You are on page 1of 14

From Mile stone 0 to Milestone 1

From 0 20 40 60 77 97 117
X in M. 2 -2 -2.1 -2.2 -2.8 2.9 3
D in M. 1.2 1.2 1.4 1.5 1.65 1.4 1.5
From 629 649 657 677 697 717 737
X in M. -3 -2.9 -3.2 -3.1 -3.2 -3.3 -3.4
D in M. 2 2 1.65 1.2 1.3 1.4 2.4
137 157 177 197 217 237 257 277 297 299
3.1 3 3.1 3.2 3 2.9 3.1 3.2 3.3 3.25
1.4 1.5 1.65 1.5 1.4 1.2 1.3 1.6 1.5 1.65
757 777 797 815 835 855 875 895 915 935
-3.2 -3.3 -3.3 -3.5 -3.2 -3.3 -3.4 -3.2 -3.1 -3
2.5 1.6 1.6 1.65 1.6 3.2 2.9 1.6 1.6 1.62
317 337 357 377 397 409 429 437 457 477
3.2 3.2 3.1 3 2.9 3.1 3.3 -3.2 -2.1 -2.2
1.2 1.3 1.4 1.5 1.5 1.6 1.6 1.65 1.5 2
941 961 981 1000
-3.5 -3.2 -3.3 -3.4
1.65 1.66 1.6 1.65
497 517 537 557 569 589 609
-2.3 -2.4 -2.5 -2.6 -2.85 -2.9 -3.1
2.1 2.2 1.5 1.6 1.65 1.2 1.5
LINK NAME…..MUMBAI-SURAT2 COSTAL SECTION NAME…valsad-daman NLD_4B
50 0
45 RC - 20.58890 72.94543, 2.83MTR
EP - 20.58889 72.94543, 1.1 MTR
40 HOUSE CORNER - 20.58888 72.94535 11 MTR 0
RC - 20.58890 72.94543, 2.83MTR 35
EP - 20.58889 72.94543, 1.1 MTR 0
30
30 HOUSE CORNER - 20.58888 72.94535 11 MTR 0
25 RC - 20.58897 72.94228, 3.3MTR RC - 20.58918 72.94216, 5.3MTR
5.2
0 A 0
20 EP - 20.58895 72.94226, 3.4 MTR COMPOUND WALL- 20.58920 72.94218, 1.68 MTR
205.2 2 HOUSE CORNER - 20.58893 72.94226 5 MTR EP - 20.58918 72.94220 4MTR
0
10 0
10
10 03 03 03 03 03 03 03 03 03 03 03 03 03
0
0-2 0-2 0-2 0-3 0-3 0-2 0-2 0-2 0-2 0-3 0-3 0-3 0-3 0-3
0 20 40 60 77 97 117 137 157 177 197 217 237 257 277 297 299 317 337 357 377 397 409 429 437 457 477 497 517 537 557 569 589 609
-10
-20 CH-0.020(CP) CH-0.077HH) CH-0.177 (CP) CH-0.299(CP) CH-0.409(HH) CH-0.437(HH) CH-0.569 (CP)
20.58842 20.5889 20.58882 20.5889 20.58896 20.58918 20.58938
-30 72.94557 72.94543 72.94449 72.94333 72.94227 72.94217 72.94092
-40
-50

ROAD CHAINAGE 0 20 40 60 77 97 117 137 157 177 197 217 237 257 277 297 299 317 337 357 377 397 409
DUCT OFFSET 10 -2 -2 -2 -3 3 45 30 3 3 3 20 3 10 25 3 3 3 35 3 3 3 3
DUCT DEPTH 1.20 1.20 1.40 1.50 1.65 1.40 1.50 1.40 1.50 1.65 1.50 1.40 1.20 1.30 1.60 1.50 1.65 1.20 1.30 1.40 1.50 1.50 1.60
NUMBER OF DUCTS 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
MM/HH/DUCT COUPLER ZMH CP CP CP CP HH
TYPE OF SOIL Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma
CROSSING DETAILS l l l l l l l l l l l l l l l l l l l l l l l
OWNERSHIP DETAIL Valsad R&B Valsad R&B Valsad R&B Valsad R&B Valsad R&B Valsad R&B Valsad R&B
METHOLOGY (HDD/OT/MO HDD HDD HDD HDD HDD HDD HDD
PROTECTION MEASURE
50
40
RC - 20.58956 72.94009, 3.2MTR
30 GATE- 20.58953 72.94010, 4.9MTR
COMPOUND WALL - 20.58953 72.94010, 5 MTR
20
10
-3 0 0 0 0 0 0 0 0 0 0 0 0 0
0-3 -3 -3 -3 -3 -3 -3 -3 -3 -4 -3 -3 -3 -3 -3 -3 -4 -3 -3 -3
-10629 649 657 677 697 717 737 757 777 797 815 835 855 875 895 915 935 941 961 981 1000 0 0 0 0 0 0 0 0 0 0 0 0 0
-20 CH-0.657 (HH) CH-0.941(CP)
20.5895 CH-0.815 (CP)
20.59203
-30 72.9401 20.5909
72.94038
72.94019
-40
-50
-20 CH-0.657 (HH) CH-0.941(CP)
20.5895 CH-0.815 (CP)
20.59203
-30 72.9401 20.5909
72.94038
72.94019
-40
-50
ROAD CHAINAGE 629 649 657 677 697 717 737 757 777 797 815 835 855 875 895 915 935 941 961 981 1000 0 0
DUCT OFFSET -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -4 -3 -3 -3 -3 -3 -3 -4 -3 -3 -3 0 0
DUCT DEPTH 2.00 2.00 1.65 1.20 1.30 1.40 2.40 2.50 1.60 1.60 1.65 1.60 3.20 2.90 1.60 1.60 1.62 1.65 1.66 1.60 1.65 0.00 0.00
NUMBER OF DUCTS 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
MM/HH/DUCT COUPLER HH CP CP
TYPE OF SOIL Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma
CROSSING DETAILS l l l l l l l l l l l l l l l l l l l l l l l
OWNERSHIP DETAIL Valsad R&B Valsad R&B Valsad R&B Valsad R&B Valsad R&B Valsad R&B
METHOLOGY (HDD/OT/MO HDD HDD HDD HDD HDD HDD HDD
PROTECTION MEASURE

LEGEND
Date of Execution ITP Man Hole Installation By DWC Traffic Signal
Culvert
Engineer Name PIPE Duct Couper Pole
Phone No. Hand Hole Installation By GI Transformer
Bridge
Area Manager Name PIPE DWC Couper Telephone
Phone No. Route Marker Installation By PBC Pole
Railway Track
ITP. No/Page No. PIPE GI Couper
Link name (as per Engg.) Kiometre Stone Installation BY HDD Electric Pole
CHAINAGE 0 to 1

429 437 457 477 497 517 537 557 569 589 609
3 -3 -2 -2 -2 -2 -3 -3 -3 -3 -3
1.60 1.65 1.50 2.00 2.10 2.20 1.50 1.60 1.65 1.20 1.50
2 2 2 2 2 2 2 2 2 2 2
HH CP
Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma
l l l l l l l l l l l
Valsad R&B Valsad R&B Valsad R&B
HDD HDD HDD
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 2 2 2 2 2 2 2 2

Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma
l l l l l l l l l l l

HDD HDD HDD

HT Tower ILA Note- It has been checked


and found that the data is
Telecome Tower AG1 correct matching with ITP
Road Name
Direction of City sheet
Name AG2 Area manager
Fiber Route A3

Road Edge AG3 Name And Date


A23
Road Center Line Mini AG3
LINK NAME…..MUMBAI-SURAT2 COSTAL SECTION N
50 0
45 RC - 20.58890 72.94543, 2.83MTR
EP - 20.58889 72.94543, 1.1 MTR
40 HOUSE CORNER - 20.58888 72.94535 11 MTR 0
35
RC - 20.58890 72.94543, 2.83MTR 0
30
30 EP - 20.58889 72.94543, 1.1 MTR 0
25
5.2
0 A HOUSE CORNER - 20.58888 72.94535 11 MTR 0
20 RC - 20.58897 72.94228, 3.3MTR RC - 20.58918 72.94216, 5.3MTR
205.2 2 EP - 20.58895 72.94226, 3.4 MTR COMPOUND WALL- 20.58920 72.94218, 1.68 MTR
0
10 0
10 HOUSE CORNER - 20.58893 72.94226 5 MTR EP - 20.58918 72.94220 4MTR
10 03 03 03 03 03 03 03 03 03 03 03 03 03
0-2 0-2 0-2 0-3 0-3 0-2 0-2 0-2 0-2
0
0 20 40 60 77 97 117 137 157 177 197 217 237 257 277 297 299 317 337 357 377 397 409 429 437 457 477 497 517
-10
-20
CH-0.020(CP) CH-0.077HH) CH-0.177 (CP) CH-0.299(CP) CH-0.409(HH) CH-0.437(HH)
-30 20.58842 20.58882 20.5889 20.58896
20.5889 20.58918
72.94557 72.94543 72.94449 72.94333 72.94227 72.94217
-40
-50

ROAD CHAINAGE 0 20 40 60 77 97 117 137 157 177 197 217 237 257
DUCT OFFSET 5 -2 2 -2 -3 3 45 30 12 3 3 10 3 10
DUCT DEPTH 1.20 1.20 1.40 1.50 1.65 1.40 1.50 1.40 1.50 1.65 1.50 1.40 1.20 1.30
NUMBER OF DUCTS 2 2 2 2 2 2 2 2 2 2 2 2 2 2
MM/HH/DUCT COUPLER ZMH CP CP CP
Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma
TYPE OF SOIL l l l l l l l l l l l l l l
CROSSING DETAILS
OWNERSHIP DETAIL Valsad R&B Valsad R&B Valsad R&B Valsad R&B
METHOLOGY (HDD/OT/MO HDD HDD HDD HDD
PROTECTION MEASURE
50
40
RC - 20.58956 72.94009, 3.2MTR
30 GATE- 20.58953 72.94010, 4.9MTR
COMPOUND WALL - 20.58953 72.94010, 5 MTR
20
10
-3 0 0 0 0 0 0 0
0-3 -3 -3 -3 -3 -3 -3 -3 -3 -4 -3 -3 -3 -3 -3 -3 -4 -3 -3 -3
-10629 649 657 677 697 717 737 757 777 797 815 835 855 875 895 915 935 941 961 981 1000 0 0 0 0 0 0 0
-20 CH-0.657 (HH) CH-0.941(CP)
20.5895 CH-0.815 (CP)
20.5909 20.59203
-30 72.9401 72.94038
72.94019
-40
-50

ROAD CHAINAGE 629 657 649


677 697 717 737 757 777 797 815 835 855 875
DUCT OFFSET -3 -3 -3
-3 -3 -3 -3 -3 5 -3 5 -3 -3 -3
DUCT DEPTH 2.00 2.00
1.65 1.20 1.30 1.40 2.40 2.50 1.60 1.60 1.65 1.60 3.20 2.90
NUMBER OF DUCTS 2 2 2
2 2 2 2 2 2 2 2 2 2 2
MM/HH/DUCT COUPLER HH CP
Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma
TYPE OF SOIL l l l l l l l l l l l l l l
CROSSING DETAILS
OWNERSHIP DETAIL Valsad R&B Valsad R&B Valsad R&B Valsad R&B
METHOLOGY (HDD/OT/MO HDD HDD HDD HDD
PROTECTION MEASURE

LEGEND
Date of Execution ITP Man Hole Installation By DWC
PIPE
Installation By DWC
Engineer Name PIPE Duct Couper
Phone No. Hand Hole Installation By GI
Area Manager Name PIPE DWC Couper
Phone No. Route Marker Installation By PBC
ITP. No/Page No. PIPE GI Couper
Link name (as per Engg.) Kiometre Stone Installation BY HDD
SECTION NAME…valsad-daman NLD_4B CHAINAGE 0 to 1

RC - 20.58918 72.94216, 5.3MTR


COMPOUND WALL- 20.58920 72.94218, 1.68 MTR
EP - 20.58918 72.94220 4MTR
03
0-3 0-2 0-2 0-2 0-2 0-3 0-3 0-3 0-3 0-3
429 437 457 477 497 517 537 557 569 589 609

CH-0.437(HH) CH-0.569 (CP)


20.58918 20.58938
72.94217 72.94092

277 297
299 317 337 357 377 397 409 429 437 457 477 497 517 537 557 569
25 33 3 35 3 3 3 3 3 -3 -2 -2 -2 -2 -3 -3 -3
1.60 1.50
1.65 1.20 1.30 1.40 1.50 1.50 1.60 1.60 1.65 1.50 2.00 2.10 2.20 1.50 1.60 1.65
2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
CP HH HH CP
Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma
l l l l l l l l l l l l l l l l l l

Valsad R&B Valsad R&B Valsad R&B Valsad R&B Valsad R&B Valsad R&B
HDD HDD HDD HDD HDD HDD

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

895 915 941 961 935


981 1000 0 0 0 0 0 0 0 0 0 0 0
-3 -3 -4 -3 -3
-3 -3 0 0 0 0 0 0 0 0 0 0 0
1.60 1.60 1.62
1.65 1.66 1.60 1.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2
CP
Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma Norma
l l l l l l l l l l l l l l l l l l

Valsad R&B Valsad R&B Valsad R&B


HDD HDD HDD HDD HDD HDD

LEGEND
HT Tower ILA Note- It has been checked
Culvert Traffic Signal and found that the data is
Pole
Culvert Traffic Signal and found that the data is
Pole Telecome Tower AG1 correct matching with ITP
Transformer Road Name
Direction of City sheet
Bridge
Telephone Name AG2 Area manager
Pole Fiber Route A3
Railway Track
Road Edge AG3 Name And Date
A23
Electric Pole Road Center Line Mini AG3
589 609
-3 -3
1.20 1.50
2 2

Norma Norma
l l

Valsad R&B
HDD

0 0
0 0
0.00 0.00

Norma Norma
l l

HDD

Note- It has been checked


and found that the data is
Area manager

Name And Date

You might also like