Mobile Equipment Worksheet
Mobile Equipment Worksheet
Audit of pre start check sheets / (1) Use outputs of trucks/fleet management system (1) Check with operators that they understand the
(1) Check quality and completeness of prestart
Pre start inspections are being electronic pre start inspection to check pre-starts are being completed. requirements for pre-starts
completed and inspections are of records. Area Supervisor Monthly checks on a sample of different vehicle types -
(2) Check maintenance reports against the pre- (2) Check operators know procedure to follow for a
a suitable quality Identify non compliances and covering company operators and contractors and
start checks to ensure the issues are being defect identified in pre-start to ensure it is reported and
follow up actions taken. also covering electronic and paper records.
addressed and closed out in a timely manner addressed.
Audit of traffic management plans (1) Check traffic management plan is authorised
to confirm plans have been Tech Services Annual and current eg more recent than last 6 months
reviewed, updated and Superintendent (2) Confirm traffic management plan complies with
communicated as required relevant legislation and company design guidelines (1) Check traffic management plan is authorised
and current eg more recent than last 6 months
(2) Check traffic management plans are signed
off by Engineering and Mine Operations as
Plans are up to date and (1) Check safety communications have been
Documented traffic required
management plans applicable to current operating distributed as required based on changing road
requirements conditions. (3) Check contractor traffic management plans
Audit of short/medium term traffic
(2) Check traffic management plans are signed off are signed off by the contractor and company.
conditions to confirm plans have Tech Services
Superintendent
3 Monthly by Engineering and Mine Operations as required (4) Check Geotech and Engineering Checklists
been reviewed, updated and
(3) Check Geotech and Engineering Checklists are are completed after plan development. (1) Physical inspection to confirm the road layout and
communicated as required intersections comply with the plan for company and
completed after plan development.
Management of traffic (4) Check contractor management plans are contractor operations
and traffic layout signed off by the contractor and company.
(2) Interview with sample of operators to confirm
information on the traffic management plan has been
Review of safety observations / (1) Check safety observations covering operation communicated.
area inspections. of vehicle for non-compliant radio communications.
Report on number of Area Supervisor Monthly (2) Check hazard reports and near miss/high
observations undertaken and potential reports for non-compliance with traffic (1) Check hazard reports and near miss/high
track trends. management plans relating to vehicle operations potential reports for non-compliance with traffic
Application of traffic Compliance with traffic layout / management plans relating to vehicle operations.
management plan management plan Confirm actions have been taken to address
Review of Supervisor reports and (1) Check Supervisor shift reports for hazards and hazards and non-compliance
hazard reports for site roadways. Area Manager Monthly incidents relating to roadway plan or traffic.
Identify non compliances and (2) Check actions identified in the report were
follow up actions taken. completed.
Inspection and preventative maintenance system Maintenance completed as scheduled Scheduled maintenance performed
Traffic plans are up to date and applicable Hazards identified relating to road design,
construction and maintenance are reported
Traffic layout complies with plan each shift.
Process for management of traffic and roadways
Shift handovers include information covering
Roadway design, construction and changes to roads and hazards that have not as
maintenance complies with procedures and yet been addressed
standards