SCHEDULE OPEN CASE - PIPING [Publish Date]

Hari/ Tanggal Agenda EQUIPMENT


Senin – Jumat 1. Modernization consignment VIA
28 Oct – 1 Nov 2019 • 009-3/8 - PSV
• 009-5/8 - (Pipe-WLD)
Start : 03.00 pm – Finish • 009-6/8 - (Pipe-WLD)
• 034-2/2 - (Pipe-WLD)
• 082-1/1 - (Pipe-SMLS)
2. Modernization consignment VII
• 34 Packages Piping (Pipes & Fittings for Fermentation & Distillation Section)
3. Modernization consignment VIII
• 73-01 - (Pipe)
Open Case Piping • 73-02 - (Pipe)
4. Redistilation consignment IV
(see attachment) • 008-1/3 - PSV
• 008-3/3 - (Pipe-WLD)
• 083-3/3 (- Pipe-SMLS)
5. Redistilation consignment V
• 12 Packages Part of Piping Components Lot Material
6. Redistilation consignment XII
• 107-01/04 – Pipe Fab
• 107-02/04 – Pipe Fab
• 107 -03/04 – Flange SORF, Bird Mesh
• 107-04/04 – Spool Piece