PS 200 working conditions
Reliable measurements
No / no reliable measurements
{if you get any results the accuracy might vary
considerably from the values shown in the
operating manual)
following standar!
+ DIN 488 (EU)
+ metal conduit if sufficient spacing from
rebars
Base material = reinforced concrete “concrete with ferrous aggregates, ferrous
+ reinforced CMU additives, metal ber reinforcement
= (orick) + composite deck (depends on depth of concrete)
Detected objects | = rebars which comply with one of the | *corroded rebar
= pre- / posttensioned cables
= rebars with other standards than listed next
welded bars
+ non-ferrous materials
Environment /
‘working conditions
‘smooth & flat surfaces
= moist surfaces
= scanning on rough surfaces - use overlay
«interfering influences from external magnetic
fields or objects nearby
+ ratio of spacing : coverage > 2:1
Rebar layout + rebars lying orthogonal or within 25° of || +rebars lying parallel to scan direction
Direction right angle to scanning direction = tebars perpendicular to surface (distorted
+ reinforcement paralle! to surface image)
Rebar layout “minimum bar spacing of whichever is | depth and diameter are unreliable around
Spacing greater position of bar slices or double bars
+ 36mm or
Tansey Stee | Po Si Tang ebay 200