Site Priority

Hub/PTN Metro Dependent Sites


S.No. Site ID Region Sub-region (Platinum/Gold/
/PTN Long Haul Count
Silver/Bronze)

1 6175 Central Central-3 Silver Hub 12


Requirement Category Site DC Shared Type of Requirement
Indoor/
(Operational Site/New with OMO (Power System Upgradation/Faulty & weak
Outdoor
Physical Site) (Yes/No) battery bank replacement)

Operational site No Battery bank weak Outdoor


Solar Solution Battery Installation
DG Installed on Site Energization Existing Battery
Installed Type( Underground/indoor
the site (Yes/No) Status (Prime/Standby) Bank Model
(Yes/No) rack /in Cabinet)

No NA No Narada 600 In Cabinet


Battery cabinet Battery Cabinet
Existing Battery Battery Cabinet Battery cabinet Battery Cabinet
status Cooling System
Bank Capacity Installed (Y/N) Model Capacity
( Healthy/Faulty) (ok/faulty)

600Ah Y ZXDU 68 W001(C967) Faulty Faulty 600Ah


Existing Battery Existing Battery Existing Battery Is Battery Under Battery Discharge
Bank S.Nos. of Asset Number of Installation date Warranty test performed on
all the cells all the cells (dd/mm/YY) (Yes/No) site (Yes/No)

YES Yes 7-Jan-15 No Yes


Regional BTS/TCH
Battery Back up time after BTS availability of the site
availability Target for the
discharge test (Minutes) for last 30 days
site

10m 95.15 95.15


If DG will not be removed,
For how Many days in Last
Will DG removed after BB How much fuel will be
30 days BTS availability
replacement? (Yes/No) saved per month after BB
Target not Ahieved?
replacement? (Liters)

18 No 200
Under Which Battery
Allocation Criteria of BB Detailed Justification for why
Allocation policy, BB is existing battery bank got faulty and BB Cage Installed (Yes/No)
requested? (Criteria No. 1… need replacement?
9)
Criteria # 3 Operational Sites Non BB Weak Yes
Anti-Teft wall Battery Bank BB Cabinet Reason for
Revenue
Constrction Theft History on Requirement Cabinet
Commitment
Required (Y/N) site (Yes/No) Requirement

NO NO Yes weak BB