Work Inspection
Contract No. 012018 ST-WC-784-R00
Request No.
MOHAMED HARASANI
To Consultant Date 27-10-2019
ARCHITECTS
Date Inspection 27-10-2019
استالم أعمال تثبيت ألواح الحماية لعزل
Requested
على الحائط الساند الجنوبي منPVC
Time Inspection
Description Of Works To Be منسوب 11:00 AM
Requested
Inspected And / Or Tested ) - 04.00 ( ) الي منسوب- 06.00 (
Civil Architectural
Part( B)
Discipline Mechanical Electrical
Other (specify)
Location بحسب المكان المشار إليه بالمخطط المرفق
Block No.
Level
Element
MHA PM
Engineer’s Decision
Ali Hurmuzlu Mohamed A. Abdul Jalil
(the work is)
Date Signature
Signature
A) – Work shall only proceed when action is only approved or approved as noted
B) – Approval of this document does not release contractor of his obligations