You are on page 1of 30
eer ee 7a07 the alae, Rare 23.10.2018 Ln pee ee” SESS fra sf #8 eh ot a he Pl # fer Pfder arate fea ont orga sm : Hed —onget wa wales 1005 / AST / 2018; shure fate 16.10.18 antas Paraifea aefle wa at araater wel or me we | oe efife xa @ mare 8 araeh Reirreor gaet 2018 4 gfe ae S verrt S fed wale oma ere wd Prem 4 12-12 fereofiat @ cect tg a ar Be fist fee ‘art araet Paar amir et are ape Pe ory a orgafhy are Te | a saa @ Hae A we firm wer 2 fe a wae onl Haber ord ot ghee wat ge fem on wer 8 1 a Wee Oe ay Poe od IR vert at ont @ 1 een re OTe) soveai20%8 Zimbra Zimbia _- dgpmp@mppolice.gov.in. “apikagreee toate eee oh oh te See ese ak tae fad tet ae prnor& Fe ARR anette Pat Te A ea ar 1 Tot dgpmp@mppolice.gov.in, Bx RE , fata meres 6 :LOKESH KUMAR JATAV , DYCEO Jameel Khan Respected Sir/Madam, : Please Find attached document. Subject |:- gfe ae ct FRE gh rae Da er arate Pret ort St Hepat ara | Date :- 23/10/2018 Regards, Office of Chief Electoral Officer "Madhya Pradesh Nirvachan Sadan" 47, Arera Hills, Bhopal- 462011 Post Box- 1164 Ph-0755-2550488/8755-2555162 (fax) j E-mail- ceo_madhyapradesh@eci .gov.in 5 i Email- chiefelectoralofficermp@gmail.com { Wy (Complaint)- voterscomplaint@gmail.com Call Centre - Toll Free No. 1959. Phone- (0755) -2559612/14/15/16/17 (SVEEP Activities)-. sveepmp@gmail.com website mnw.ceomachyapradesh.nicin ceompiozs20i8 0051.pdf we Ee eR 22. ks : . Sage 1." ets i MADHYA PRADESH POLICE HOUSING & INFRASTRUCTURE CORPORATION LIMITED ‘BHADBADA ROAD, BHOPAL (M.P.) ‘TECHNICAL SANCTION CONSTRUCTION OF BARRAK AT NIWARI = AA feed 18.72 Lakh L _____ CIVIL WORK BUILDING UPTO PLINTH 387451.43 387451.43 WORK SUPER STRUCTURE 1056080.46 1056080.46 INTERNAL WATER SUPPLY & SEWERAGE 4727.65 4727.65 INTERNAL ELECTRIFICATION 149075.95 149075.95 PLINTH PROTECTION 7690.80 $7690.80. TOTAL (A) (1727526.29 ADD 12 % GST 207303 (ADD 1 % Contengencies: 17275.26 [ADD 3% Supervision Charges [51825.79 [TOTAL COST OF PROJECT gale? ASSISTANT ENGINEER ROJECT ENGINEER MPPH&IDC ‘MPPH&IDC DIVISION - SAGAR DIVISION - SAGAR, TECHNICAL SANCTION, Bobb dpe. fle] 18 NAME OF WORK - CONSTRUCTION OF OF BARRAK AT NIWART ‘DETAIL ESTIMATE UP TO PLINTH LEVEL. [SNO| TEM NO. ‘PARTICULARS No] L |B | pm] Ory, | UNIT| RATE | AMOUNT [Ear work in excavation By ‘mechanical means (Hyeraulic lexcevator )/ wanuel.means over ares (exceeding Hem in depth. 1.5m in width as well as 10 som on plan) inching dressing of sides. an 1 2.6 |ramming of bottom disposal of lexcavated earth, lead upto 50m and i lupo 1.5m, disposed earth to be levelled land neatly dressed. (No extra it is payable if work is done by mechanical sean), FR -116.10/Cum 2.61 Allkinds of soil FOOTING 7 18 | 150 | 150-100 | 4050 DUMMY 18120 | 1.201 1.00] 25.92 6642 | Cum | ties | 71136 29” [Excavation work by mechanical Imeans. (Hyrkaulie excavator) / ‘manuel means: in foundation Iwenches or drains not-exceeding 1.5 m in width or 10 sqm on plas including. dressing. of sides and arming of botioms lift upio 1.5 m, including geting out the excavated soil and. disposal of suphus excavated sols as directed, within a lead of 50m. 29.1 {Ordinary rock (FR - 194.4/CUM) FOOTING DUMMY 18 | 120 18 | 450_| 150 | 050 20.25 120 [00,1296 3321 | Cum | 1944 | 645602 Providing oad ping a pose saab : concrete of specified prade excluding 3 | 4 | the cost ofcentering and shutering - ll "work! upto pint level L ‘With 40mm nominal size graded sion| 42 ageregate aa.a.3 Nominal Mix -1 Cement : 4 sand 8 graded stone aggregate (M-7.5) [FOOTING a8 | ‘DUMMY 259 ‘405 |)" Gum | 31266 | 12662.73, Providing and frying in positon specified grade of reinforced cementeonertete (ith 20mm nominal 3 | Sid Sze graded stone ageregaie) excluding thecost of centering shuttering, ‘nishng and reinforcement ‘All work up to plinth level M4 20) [Nomi mix, FOOTING 1 | 120 | 420 | 030[ 7.78 1 | 1.00 | 140 [030 | 5.40 [SAME OF WORK CONSTRUCTION OF OF BARRAK AT NIWART DETAIL ESTIMATE UP TO PLINTH LEVEL. SNO| FTEMNO. ‘PARTICULARS Not |B. | pat| gry. | NET) RATE [AMOUNT [Pdewal 18 | 040 | G60 | 020] 086 18 | 040 | 060! 020 | 086 [CLOUNN UPTOPL BOTTOM [is | 0.20 | o40 150) 216 ; 18 | 020 | oo 150) 216 [PLINTH BRAM «| zoo [030 [odo | 336 3 | 2040"| 020 | 040 [400 2._| 1.50, [ 020" 040 [034 1 | S00 [020 | 0a | 040. 212 | Cam | 48019 | 1onee308 IReaforeneat for REC, work i inccing. sighting, cating! ‘ecing lading in postion and bing 4) s166 - ithuding cos of binding wie up to ‘oor tele! incuding al! wastage ee, completes 16. ‘Themo-Mechancaly Hretedban.(TST) Ros TNS OTE rsa | “Ke | 486 | ta9ves8 [BEAM QTY =11.13 @ 90 KG/CUM. iillng avalable excavated cart (excluding rock). in treaches lin sides of foundations etcin layers noi S| 224 jexceeding 20. em in Depth | [Consolidating cach deposited layer by] ‘aruming and watering lead upto 50m of fant inant sm 2 SP eh had ‘Net ay of filing = Total excavatcn | iE (aay of footing pes = footing re. 6642 | cam./ 48 | Go4ar __,sotuna wo to GL). he alec uy ~ (Taal excavation nel [oF ina) (Centering and” shuttering inclading lsutng, propping et, and removal of 5) SDE Pewuaions Tooling wis of ‘columns, etc, for mass concrete up to lint evel, Beef [FOOTING =) 030] 2592, eee Pete ~~ 030 2160 Pedestal =) 020} 720 fean| 7.20 (CLOUMNUPTOPLBOTIOM | ta 120 | -_ | 150| 3240 2s 20150 | 32.40. Ren 1566 | 1988435 (Centering aad shutering” incading ‘stung, propping et, and removal of) a}. og = /OR. for Walls (any ticked) °2 including atached pilasters buttress, 's plinth beams ae. sting courses | tap to plinth eve. PLINTH BEAM 12700 | =) 040 | 3360 © | 700 | 020 | - | 8.40 6 | 2040 | - | Omd) 48.96 3 | 2040 | 020 | - | 28 4 [4s | - [oao) 240 2_| 150 [020] - | 060 NAME OF WORK - CONSTRUCTION OF OF BARRAK AT NIWARI DETAIL ESTIMATE UP TO PLINTH LEVEL }SNO|TTEMNO. ‘PARTICULARS xo[ i |B [pm] ory. [UNI RATE | AMOUNT 2 | 500 | - | 040] 4.00 1 [00/020 [ =) 1.00 111.20 | Sqm | 2403) 26721.36 ‘Sopplying. and” ling. in plik” wil hard mua’ hard copra having MDD| not less than 2.0 eum under floors Inchding watering, ramming and| 8) ates omPacting (minim compaction [95% of MDD ) in kayers not exceeding ‘20. cm in thickness and . dressing! ‘complete, ( Note:- mximum thickness lof this layer to be provide shall be 30 fam, 1 | 2040 "7.00 | 030 | aoe ‘DEDUCT PB AND COLUMN. ame) 14m CUM | 7700 | "397440 Providing and laying in position cement 9 | aa.” eonerete of specified grade exchuding, Ihe cost of centering and shuttering ~ |All work upto pint level [With 40am minal size graded sone 412 ‘duag Nominal Mic -1 Cement °3 saad : 6 ‘graded stone sagregat(M 10) [iL No. 412.2, FR-3427.2/Cum (Flor 1 | 2040 | 7.00 [010 | 428 E - 150 | 030. | 030) O81 t (Sue 2 | 360 | 030 | 930) 065 | 1574 | Cam, S272 83997.27 0.00 38745143 SUB ENGINEER MPPHC SAGAR ASSISTANT ENGINEER MPPHC SAGAR NAME OF WORK - CONSTRUCTION OF BARRACK NIWART DETAIL ESTIMATE OF SUPER STRUCTURE GROUND FLOOR PARTICULARS NO. LB Da Qty UNIT | RATE AMOUNT Renfree cement consrete workin wale (aay thickness) including attached pilsters, buttresses, plinth and. string courses, filets, columns, pillars, posts and struts suspended floor, roof slab, beams, jete. up to floor two level excluding cast lmtering, shuteing, finishing and Ireinforesment 152.1 M 20 Nominal mix (with. 20mm Inomina ie grided stone agarepae) SORI-521 [Column C-0 020 |- 0.40 3.00 432 ‘CUM | 4681.80 2022538 [Reinforcement for REC. work including straightening, cutting, bending.placing in| position and binding including cost binding wire up to floor twolevel including all wastage ete. complete Themo-| Mechanically Treated bars(TMT) [SOR it.n0.3.166 FR-54 100 KG (CUM 82.00 ‘COM | 48,60 2099520 ‘Centering and shuitering including rating, ‘propping etcand removal of frm for \Columns, Pillars, Piers, Abutment, Posts lend Strut ‘SOR itno.5.9.6 (Column C-0 18 4.80 64.80 "som | 320.40 | 20761.92 ‘Brick work with fy ash lime bricks (FALG| Bricks) conforming to 1S:12894-2002, in ‘super structure above plinth level up to ‘Aloor Il level ia having 75 kg / en average compressive strength Cement morar 14 (I cement : 4 sand) ( ‘SOR It. No, 6.7.2.1) 2040 | 020 2.90 480 | 020 2.90 Parapet Wall 2.00 | 020 030 20.40 | 020 030 'DEDUCT DOGOR AND WINDOW 1.00 | 020 150 98s | 020, 180 | 0.20 120 1.20 TOTAL ‘CUM | 4758.30 122364.46 "Half brick masonry with fly ash lime! \Gypsum bricks (FALG bricks) conforming! to IS : 12894, in super structure abovel [plinth ane upto floor two level. having 75 kplem? average compressive strength (Cement mortar 1:3 (I cement 3 sand) (/ [SOR Tt. No. 6152.1) NAME OF WORK - CONSTRUCTION OF BARRACK NIWART DETAIL ESTIMATE OF SUPER STRUCTURE GROUND FLOOR NO PARTICULARS not |B | pm | Oy. | UNIT] RATE |_AMOUNT 4495 [= [290 [3742 1 fags [| 300" 1436 3) 150.) +f 290") ‘1305 [DEDUCT DOOOR AND WINDOW 20 fom DOOR 2/0807) =| 20 a 450 = [20 : : Sam 598.80 | 46955.00 Beta for pre : 2 Nos, mm dia MS. bars atovery thd 4 |ourse of half brick. masonry, (SOR I No. 618) TOTAL Tas” Sqm | 11430 900798 Providing and fixing chicken mesh as pee : - ; ISI specification ard in the regited width ‘wth 30mm long Bombay ails on vertical {9 [and horizontal junctions of ROC and tick ' ‘wall isicluding sceffolding and all lead and Ii ete. complete before plastering upt 10 Imeterheiht SOR 1327 : 1 | 3800 [= |=, 2800 | Sqw | 5580") 139500 Toit omen plaer of min t® (1 410 coment. 6 send) SOR” tno 13.1.2. FR110.00 HALL 2 20.40 = 7 we ; fas 2 i ‘DEBUCTDOOOR AND WRBOW t : = - 2 2.70 fe st) 1207 | 7 1060 |= 4 7 DOOR 2.10 - 210 | 441 oso [= | 210 | 252 I 3 100 |=. [ato | 105 24023 | SQM 99.00 | 2378228 TS mm coment plaster on rough side AL. single or half brick. wall of mix :1:6 (1 ‘cement: 6 sand) SOR itno.13.2.2 300.) 19240 = = [3.00 | 105.00 7 =| 300 | 13.50" =| 060 | 240 7 | 060 | 12.24 'DEDUCT DOOOR AND WINDOW 2 [29 |= [iso | sos [120 [= 120 | 07 1] 060 | ~~} 090 | 054 ‘DOOR a {210 | =| 210 | aa 2 [oso || 210 | 252 =| 100 [=f 2i0 | 10s | NAME OF WORK - CONSTRUCTION OF BARRACK NIWART DETAIL ESTIMATE OF SUPER STRUCTURE GROUND FLOOR PARTICULARS no | tL |B | pm | Qty | UNIT) RATE | AMOUNT 240.23 | SQM [115.20 | 27673.92 [Providing and laying vitrified floor tiles in different sizes with water absorption’ less {than 0.08% and conforming to 1S : 15622) lof approved make in all colours “and ‘shades, laid on 20mm thick cement mortar 1:4.(1 cement: 4 sand) including grouting! che joints with white cement and matching) [pigments etc, complete. [Size of Tile 600x60029-10 mm (SOR 11542 1x3 | 480 | 495 || 7128 xa_| 320 | 495 | - | 31.68 [PASSAGE 1x1_| 2040 | 2.00 | - | 40.80 ‘Skirting 1x1 | 10080| 0.10 | - | 10.08 153.84 | SQM [901.80 |” 152578.51 Providing and fixing [fmm tick gang sw cut mirror polished {premoulded and] Ipepolished) machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required) sizeof approved shae, colour and texture] laid over 20mm thick base coment moray 1:4 (1 cement 4 sand) with joints treated with white cemest, mixed with matching pigment , epoxy touch. ups, including irubbing, curing moulding and polishing to| ledge to ive high gloss finish wherever! required etc complete at all levels. samples, 'spproved by Enginnerin-Charge, ‘Granite i (Granite fine grained dark biack/ dark red // ‘white with self design! pattem crystal {other colours or gligers ‘SOR 11.222 I i ‘Wash Basin 1/320 | 00) - | 192 Urinal 1/130 | 0@ | - | 090 TOTAL 282 | SQM | 2120.40 | 597983, Providing edge moulding t 18mm thick marble stone counters, Vanities, window tc. including machine polishing to| ledge to give high gloss finish ete. complete (ite wae /SOR 11.362 ‘Wash Basin Tope in (psp 470 RM 2040 | 10877 NAME OF WORK - CONSTRUCTION OF BARRACK NIWART DETAIL ESTIMATE OF SUPER STRUCTURE GROUND FLOOR PARTICULARS: NO L B | pm | oy UNIT [Providing and laying Antiskid endura floor tiles of any. sizes, [2 mam thickness with] water absorptoa's tess. than 0.08% and) ‘conforming to 1S:15622 of approved make| in all colours and shades, laid. on 2Omun} ‘thick cement mortar 1:4 (I cement 4 sand)| including grouting the joints with white jcement with matching pigments. etc.) ‘complete. SOR 11.60, Male toilet + 1.50 16 |= 636 696 ‘SQM 3812.32 Providing and Fving Tar qualey cevani) ‘glazed wales eonfomning to IS : 15622 (Caving thickness 6 to Imm) of approved ‘make in all. Colours shies, such os Tourgundy, Bottle gree, Black of size 300e450mm or more in Skiing, risers steps and dados over 12 mm thick bed cement Morar 1:3 (I cement: 3 sand). and jointing with grey cement Surry @ 3.3kg) per scm including pointing in white cement mixed with pigment of matching shade complete. SOR 11.48 Female Toilet 1,50 =| 210" | 3520 116 =| 210 | 1949 DEDUCT DOOR 08 - [2 6.92 32.91 viding” and Hing” M.S. gis of required pattem infames of windows ee. vith MS, Dats, square oF round bars ee. Facuding priming coat wit aproved tel Fixed to openings vod ames wit ra plugs cows ee. 'SOR9.43.2 21.96 329.40 KG 7659 25228.15 NAME OF WORK - CONSTRUCTION OF BARRACK NIWART DETAIL ESTIMATE OF SUPER STRUCTURE GROUND FLOOR. ‘SNO PARTICULARS NO L B | DA Qty UNIT RATE Providing and xing presed ste! door [fumes confrming to 851 manufactured frm comnercil mild ste! shet including hinges, jamb, lock jamb, ‘bead and if required angle threshold of) ld steel ange of section 50x25mm, cr loose ties of 1,60 mm presed mild scl welded or rigidly. fixed together by! Imechanial mea, including M.S. presse) 18 uit hinges, 2.5mm thick with more ‘sur, lock skeplate and shock ‘absorbers a specified filing the frame ‘with Cement Concrete 1:36 a site before ifixing (cost of ‘concrete to be paid) separately) and applying a coat of {approved ste! primer after pre‘reament ‘of the surface as directed by Engineer-in-| ohare: Profle E of 1 60mm thick double rebate of ‘size 11Smmx50mm [Fixing with adjustable lugs with split end) tail to each jamb. ‘SOR 10.13.3.1 320 3120" | RM nas 15255.16 ‘Profle C of 1.60mi thick single rebate of 19 | size 100mmsSOmum |Fixing with adjustable lags with split end, tail t0 each jam. ‘SOR 10.13.21, FR-388.3.40/Meter 5.00, 15.00, 15.00 5824.50, ‘Providing and fixing IST marked flush door shutters conforming 10 IS: 2202 (Part D) decorative type, core of block board! sd onatruction with fanie of Ist 29 [wood and well matched teak 3 ply ‘vengering with vertical grains or cross [bands and face veneers on both faces ‘Shutters of such as duro board, centuty. ‘35 mm thick including SY marked) A. Siainless Stee! butt hinges with necessary SORS.181 D =| 20 1470 30mm thick iniuding’ 181 marked B [Stainless Steel butt hinges _with| necessary stems. 14.70, | SQM 3aa2.10 5118687 - (SOR 9.18.2 [DL 0.30) =| 210 3294.00 16601.76 Providing and fixing IST marked stainless ‘steel handles with necessary screws et, \complete = 19.69.1125 mm. a i 200 22.00 NAME OF WORK - CONSTRUCTION OF BARRACK NIWARI DETAIL ESTIMATE OF SUPER STRUCTURE GROUND FLOOR SNO PARTICULARS no] t |B Dit Qty ‘UNIT | RATE ‘AMOUNT 22.00 BACH] $4.00 1188.00, n Providing and fixing IST marked stainless late! tower holt black finish, (Barrel typo] with necessary serews | 39 | 04 | 0.2 | 480°/CUM| 11641 | 887 including getting out the excavated soil land disposal of surplus excavated soil as Idiected, within a lead of 50 m2.6.1 All kinds of soil, | SOR P- 1 1-261 FR-129.00 ‘4.1 Providing and laying in position) (cement concrete of specified" grade| lexcluding the cost of centering and) ‘shuttering - All worki upto plinth level. 4.1.2.3 M75 ‘SOR P-4/1-4.1.2.3 FR-3474.00 | (Bottom 2 | 30 | 04 | ot [Providing and laying in position specified | lgrade of reinforced cement concrete (with | 20mm nominalsize graded stone | lagaregatc) excluding the cost of centering, 3. |suttering, finishing andreinforeement | | |All work up to plinth IevelSOR it.no,5.2.1 | WALL 1) | us | Uo | 3.60 | 3.60 |CUM| 4581.9 | 1649484 ‘Centering and shuticring including) 4 strutting, propping ete. and removal o {form for ‘5.9.2 Walls (any thickness) including! latached pilasters butteresses, plinth beams ISOR it.no.5.9.2 fee 30 | 06 | - [3600] [ | i 36.00 |SQM, 240.3 | 8650.8 2.27 Supplying and filling in plinth with hard muralhard copra under floors} 5 |including watering ramming consolidating} and dressing complete. SOR LN. - 2.27 { 1 | 30 [| 12 | 03 | 1080 10.80 [CUM] 2700 | 2916 NAME OF WORK - CONSTRUCTION OF BARRACK NIWART DETAIL ESTIMATE OF PLINTH PROTECTION SN Particular Item. ‘No. |Length| Width| H/D | Qty |UNIT| Rate | Amount Providing and laying in position cement } concrete of specified grade excluding the 6 [cost of centering and shuttering - All work | {up to plinth evel With 20mm nominal. size graded stonc| 8.40 [CUM 4023.9. | 3380.76 Reinforcement for RCC. work including straightening, cutting, bending, placing in [position andbinding including cost of, | 8 binding wire up to floor two' level including all wastage etc. complete SOR it.no,5.16.6 ref = ~__|324.00/ KG | 48.6 | 157464 73.1 [2mm cement plaster of mix. 9 13.1.2 1:6 (1 cement: 4 sand) 1 | 30 | ~ | 07 | 21.00 sem) 99.0 2079 SOREN. - 13.1.2 FR-110 TOTAL AMOUNT 976908 0? SUB ENGINEER ASSITANT ENGINEER ‘PROJECT ENGINEER MPPHC SAGAR, MPPHC SAGAR MPPHC SAGAR

You might also like