Professional Documents
Culture Documents
Illustration/Pictures of
1.1 Front View of your house (colored)
1.2 Top view/Floor plan (include your proposed plan for the remaining lot e.g.
garden, swimming pool, patio)
2. Materials used in building with expenses incurred
2.1 Solar panels: 340,000
2.2 Building materials: 3,676,150.69
2.3 Cost for construction
2.3.1 Construction workers labor: 1.1 M
2.3.2 Building permit: 6000
2.3.3 Realty tax:
2.3.4 Lot cost: 1 M
3. Furnishings
3.1 TV
Living Room (1) = 36,999
Bedrooms (4) – 4 x 12,498 = 49,992
3.5 Bed
Master’s Bedroom (1) = 27,950
Caretaker’s (1) = 14,995
Bedroom (3) – 3 x 12,950 = 38,850
3.7 Cabinet
Master’s Bedroom (1) = 10,995
Caretaker’s (1) = 2,899.75
Bedrooms (3) – 3 x 4,999 = 14,997
Total = 450,693.75
4. Computation of
4.1