AÑO ENE FEB MAR ABR MAY

1956 1 166.1 216.1 356.3 366 105.7


1957 2 116.7 139.5 295.3 538.8 135.1
1958 3 137 195.3 290 239.9 80.7
1959 4 132.2 137.2 336.4 252.8 83.6
1960 5 194.3 243.2 319 315 117.8
1961 6 233.3 197.4 390.2 313.1 114.7
1962 7 253.6 241.3 515.4 370.2 106.3
1963 8 154 291.7 471.7 290.6 100.8
1964 9 196.5 252.7 312.2 277.7 118.8
1965 10 115.4 126.7 415.5 223.6 97.2
1966 11 245.3 218.4 186.7 134.5 105
1967 12 185.5 168.3 449.4 173.3 96
1968 13 136.7 143.4 180.3 109 63.1
1969 14 111.1 137.8 212.7 216.2 100
1970 15 254.8 171.6 184.5 224.5 77.5
1971 16 345 294.4 811.2 483.2 126.1
1972 17 172.5 262.4 511.8 548.1 96.5
1973 18 220.6 295.9 403.2 415.4 158.9
1974 19 298.9 224.8 412.7 254 100
1975 20 228.8 235.4 377.6 324.6 97.7
1976 21 242.6 315 362.1 176.3 83.9
1977 22 159.7 424.4 297.8 186.7 93.8
1978 23 122.1 223.2 173.9 140.7 113.9
1979 24 125.8 248.5 505.3 231.3 102.1
1980 25 128.8 142.3 129.5 130 72.2
1981 26 159.4 477.1 394 177.7 86.7
1982 27 175.8 350.2 190 192.8 97.7
1983 28 341.4 202.6 386.1 330.8 153.5
1984 29 137.4 711 600 346.4 171.3
1985 30 142.5 158.5 172.5 174.5 83.5
1986 31 174.3 165.6 198.2 269.2 105.9
1987 32 301.6 292.7 215.4 159.1 113.7
1988 33 254.4 314.4 191 243.2 124
1989 34 203.2 339.4 345.2 312.7 106
1990 35 133.2 131.3 116.6 88.7 52
1991 36 120.5 143.8 354 134.7 90
1992 37 92.1 76.2 131.2 108.8 59.1
1993 38 105.1 324.4 740.3 616.4 170.5
1994 39 369.1 471.8 391.2 262.5 50
1995 40 141.9 151.9 228 230.1 77.8
1996 41 240 319.7 367.4 323.3 113.2
1997 42 103.6 192.2 135.6 73.2 57.9
1998 43 390.4 522.3 617.3 342.1 142.2
1999 44 163.1 508.9 315.5 209.7 119
2000 45 110.1 332.3 333.4 231.6 146
2001 46 367.9 307.3 500.9 227.1 78
2002 47 154.3 202.8 383.8 283.6 95
2003 48 165.1 221.2 258.2 190.3 85.1
2004 49 104.5 167.2 138 123.9 66.4
2005 50 148.4 162.4 294.2 179.2 78.2
2006 51 139.6 231.9 402.9 384.6 108.7
2007 52 218.3 196.8 321 330.6 117
2008 53 182.3 284.8 316.9 225.8 100

FACTOR DE FONDO Fb = 1.2


FACTOR DE ORILLA Fs = 0.2
Caudal Máximo de diseño =
Pendiente del cauce del río S = 0.0076
COEFICIENTE DE MANING n = 0.05
Canal rectangular =Caudal medio del río =Q med =
Caudal minimo =
caudal a derivarse =
pendiente del canal de derivacion Scanal = 0.0015
coeficiente de maning del canal = ncanal = 0.017
ancho del canal de derivacion al inicio
dos compuertas de regulacion
ancho del pilar de separacion entre compuertas de regulacion = 0.5
ventanas de captacion
altura del cauce del río a la cresta de la ventana de captacion h = 0.9
coeficiente de descarga de vertedero tipo Creager c1= 2.1
coeficiente de descarga bajo compuerta c2= 0.6
las ventanas de captacion llevan rejillas
profundidad en el sector de la compuerta despedradora = 0.7
talud de salida de la poza de disipacion z= 4
tres compuertas despedradoras 2,00 * 1,50 m
una compuerta desgravadora 1,50 * 1,50
pilares de separacion de compuertas = 0.6
vertedero lateral, coeficiente de descarga = 2.1
Longitud de transición = 4.1
cota del canal = 100 msnm
cota de fondo del río = 99.4 msnm
JUN JUL AGO SET OCT NOV DIC QMAX
64.4 45.2 45.9 46.1 71.5 66.9 74.6 366
95.9 59.8 53.5 63 87 66.9 119.7 538.8
58.3 47.9 48.4 76 96 108.9 124.4 290
62 48.6 50.6 50.7 91.6 95.1 191.8 336.4
68.1 49.6 49 48.3 61.2 97.2 102.4 319
82.1 42 40 55.8 61.1 166.9 288 390.2
72.6 56.3 53.9 67.7 59.7 81.4 87.4 515.4
53.5 42.3 42 48.8 63.6 130.2 237.5 471.7
61.6 65.4 47.7 44.4 73.9 103.6 144.1 312.2
50.3 42.1 44.8 34.2 95 99 140 415.5
77.4 63.5 62 67.3 118.7 135.8 128.4 245.3
60.5 49.8 47.5 49.3 116.6 102.4 110.1 449.4
46.6 33.2 37.4 50.3 82.4 94.8 100 180.3
68.6 51.7 49.5 53.2 85.9 106.3 150.5 216.2
59.5 48.1 52.8 66.3 104.4 164.9 285.7 285.7
89.7 59.7 53.4 61 84.6 66.9 64.8 811.2
51.7 67.8 60.2 60.6 70.8 93.5 134.6 548.1
84.5 69 61.3 72 131.7 164.8 233 415.4
76.4 57.9 52.4 68.2 98 229.8 431.3 431.3
71.7 52.5 51.9 66.8 95 161 276.8 377.6
73.3 58.4 53.7 56.2 78.2 85.5 95.9 362.1
68.7 52 53.2 53.9 66.7 113.7 127 424.4
64.1 53.2 42.8 65.9 66.8 100.2 118.4 223.2
63.1 51.6 50.6 61.7 73.9 100.8 113.3 505.3
64.7 50.7 54.1 72.4 108.7 138.9 238.6 238.6
66.9 54.7 47.6 44.4 89.6 171 195 477.1
65.5 48.9 43 48.7 107.1 181.8 257.1 350.2
89.5 63.8 53.4 54 70.5 94.3 176.9 386.1
93.5 58.6 45 45.1 106.7 78.8 144 711
46.7 35.3 34.4 52.2 53.2 62.7 89.8 174.5
54.6 40.8 38.2 39.7 57 83 131.6 269.2
55.2 46.3 41.4 48.9 62.4 114.3 173.6 301.6
62.2 46.1 41.4 48.5 61.8 85.7 87.8 314.4
61.3 39.9 33.8 37.4 100.5 90.5 67.3 345.2
48 38.8 38.4 37.8 84.7 143.4 114.3 143.4
49.2 38.8 38.6 39.3 54.2 61.6 85.3 354
38.5 30.5 29.7 29.2 48.1 47.6 60.1 131.2
62 43.8 38.8 57.6 96.2 202.9 275.9 740.3
44.9 48 40.6 45.5 44.6 70.6 103.2 471.8
46.7 38.7 41.1 43 47.3 94.8 114.4 230.1
74.5 62.7 51.8 50.2 73.6 75.2 79.7 367.4
39.4 37.6 37.6 48.5 52.5 112.3 279.1 279.1
70 52.3 50.4 50.2 97.8 106.3 83.3 617.3
63 45 43.6 55.9 60.2 66.3 148.4 508.9
63.3 43.8 43.8 45.5 53.1 61.2 93.7 333.4
56.6 47.8 44.5 49.8 57.4 173 180.7 500.9
55.5 51 41.2 41.9 73.7 166.6 185.1 383.8
56.3 46.9 44.3 42.5 63.1 60.8 135.4 258.2
44.8 36.4 34.9 33.9 81.9 149.2 167.7 167.7
54.3 48.3 45.9 47.3 62.6 65.5 115.8 294.2
73.9 57.1 53 33 23 48 40 402.9
59.7 46 56.2 47.4 71.4 105.6 143.1 330.6
58.4 45.8 55.8 47.4 70.4 103.5 139.6 316.9
TOTAL 19830.70
CAUDAL MINIMO MINIMO
CAUDAL PROMEDIO

CAUDAL DE DERIVACION
QMIN QPROM QMAX * QMAX
45.2 135.4 133956.00
53.5 147.6 290305.44
47.9 125.2 84100.00
48.6 127.7 113164.96
48.3 138.8 101761.00
40 165.4 152256.04
53.9 163.8 265637.16
42 160.6 222500.89
44.4 141.6 97468.84
34.2 123.7 172640.25
62 128.6 60172.09
47.5 134.1 201960.36
33.2 89.8 32508.09
49.5 112.0 46742.44
48.1 141.2 81624.49
53.4 211.7 658045.44
51.7 177.5 300413.61
61.3 192.5 172557.16
52.4 192.0 186019.69
51.9 170.0 142581.76
53.7 140.1 131116.41
52 141.5 180115.36
42.8 107.1 49818.24
50.6 144.0 255328.09
50.7 110.9 56929.96
44.4 163.7 227624.41
43 146.6 122640.04
53.4 168.1 149073.21
45 211.5 505521.00
34.4 92.2 30450.25
38.2 113.2 72468.64
41.4 135.4 90962.56
41.4 130.0 98847.36
33.8 144.8 119163.04
37.8 85.6 20563.56
38.6 100.8 125316.00
29.2 62.6 17213.44
38.8 227.8 548044.09
40.6 161.8 222595.24
38.7 104.6 52946.01
50.2 152.6 134982.76
37.6 97.5 77896.81
50.2 210.4 381059.29
43.6 149.9 258979.21
43.8 129.8 111155.56
44.5 174.3 250900.81
41.2 144.5 147302.44
42.5 114.1 66667.24
33.9 95.7 28123.29
45.9 108.5 86553.64
23 133.0 162328.41
46 142.8 109296.36
45.8 135.9 100425.61
7460.09 393256662.49
23.00
140.76

5.75
Solucion:

DESARROLLO
N° Q m Q T
1 366 1 811.2 54
2 538.8 2 740.3 27
3 290 3 711 18
4 336.4 4 617.3 13.5
5 319 5 548.1 10.8
6 390.2 6 538.8 9
7 515.4 7 515.4 7.71428571
8 471.7 8 508.9 6.75
9 312.2 9 505.3 6
10 415.5 10 500.9 5.4
11 245.3 11 477.1 4.90909091
12 449.4 12 471.8 4.5
13 180.3 13 471.7 4.15384615
14 216.2 14 449.4 3.85714286
15 285.7 15 431.3 3.6
16 811.2 16 424.4 3.375
17 548.1 17 415.5 3.17647059
18 415.4 18 415.4 3
19 431.3 19 402.9 2.84210526
20 377.6 20 390.2 2.7
21 362.1 21 386.1 2.57142857
22 424.4 22 383.8 2.45454545
23 223.2 23 377.6 2.34782609
24 505.3 24 367.4 2.25
25 238.6 25 366 2.16
26 477.1 26 362.1 2.07692308
27 350.2 27 354 2
28 386.1 28 350.2 1.92857143
29 711 29 345.2 1.86206897
30 174.5 30 336.4 1.8
31 269.2 31 333.4 1.74193548
32 301.6 32 330.6 1.6875
33 314.4 33 319 1.63636364
34 345.2 34 316.9 1.58823529
35 143.4 35 314.4 1.54285714
36 354 36 312.2 1.5
37 131.2 37 301.6 1.45945946
38 740.3 38 294.2 1.42105263
39 471.8 39 290 1.38461538
40 230.1 40 285.7 1.35
41 367.4 41 279.1 1.31707317
42 279.1 42 269.2 1.28571429
43 617.3 43 258.2 1.25581395
44 508.9 44 245.3 1.22727273
45 333.4 45 238.6 1.2
46 500.9 46 230.1 1.17391304
47 383.8 47 223.2 1.14893617
48 258.2 48 216.2 1.125
49 167.7 49 180.3 1.10204082
50 294.2 50 174.5 1.08
51 402.9 51 167.7 1.05882353
52 330.6 52 143.4 1.03846154
53 316.9 53 131.2 1.01886792
Σ 19830.7
n= 53

Cálculo de Qm y Xm:

Qm= 374.164151

Xm= -0.6010

Cálculo de los parámetros a y b: De la ecuación (6.34), se tiene:

b = -281.56075

a = 204.9587

Cálculo del caudal máximo:


Sustituyendo los valores de los parámetros a y b, en la ecuación (6.32), se tiene:

Qm= T: 50
784.074551

Qm= T: 100
869.451935
Cálculo de las desviaciones estándar y covarianza:

Sxx = 719.448
SQQ = 57711012.2
SXQ = -202568.29

Calculo de los intervalos de confianza:

ΔQ=

Hallando X: T: 50
x: -2.0568 ΔQ= 56.86
T: 100
x: -2.3600 ΔQ= 57.67

Cálculo del caudal de diseño:

T: 50

Qd = 840.934551 m3/s

T: 100
Qd = 927.121935 m3/s
T/T-1 X Q*X Q2 X2
1.0188679245 -2.0905568 -1695.8597 658045.44 4.37042784
1.0384615385 -1.78541 -1321.739 548044.09 3.18768893
1.0588235294 -1.6051355 -1141.2514 505521 2.57646004
1.08 -1.4759448 -911.1007 381059.29 2.17841292
1.1020408163 -1.3747114 -753.47933 300413.61 1.88983151
1.125 -1.2911329 -695.66243 290305.44 1.66702428
1.1489361702 -1.2197122 -628.63967 265637.16 1.48769786
1.1739130435 -1.1571666 -588.8821 258979.21 1.33903461
1.2 -1.1013777 -556.52614 255328.09 1.21303277
1.2272727273 -1.0508976 -526.3946 250900.81 1.10438573
1.2558139535 -1.0046926 -479.33884 227624.41 1.00940723
1.2857142857 -0.9619983 -453.87078 222595.24 0.92544066
1.3170731707 -0.9222329 -435.01724 222500.89 0.85051345
1.35 -0.884943 -397.69341 201960.36 0.7831242
1.3846153846 -0.8497682 -366.50504 186019.69 0.72210607
1.4210526316 -0.8164165 -346.48718 180115.36 0.66653597
1.4594594595 -0.7846479 -326.02121 172640.25 0.61567235
1.5 -0.7542622 -313.32052 172557.16 0.56891147
1.5428571429 -0.7250904 -292.13891 162328.41 0.52575605
1.5882352941 -0.696988 -271.96471 152256.04 0.48579224
1.6363636364 -0.6698302 -258.62144 149073.21 0.44867248
1.6875 -0.643508 -246.97837 147302.44 0.41410254
1.7419354839 -0.6179252 -233.32855 142581.76 0.38183152
1.8 -0.592996 -217.86672 134982.76 0.35164421
1.8620689655 -0.5686431 -208.12336 133956 0.32335492
1.9285714286 -0.5447961 -197.27066 131116.41 0.29680276
2 -0.5213902 -184.57214 125316 0.27184777
2.0769230769 -0.4983651 -174.52748 122640.04 0.24836782
2.16 -0.4756639 -164.19919 119163.04 0.22625617
2.25 -0.4532322 -152.46731 113164.96 0.20541943
2.347826087 -0.4310173 -143.70118 111155.56 0.18577595
2.4545454545 -0.4089676 -135.20469 109296.36 0.1672545
2.5714285714 -0.3870314 -123.46301 101761 0.14979329
2.7 -0.3651563 -115.71804 100425.61 0.13333915
2.8421052632 -0.3432885 -107.92991 98847.36 0.117847
3 -0.3213712 -100.3321 97468.84 0.10327947
3.1764705882 -0.299344 -90.282153 90962.56 0.08960683
3.375 -0.2771409 -81.534866 86553.64 0.0768071
3.6 -0.254689 -73.859806 84100 0.06486648
3.8571428571 -0.2319055 -66.2554 81624.49 0.05378016
4.1538461538 -0.2086951 -58.246808 77896.81 0.04355365
4.5 -0.1849455 -49.78733 72468.64 0.03420484
4.9090909091 -0.1605213 -41.446594 66667.24 0.02576708
5.4 -0.1352554 -33.178141 60172.09 0.01829401
6 -0.108936 -25.992125 56929.96 0.01186705
6.75 -0.0812864 -18.703991 52946.01 0.00660747
7.7142857143 -0.0519316 -11.591136 49818.24 0.00269689
9 -0.0203412 -4.3977762 46742.44 0.00041377
10.8 0.01427844 2.57440283 32508.09 0.00020387
13.5 0.0532067 9.28456954 30450.25 0.00283095
18 0.09873802 16.5583653 28123.29 0.0097492
27 0.15575002 22.3345527 20563.56 0.02425807
54 0.23864661 31.3104353 17213.44 0.0569522
-31.85064 -15739.411 8508824.05 32.7153048

uación (6.32), se tiene:


DATOS DEL RIO:
Q: 5.75m³/s
Qmax: 927.12m³/s
S: 0.0076
0.05
rectangular
100msnm
140.76m³/s
23.00m³/s
0.017
0.7
2
0.50m
0.90m
2.1
0.6
3
1
2.00m
1.50m
0.50m
0.70m

DISEÑO DEL BARRAJE:


1) Calculo de la longitud de encausamiento del rio: (B)
1.1) Metodo de Bleuch:
�=1.81√(𝑄×𝐹𝑏/𝐹𝑠)
Formula:

Donde:

1.2) Metodo de Altunin:

Formula:

Donde:

1.3) Metodo de Petit:

�= 〖2.45×𝑄 〗 ^(
1/2)
�= 〖2.45×𝑄 〗 ^(
1/2)
Formula:

Donde:

1.4) Promedio del ancho de cauzamiento del rio (Bprom):

Metodo de Bleuch:
Metodo de Altunin:
Metodo de Petit:

Bprom:
𝑄=(�×𝑦_𝑛 〖 ×(�×𝑦_𝑛) 〗 ^(2/3))/(𝑛×(�+2×𝑦_𝑛 )
𝑄=( 〖
〖� ×� 〗 ^(2/3) 〖 ×𝑆 〗 ^(1/2))/𝑛

�=�𝑐𝑎𝑛×𝑌_1
𝑄=(�𝑐𝑎𝑛×𝑦_1 〖 ×(�𝑐𝑎𝑛×𝑦_1) 〗 ^(2/3))/
𝑄_1=𝑄_2

�_2=5/(3×𝑌_2 )………(𝐼)

𝐹_2=ɣ×�=(ɣ×(𝑌_2×𝑌_2×𝑏))/2

𝐹_2=(ɣ× 〖𝑌 _2 〗 ^2×𝑏)/2……….(III)

𝐹_1=(ɣ× 〖𝑌 _1 〗 ^2×𝑏)/2……….(IV)

𝐹_2−𝐹_(1=) (ɣ× 〖〖� _2 〗 ^2×𝑏


(ɣ× 〖
〖 ꝭ"
� _1 〗 ^2×𝑏)/2="×"Q"×"

(ɣ×𝑏)/2×( 〖𝑌 _2 〗 ^2−
〖𝑌 _1 〗 ^2)=(ɣ×𝑄)/𝑔×(�_1−�

�_1=𝑄_1/�_1 =𝑄_1/

〖� ���×𝑌 〗 _1 =

𝑏/2×( 〖𝑌 _2 〗 ^2−
〖𝑌 _1 〗 ^2)=𝑄/𝑔×(1.39−5/(3×𝑌_2 ))

1.5/2×( 〖𝑌 _2 〗 ^2− 〖 1.2 〗 ^2)=2.5/9.81×


(1.39−5/(3×𝑌_2 ))

�_2=5/(3×𝑌_2 )………(𝐼)

𝑌_1+ 〖
〖� _1 〗 ^2/(2×𝑔)
+ℎ_(1−2)=𝑌_2+ 〖� _2 〗 ^2/(2
𝑌_1+ 〖
〖� _1 〗 ^2/(2×𝑔)
+ℎ_(1−2)=𝑌_2+ 〖� _2 〗 ^2/(2

�_3+𝑌_3+ 〖 〖� _3 〗 ^2/(2×𝑔)=�_2+𝑌_2+
〖� _2 〗 ^2/(2×𝑔)+ℎ_(2−3)

ℎ_(2−3)=�×( 〖� _2
〗 ^2 〖〖−�〗 _3 〗 ^2)/
(2×𝑔)
�_3=�_2=0

𝑌_3+ 〖
〖� _3 〗 ^2/(2×𝑔)=𝑌_2+ 〖� _2 〗 ^2/(2×𝑔)
+1.1×( 〖〖 (� 〗 _2 〗 ^2 〖〖−�〗 _3 〗 ^2))/(2×𝑔)

𝑌_3+ 〖
〖� _3 〗 ^2/(2×9.81)=1.2+ 〖 2.1×1.39 〗 ^2/
(2×9.81)−(1.1 〖〖 ×� 〗 _3 〗 ^2)/(2×𝑔)

�_3=5/(3×𝑌_3
)=

𝑌_3+(( 〖5/ 〖3×𝑌 〗 _3 ) 〗 ^2×1/(2×9.81))=1.2+(2.1× 〖 1.39 〗 ^2)/(2×9.81)−(( 〖 5/


〖 3×𝑌 〗 _3 ) 〗 ^2×1.1/(2×𝑔))

�_3=5/(3×𝑌_3
)
ℎ_(2−3)=�×( 〖 (�_3 〗 ^
2 〖〖−�〗 _4 〗 ^2))/
(2×𝑔)

�_4=𝑄/�_1 =2.5/(�×𝑌_4 )=2.5/


(5×𝑌_4 )

�_4=1/
(2×𝑌_4 )

1.2+ 〖1.39 〗 ^2/(2×9.81)+1.1×( 〖 (1.39 〗 ^2−( 〖 2.5/(5×𝑌_4 )) 〗 ^


(2×9.81)=𝑌_4 〖 +(2.5/(5×𝑌_4 )) 〗 ^2 1/(2×9.81)+0.5

�_4=2.5/
(�×𝑌_4 )

ℎ_(3−4)=�×( 〖� _3
〗 ^2 〖〖−�〗 _4 〗 ^2)/
(2×𝑔)

ℎ_(3−4)=𝑌_4+ 〖
〖� _4 〗 ^2/(2×𝑔)
+ℎ_0−𝑌_3− 〖� _3 〗 ^3/(2×𝑔)
𝑄=�×𝐿× 〖� _� 〗 ^
(3/2)
�_�=( 〖
〖 �/
(�×𝐿)) 〗 ^(2/3)

�𝑜𝑡𝑎 𝑑𝑒𝑙 𝑏𝑎𝑟𝑟𝑎𝑗𝑒=Cota del canal+ℎ_1+𝑌_4+ 〖(10%×ℎ 〗 _4)

𝑁�𝑀�=Cota del barraje+�_�

�𝑀𝑃�=NAME+ 〖(20%×� 〗 _�)


𝑄_1=�×�_1×√(2×9.81×"Δ"
ℎ_1 )

𝑄_2=�_2×�_2×√(2×9.81×"Δ" ℎ

�_1=𝑒×�

𝑌_𝑛=�𝑂𝑇� max 〖� � �� ��−〖"Δ" ℎ_1−"Δ"


〗 ℎ_2−�𝑂𝑇� 𝑓𝑜𝑛𝑑𝑜 𝑑𝑒𝑙
𝑐𝑎𝑛𝑎𝑙−(3%×𝐿_�)

𝑄=( 〖
〖� ×� 〗 ^(2/3) 〖 ×𝑆 〗 ^(1/2))/𝑛 𝑄=( 〖(1.5×𝑌_𝑛)×((1.5×𝑌_𝑛)/(1.5+2

"Δ" ℎ_1=

𝑌_𝑛=1.31
-
"Δ"
ℎ_2=

𝑌_𝑛=1.31−[(( 〖(1.5×𝑌_𝑛 )×((1.5×𝑌_𝑛)/(1.5+2×𝑌_𝑛 )) 〗 ^(2/3) 〖×(0.0016) 〗 ^(1/2))/0.017)/


(9.57 )]^2−[(( 〖(1.5×𝑌_𝑛 )×((1.5×𝑌_𝑛)/(1.5+2×𝑌_𝑛 )) 〗 ^(2/3) 〖×(0.0016) 〗 ^(1/2))/0.017)/
(4.85 )]^2
𝑌_𝑛=1.31−[(( 〖(1.5×𝑌_𝑛 )×((1.5×𝑌_𝑛)/(1.5+2×𝑌_𝑛 )) 〗 ^(2/3) 〖×(0.0016) 〗 ^(1/2))/0.017)/
(9.57 )]^2−[(( 〖(1.5×𝑌_𝑛 )×((1.5×𝑌_𝑛)/(1.5+2×𝑌_𝑛 )) 〗 ^(2/3) 〖×(0.0016) 〗 ^(1/2))/0.017)/
(4.85 )]^2

𝑄=( 〖(1.5×𝑌_𝑛)×((1.5×𝑌_𝑛
𝑄=( 〖
〖� ×� 〗 ^(2/3) 〖 ×𝑆 〗 ^(1/2))/𝑛

ℎ_𝑇=𝑌_𝑛+"Δ" ℎ_2+(20%×(𝑌_𝑛 "+Δ"


ℎ_2))

𝑏_𝐿=15%×𝑌_1

�^1.85= 〖2×�_� 〗
^2×𝑌

�_�= 〖� ���〖_�𝑎𝑟𝑟𝑎𝑗𝑒×
〗 〖�𝑂𝑇�〗
_�𝑖𝑜

�_�= 〖� ���〖_𝑁�𝑀�×
〗 〖�𝑂𝑇�〗 _(�𝑙𝑡𝑢𝑟𝑎
𝑑𝑒 𝑏𝑎𝑟𝑟𝑎𝑗𝑒)

�_�=�_�
/0.89
�_�=�_�
/0.89

d= 〖0.11×� 〗 _

�_2=0.5�_�

�_1=0.2�_�

𝐼_2=0.282×�_�

𝐼_1=0.175×�_�

�^1.85= 〖2×�_� 〗
^2×𝑌
�_0=�_1
�_0=𝑟+�+�_�+ 〖
〖� _0 〗 ^2/(2×𝑔)

�_1=𝑌_1+ 〖
〖� _1 〗 ^2/(2×𝑔)


〖� _1 〗 ^2/(2×𝑔)=𝑟+�+�_�+𝑌_1

�_1=𝑄/�=𝑄/
(𝐿×𝑌_1 )

𝑌_2=−𝑌_1/2+√( 〖〖� _1 〗 ^2/4+


(〖
〖� _1 〗 ^2×𝑌_1)/𝑔)
𝑄_𝑚𝑎𝑥=𝑄_�+𝑄_𝑃

𝑄_𝑏= 〖
〖� ×𝐿×� 〗 ^(3/2)
………………(𝐼)

�_1=�_2
�_1=0.5+𝑌_2+ 〖� _2 〗
^2/(2×𝑔)

�_2=𝑄_𝑚𝑎𝑥/�
_2
𝑄_𝑑=𝑄_𝑎=

�_�= 〖(𝑄_�/
(�×𝐿_� )) 〗 ^(3/2
)

�_𝑇=�_�−𝑎

𝑒_𝑎=�_�

�_1=(𝑄_𝑑/(�_2×�))×1/
(2×𝑔)=(𝑄_𝑚𝑒𝑑𝑖𝑜𝑑𝑒𝑙𝑟𝑖𝑜/(�_2×𝑒_𝑎 ))^2
�_1+�_1=�+0.5
�_1=�+0.5−�_1
𝑄=( 〖
〖� ×�×� 〗 ^(2/3) 〖 ×

𝑆𝑓=(𝑄^2×𝑛^2)/�^2 ×1/�^(4/3) =(( 〖� ×𝑛) 〗 ^2)/�^(

�^2=𝑄^2/�^2

(( 〖
〖� ×𝑛) 〗 ^2)/�^(4/3)

�=�/𝑃=(�×𝑌_𝑛)/(�+ 〖 2×𝑌 〗 _𝑛 )

�=𝑌+�^2/(2×𝑔)

𝝙𝑆=𝝙�/(𝑆0+𝑆𝑓)
L=(𝑄_1×𝑄_2)/(�×√((
5.75m³/s :Caudal de derivacion
927.12m³/s :Caudal maximo de diseño (rio)
0.0076 :Pendiente del rio
0.05 :"n"manning del rio
rectangular :Seccion del canal
100msnm :Cota de inicio del canal
140.76m³/s :Caudal medio del rio
23.00m³/s :Caudal minimo del rio
0.017 :"n" del canal
0.7 :Ancho del canal
2 :N° de compuertas
0.50m :Ancho de muro de separacion entre ventana de captacion
0.90m :Altura del cauce del rio a cresta de la ventana de captacion
2.1 :C.creager
0.6 :Coeficiente sumergido
3 :N° de compuertas despedradoras
1 :N° de compuertas desgradadoras
2.00m :Ancho de la compuerta despedradoras
1.50m :Ancho de la compuerta desgradadoras
0.50m :Ancho de los pilares entre compuertas
0.70m :Profundidad en el sector de compuerta despedradora

𝑄×𝐹𝑏/𝐹𝑠)

B: 135.00m
Fb: Material Grueso
Fs: Material ligeramente cohesivo

�= 〖
〖 � ×𝑄 〗
^(1/2)/𝑆^(
1/5)

B: 80.80m
a: Rio poco caudaloso

�= 〖2.45×𝑄 〗 ^(
1/2)
�= 〖2.45×𝑄 〗 ^(
1/2)

B: 74.60m :Ancho de ancauzamiento

zamiento del rio (Bprom):

Metodo de Bleuch: 135.00m


Metodo de Altunin: 80.80m
Metodo de Petit: 74.60m

96.80m
𝑦_𝑛) 〗 ^(2/3))/(𝑛×(�+2×𝑦_𝑛 )^(2/3) )×𝑆^(1/2)
� 〗 ^(2/3) 〖 ×𝑆 〗 ^(1/2))/𝑛

�=�𝑐𝑎𝑛×𝑌_1 �=�/𝑃= 〖〖� ���×𝑌 〗 _1/


(�+2×𝑌_1 )
×𝑦_1 〖 ×(�𝑐𝑎𝑛×𝑦_1) 〗 ^(2/3))/(𝑛×(�𝑐𝑎𝑛+2×𝑦_1 )^(2/3) )×𝑆^(1/2)
�_2=�_1/�_2 �_2=2.5/(1.5×𝑌_2 )
𝑄_1=𝑄_2 ×�_1
�_1
�_2=5/(3×𝑌_2 )………(𝐼)

𝐹_2−𝐹_(1=)ꝭ×Q×(�_1×�_2)………..
(𝐼𝐼)

𝐹_2=ɣ×�=(ɣ×(𝑌_2×𝑌_2×𝑏))/2

𝑌 _2 〗 ^2×𝑏)/2……….(III)

𝑌 _1 〗 ^2×𝑏)/2……….(IV)

𝐹_2−𝐹_(1=) (ɣ× 〖〖� _2 〗 ^2×𝑏)/2−


(ɣ× 〖
〖 ꝭ"
� _1 〗 ^2×𝑏)/2="×"Q"×"(" �_1×�_2)

(ɣ×𝑏)/2×( 〖𝑌 _2 〗 ^2−
〖𝑌 _1 〗 ^2)=(ɣ×𝑄)/𝑔×(�_1−�_2)

2 )………(𝐼)

𝑌_1+ 〖
〖� _1 〗 ^2/(2×𝑔)
+ℎ_(1−2)=𝑌_2+ 〖� _2 〗 ^2/(2×𝑔)
𝑌_1+ 〖
〖� _1 〗 ^2/(2×𝑔)
+ℎ_(1−2)=𝑌_2+ 〖� _2 〗 ^2/(2×𝑔)

1.2+ 〖1.34 〗 ^2/


(2×9.81)+ℎ_(1−2)=1.2+ 〖 1.39 〗 ^2/
(2×9.81)


� _3 〗 ^2/(2×𝑔)=�_2+𝑌_2+
2×𝑔)+ℎ_(2−3)
�_3+𝑌_3+ 〖
〖� _3 〗 ^2/(2×𝑔)
+ℎ_(3−4)=�_4+𝑌_4+ 〖� _4 〗 ^2/(2×𝑔)+ℎ_4

�_3=�_4=0

�×( 〖 (�_3 〗 ^
〗 ^2))/

(1.39 〗 ^2−( 〖 2.5/(5×𝑌_4 )) 〗 ^2))/


2 1/(2×9.81)+0.5

ℎ_(3−4)=�×( 〖� _3
〗 ^2 〖〖−�〗 _4 〗 ^2)/
(2×𝑔)

^2/(2×𝑔)
2×𝑔)
0%×ℎ 〗 _4)
𝑄_1=�×�_1×√(2×9.81×"Δ" 𝑄_1=𝑄_2
ℎ_1 )

×√("Δ"
ℎ_1 )

𝑄_2=�_2×�_2×√(2×9.81×"Δ" ℎ_2 )

×√("Δ"
ℎ_2 )

�𝑂𝑇� 𝑓𝑜𝑛𝑑𝑜 𝑑𝑒𝑙

−"Δ"
ℎ_1−"Δ" ℎ_2

𝑄_1=𝑄_2=𝑄

〖(1.5×𝑌_𝑛)×((1.5×𝑌_𝑛)/(1.5+2×𝑌_𝑛 )) 〗 ^(2/3) 〖 ×(0.0016) 〗 ^(1/2))/0.017

[𝑄_1/(1
)]^2
[𝑄_2/(1
)]^2

16) 〗 ^(1/2))/0.017)/
0016) 〗 ^(1/2))/0.017)/
16) 〗 ^(1/2))/0.017)/
0016) 〗 ^(1/2))/0.017)/

𝑄=( 〖(1.5×𝑌_𝑛)×((1.5×𝑌_𝑛)/(1.5+2×𝑌_𝑛 )) 〗 ^(2/3) 〖 ×(0.0016) 〗 ^(1/2))/0.017

%×(𝑌_𝑛 "+Δ"

�〖_�𝑎𝑟𝑟𝑎𝑗𝑒×
〗 〖�𝑂𝑇�〗

�〖_𝑁�𝑀�×
〗 〖�𝑂𝑇�〗 _(�𝑙𝑡𝑢𝑟𝑎
�_2=0.5�_�

�_1=0.2�_�

𝐼_2=0.282×�_�

𝐼_1=0.175×�_�

[�^1.85/1]
=𝑌
𝑟+�+�_�+ 〖
〖� _0 〗 ^2/(2×𝑔) �_0=0

1+ 〖
〖� _1 〗 ^2/(2×𝑔)

×𝑔)=𝑟+�+�_�+𝑌_1

𝑌_𝑐𝑎𝑙=𝑄/
(𝐿×�_1 )

〗 ^2/4+
�_0=�_1
𝑄_𝑚𝑎𝑥=𝑄_�+𝑄_𝑃

𝑄_𝑃=�_2×�_2×√(2×𝑔×�_1 )=𝑄_𝑑

𝑄_𝑃= 〖 ×� 〗 _2×√(2×9.81×�_1
)=𝑄_𝑑
𝑄_𝑃= 〖 ×� 〗 _2×√(�_1
)=𝑄_𝑑

�_1=�_2
�_1=0.5+𝑌_2+ 〖� _2 〗
^2/(2×𝑔)

�_2=𝑄_𝑚𝑎𝑥/�
_2
�_1=�_2

𝑄_�=𝑄_𝑚𝑎𝑥−𝑄_
𝑑

�_�= 〖(𝑄_�/
(�×𝐿_� )) 〗 ^(3/2
)

_𝑇=�_�−𝑎

�=𝑓(𝑎/�)=

1/
𝑖𝑜/(�_2×𝑒_𝑎 ))^2
�_1 𝑑𝑖𝑓𝑒𝑟𝑒𝑛𝑡𝑒 �_2

𝑄_𝑃= 〖 ×� 〗 _1×√(�
_1 )=𝑄_𝑑

𝑄_�=𝑄_𝑚𝑎𝑥−𝑄_
𝑑

�_�= 〖(𝑄_�/
(�×𝐿_� )) 〗 ^(3/2
)

𝑒_𝑎=𝑎/�_𝑇

�_1=(𝑄_𝑑/(�_2×𝑒_𝑎 ))^2

�_𝑇=�_�−𝑎


〖� ´ 〗 _1=�+0.5−�_1
𝑄=( 〖
〖� ×�×� 〗 ^(2/3) 〖 ×𝑆 〗 ^(1/2))/𝑛

𝑆=𝑆𝑓

/�^(4/3) =(( 〖� ×𝑛) 〗 ^2)/�^(4/3)

2=𝑄^2/�^2 �=𝑄/�

(( 〖
〖� ×𝑛) 〗 ^2)/�^(4/3)

)/(�+ 〖 2×𝑌 〗 _𝑛 )
𝝙�

Y=�^1.85/4.36

〖� _1 𝑄 〗 _2=�_2 𝑄_1

〖� _1 𝑄 〗 _2=�_2

𝑄_1−𝑄_𝑣𝑒𝑟𝑡𝑒𝑑𝑒𝑟𝑜
〖� _1 𝑄 〗 _2=�_2

𝑄_1−𝑄_𝑣𝑒𝑟𝑡𝑒𝑑𝑒𝑟𝑜
�_2=�_1×𝑄_2/𝑄_1

L=(𝑄_1×𝑄_2)/(�×√((2×𝑔))× 〖� _0 〗 ^(3/2) )
Rugosas, corrientes en terreno rocoso de montaña

:Ancho de ancauzamiento
1.2 :Factor de fondo
0.2 :Factor de orilla

:Ancho de ancauzamiento
1.00 :Factor del material
= 100.00m :Ancho asumido exacto
�_2=2.5/(1.5×𝑌_2 )
�_1
�_1=�_2
eno rocoso de montaña

Ancho de ancauzamiento
Factor del material
FACTOR DE FONDO:
Material Fb
Material Fino 0.8
Material Grueso 1.2

Material Fs
Material suelto 0.1
Material ligeramente cohesivo
0.2
Materiales cohesivo 0.3

FACTOR DEL MATERIAL


Parametros caracteristicosa
Cauce rocoso 0.50
Cauce formado con cantos rodados
0.75
Rio poco caudaloso 1.00

Coeficiente Coeficiente
  de   de
Manning Manning
Cunetas
En tierray
canales sin
ordinaria,
0,020-
revestir
superficie
En tierra 0.002
0,025
uniforme
ordinaria,y 0,025-
En lisa
tierra
superficie 0,035 0.025
con
irregular 0,040-
En tierra 0.04
vegetación 0,050
excavada
En roca, 0,028-
espesa
En roca, 0.028
mecánicame
superficie 0,033
0,030-
superficie
nte 0.03
uniforme y 0,035
con aristas 0,035-
lisa y
Cunetas 0.035
e 0,045
Canales
irregularida
revestidos
des
Hormigón 0,013-0,017 0.013
Hormigón
0,016-
revestido
0,022
con gunita 0.016
0,020-
Encachado
0,030 0.02
Paredes de
hormigón, 0,017-
fondo de 0,020
grava
Paredes 0.017
encachadas, 0,023-
Revestimien 0.023
fondo de 0,033
to
grava 0,013-0,016 0.013
Corrientes
bituminoso
Naturales

Limpias,
orillas
rectas,
fondo
0,027-
uniforme, al
0,033
tura de
lamina de
agua
suficiente
0.027
Limpias,
orillas
rectas,
fondo
uniforme, al
0,033-
tura de
0,040
lamina de
agua
suficiente,
algo de
vegetación
0.033

Limpias,
meandros,
embalses y 0,035-
remolinos 0,050
de poca
importancia
0.035

Lentas, con
embalses
profundos y 0,060-
canales 0,080
ramifi-
cados
0.06

Lentas, con
embalses
profundos y
canales 0,100-
ramifi- 0,200
cados,
vegetación
densa
1.1

Rugosas,
corrientes
0,050-
en terreno
0,080
rocoso de
montaña
0.05
Areas de
inundación
0,030-
adyacentes
0,200
al canal
ordinario
0.03
DATO DEL PROFESOR PARA EL RIO:
Coeficiente
  de promedio
Manning
0.025 0.0135

0.035 0.03
0.05 0.045
0.033 0.0305
0.035 0.0325

0.045 0.04

0.017 0.015

0.022 0.019

0.03 0.025

0.02 0.0185
0.033 0.028
0.016 0.0145

0.033 0.03
0.04 0.0365

0.05 0.0425

0.08 0.07

0.2 0.65

0.08 0.065
0.2 0.115
0.048