DNV:‘GL
NERHBKN-
SOURCE - NON-GONFORMANCE REPORT — BAA #38
Particulars of project
Dw Gl prec ae: ‘as Abu Aboud Stasium and Print
nV ct cutomer name BN Contracting co, WLL, Qatar
supe: —=
terete 21 Dung Corporation - DDG AnH, Vietnam
OW GL acto beta HBX Contracting co. WL, Qatar,
ON pret ter: as) -
NV Gu assgnment number:
DNV Gt orer/PO number:
Inspection details,
cuore’ FO ruber o Supt:
supper reference
Insedion ton: pecan
Inepecton tt at: 2019-13-08)
Inspection en te (aois-11-08
[Po tem ne. |_— Quanity esriton of aon-anformity nd posse root
L _ Bieed pees el)
sama) 0 @ in bran bam wa
caasecwrense tal vs dmencen ipa oy 1! OWL,
siacoiiss a
‘renee Totfollm TF No, Se-c6-cAG-HOK HSTorrective/Preventive actionsh
‘Actions) proposed by
Tatty dnorsons une epee
tn Hak ane Qe
Recnected nesten nth QTC,
Preventive actions
sey carry ot 3 meeting wth
Construction, Qe tem forming
‘Soporte, GC soul be informing
gre He fr epee per
1 Potaprans on ast page of hie report
tional comments
(Le Phuce Noha)
Inspector
(pe ane: (2039-11-04)
Disebution: customer
DNV-GL
27-326 /
completion date
nm Varificaton |
completed by
(ov-2019
Plas Vin tha
|= p= Do
rea)
Inspector
ose date (BAY
paw Tb
Dsvpier Bi ManvtocurerAdaon information (eption
Photographs