You are on page 1of 2
‘SUBIC BAY CHECKLIST FOR THE APPLICATION OF BUILDING/RENOVATION PERMIT (- New APPLICATION (-REsusMission Date/Time of Application: Date/Time of Return : Applicant: Business Name ‘Address: Tel/Mobile & Fax No. Email Ad. BIR TIN No. Project: Contact Person MANDATORY REQUIREMENTS: CLEARANCES FROM OTHER SBMA DEPARTMENT, LOCATORS & AGENCY/IES: Requirements: ‘Submitted: Yes Remarks: No BUSINESS GROUP (B86) - (Bldg. 225, Dewey Ave., CBD, SBFZ) Valid copy of Certificate of Registration (CR) Certification that the proposed construction is based on business: activity and development commitment (Applicant to submit to business group copies of the Architectural drawing including perspective based on the approved contract). LAND & ASSET DEVELOPMENT DEPARTMENT (LADD) Located at Bidg. 332, Burgos St, CBD, SBFZ~ Tel, No. 252-4148 TAD Property Evaluation ECOLOGY CENTER (EC) located at GIF, Regulatory Bldg., Labitan St, SBFZ ~ Tel, No. 252-4416 Environmental Clearance for the proposed work/consiruction ‘SUBIC WATER & SEWERAGE COMPANY INC. (SWSCI) Former Sub-com Area, Rizal Highway, SBFZ — Tel. No. 252-2960/65 ‘SWSCI Clearance — (to issue clearance that the project will not affect their tities) - applicable only for projects with excavation works CIVIL AVIATION AUTHORITY OF THE PHILIPPINES (GAAP) BBidg. 8050, Argonaut Highway, SBFZ ~ Tel. No. 250-2176 = applicable only for new construction or renovation involving construction of additional floors. Height Clearance Permit (HCP) (height clearance requirements) Endorsement letter from various SBMA Industral Parks (e.g. 'SBDMC, Subic Techno-Park, SCDC, SCLIP, Global Terminals) or Main Lessee. ‘OTHER SBMA DEPARTMENTIS & UTILITIES PROVIDER AS MAY BE REQUIRE! 2 Subic Bay Metropolitan Authority BUILDING PERMIT AND SAFETY DEPARTMENT Regulatory Building, Rm. 206, Labitan Street, CBD Area, Subic Bay Freeport Zone, 2222 Philippines Telefax: +6347 252.4015/4574 « Tel: +6347 252.4723/4572 bpsd@sbma.com as wwwamysublebay.com.ph BUILDING PERMIT & SAFETY DEPARTMENT (BPSD) REQUIREMENTS: No. of | Submitted Requirements: icabiee ivestiane Remarks 7._| Letter of intent addressed to BPSD 1 2. _| Letter of authorization from the locator to transactin their behalf : {as applicable) 3,_| Copy of Occupancy Certificate of Main Sub-Lessee (ff subleased) d ‘4.__| All Building Permit Application Form/s (duly signed and sealed by the designing professional and the applicant) - (Forms to be provided by 5 BPSD) | '5, | AllBuilding Plans for submifal shall conform fo Standard Form Type feeeal ‘AO, A1, A2 and A3 of the National Building Code of the Philippines, Philippine Electronic Code, Philippine Electrical Code, Plumbing Code, Fire Code, Mechanical Code, and National Structural Code of the Philippines, duly signed and sealed by the their respective designing professional — (submit photocopy of the latest PRC ID & PTR of the Fespective Designing Professionals involved inthe project: 5 =A0,o~A1, 0-A2,0-A3 6._| Architectural Plan/s 3 7._| GwvivStructural Plan’s 3 I @._| Structural computation and analysis, z (required for structure with an area of 21 square meters and above); 8._| Electrical Plans 5 10,_| Sanitary Planis 5 11._| Plumbing Pran’s 5 12,_| Mechanical Planis 5 73._| Fire Protection Planis 5 2 For al ypes f occupanoy excep fr oneiiwo fay dwaling units '. One/Two Family dweling units provide single sation smoke detecior and portable fire extinguisher. & Hyerauic/ Flow computalon Tar Drainage’ Fie Protection, i 14,_| Electronic Planis 5 15. | Construction Specifications, 5 16._| Bil of Materials & scope of work 5 17, | Geo-Technical Investigation Report q {required for three (3) storey building structure and above): Es 78, | Construction Safety Policy and Guidelines of the Company and Risk Assessment signed by accredited DOLE Safety Officer — (copy of 1 ‘certification from DOLE) Note: All requirements identified under item nos. 4 to 16 shall be submit designing professionals. Result of Submission of Requirements: [= APPLICATION RECEIVED ae ‘duly signed and sealed by their respective TC] = APPLICATION RETURNED Assessed by: BPSD - SBMA Representative / Designation (Signature Over Printed Name) Date Time: NOTE: 1) For SBTCI Applicant, please include in the submis a) b) Commented electrical plan Certification of electrical load ‘Acknowledged & Accepted by: ‘Applicant - Representative (Signature Over Printed Name) Date /Time: ion of electrical plan the following: 2) APPLICANTS WITH INCOMPLETE REQUIREMENTS (MANDATORY/BPSD) WILL NOT BE ACCEPTED.

You might also like