JOBE MATRIX FOR SCOPE OF WORK-KAGEM PROJECT

Basu Engg CREW Local Kagem


• Technical design and construction of sufficient processing
technology of the feeding material
• Mechanical assembly according EN 1090
• Supervision of erection
• Commissioning, training
• Accommodation on site
• Assembly personnel qualified according EN1090
• Product feed (controlled)
• Conveyor belts and distribution devices for product feed
• Conveyor belts and distribution devices for logistic of sorting products
• Chutes for feeding of sorters and between sorters
• Conveyor belts and distribution devices for product discharge (after MINEXX)
• Chutes after sorter for discharge of material
(standard chute for sorter included)
• All supply lines (compressed air, fresh water, power, e.g.)
• Washing and Drying equipment for material to be sorted in front of the sorter
• Screening equipment for maintaining required fractions for sorter
• Dried compressed air in sufficient quality and quantity
according to specification in technical description
• Water treatment for the required fresh water if necessary
• Mechanical assembly, conversions, wall- and roof passages or -
breakthroughs and necessary disassembly work in front of
existing plant components etc. according EN1090
• Office for Binder erection master and commissioning personnel
(for assembly monitoring)
• Provision of a broad-band internet connection directly
at the low voltage switch board of the MINEXX
• Waste disposal
• All official authorizations
• Carrying out of all official measurements or expert opinions resp.
(dust, noise level etc.)
• Waste water treatment if necessary
• Exhaust air ducts and installation for discharging dusty air directly
at the underflow chute of MINEXX (Exhaust air fan and filter unit included)
• All required pipes and discharge systems for the operation of the optical sorting plant
• Peripheral equipment for the sorting plant such as conveyor belts,
chutes, steel structures, buildings e.g. Integration of all items
mentioned in scope of supply in customers plant low voltage switch gear
except MINEXX aswell as all electrical work with cabling, wiring etc
• Integration in the plant control system of customer
as well as connection to control room
• Power supply up to the input terminals of the low-voltage switchgear of MINEXX
• Check of all on-site equipment for function and correct input- and protective
measures output circuitry as well as performing rotational-direction checks
of the individual motors and check of the
• All cable ducts, cable channels and trays with support
• Planning and execution of cabling work
• Insulation if necessary
• Special coating (type and/or paint) for purchased parts like pumps, valves, e.g.
• Inspections- and catwalks with railing and ladders
• Support (concrete or steel structure) for scope of supply
• Possible changes, reinforcement and additionally required
supports in the steel construction of the existing building
• Recording of measurements on site for the planning
• Provision of all necessary materials and utilities
for the startup of the scope of supply
• Provision of feed material according to the technical description
regarding amount, composition as well as properties
for the continuous operation of the scope of supply
• Provision of free access to vibrating feeder of sorter, eject and
throughput of sorter during performance test run
• Qualified personnel for operation and maintenance of the plant
for the whole period of start up for training them on the machines
• Belt weigher for analyzing of the mass flow of feed
• Provision of continuous control of the feed