P17-047 Schedule PDF
P17-047 Schedule PDF
1 Busway system
Delivery on Site
2 Power panel (DB-COMP-2)
Delivery on Site
3 Capacitor panel
Delivery on Site
4 Cable & trunking & Other
II Installation work
7 Panel installation
Request Power turn-off
8 Busway installation
Temporary cable connection to DB_COMP for runing
9 Cable connection work for HP4, HP6
Request Power turn-off by each Panel (discussion later)
8 Cable connection work for Capacitor panel
1 Handover document
4 Defect work