL SECTION OF CORRIDOR

You might also like