M kNm/m 300 fck N/mm² 20 gc = 1.50 d 1.00 fyk N/mm² 500 gs = 1.15 span mm 2900 gk kN/m2 6.50 Dc = 5 h mm 900 qk kN/m2 1.50 Bar Ø mm 16 cover mm 50 to this steel Section location SUPPORT OUTPUT 1st Floor, Span H-J . d = 900 - 50 - 16/2 = 842.0 mm 3.1.7 (3) x = [842 - √(842² - 4000/0.85 x 300 x 1.5/20)]/0.8 = 40.1 mm 5.5 (4) (x/d) limit = 0.600 x/d actual = 0.048 < 0.600 ok Fig 3.5 z = 842 - 0.4 x 40.1 = 826.0 > 0.95d = 799.9. mm As = 300E6/500/799.9 x 1.15 = 863 < As min = 1035 mm²/m 9.2.1.1 (1) As min = 1.30 x 842 = 1035 mm²/m . Provide T16 @ 175 = 1149 mm²/m y2 = SLS M = 300 x 8.00/11.03 = 189.12 kNm ss = 239.6 N/mm² . . . .