You are on page 1of 1

CERTIFICATE

OF CONFORMANCE

REF. NO.: 46/MIPL/DADRI/2019 DATE: 17.10.19

NAME & ADDRESS OF MAIN CONTRACTOR:


MELCO INDIA PVT. LTD. PLOT NO.‐4, SEC.‐27A, FARIDABAD‐121003

CONTRACT NAME & PROJECT:


DRY SORBENT INJECTION (DSI) SYSTEM PACKAGE NCTPP, DADRI STAGE‐I (4X210MW)

PO NO./NOA NO.: CS‐6120‐109C(R)‐2‐FC‐NOA‐6746 DT: 26.10.2018

MANUFACTURER NAME: M/S Melco India Pvt. Ltd., Faridabad

Sl. Description of Spec./Size Make NTPC Drg. No. Qty. Balance BBU Ref. ID Mark
No. Item/Equipment /Rating Offered Qty.
1. PRE‐FABRICATED STAIRCASE AS PER M GAD: 6120‐109C‐ 04 NOS. 00 Nos. 01.02.03 MIPL‐DAD‐JBSC
STRUCTURE FOR JUMBO BAG APP. GAD E PVC‐C‐004,REV‐ 1 TO 4
L 00,27.03.19
C
2. PRE‐FABRICATED SILO GAD: 6120‐109C‐ 04 SET 00 SET 04.01.10 MIPL‐DAD‐SILO‐
O
UNLOADING PLATFORMS & PVC‐C‐008,REV‐ UN‐PLF‐1 TO 16
CONNECTING PLATFORMS & 0,DT:28.05.19 &
PIPE SUPPORT STRUCTURE (1 MIPL‐DAD‐SILO‐
SET COMPRISES TO 16 MT PRE CON‐PLF‐1 TO 6
FABRICATED STRUCTURE)

It is hereby confirmed that above mentioned component/Item/Equipment was/were manufactured and tested in
accordance with drawing/ data sheets referred above and found acceptable.

Signature:

Name: G.K.SINGH

Designation: DGM Project

Note:
1. Wherever a deviation accepted by the contractor relevant details to be enclosed with the certificate of conformance.
2. For mandatory and recommended spares the contractor shall a 100% interchangeability certificate with original
equipment and furnish a certificate to this effect along with Certificate of Conformance.

You might also like