The belt conveyor transporting bagasse-ashes at PG
Gempolkrep is used to conveying bagasse-ashes from the boiler station to the bagasse warehouse. The belt conveyor simplifies and shortens work duration. However, PG Gempolkrep is an old sugar factory, the equipment is also aged and it makes the performance decreases. This book is about redesigning the belt and roller idler that purpoused to get the required motor power and calculations on the chain and sprocket. This redesigning is started with study of literature and field observation at PG Gempolkrep Mojokerto. After that, we get the data from observation and redesigning. Then we do the calculation and get the conclusion. The result is the belt conveyor requires 7.36 kW or 9.86 hp motor power. From the result, belt conveyor allowed to use electric motor with the power 10 hp. The belt length is 49,57 m and the chain numbered 100, the chain has a speed of 0.490 m/s with a length of 2131.98 mm is needed to make the belt conveyor move.