You are on page 1of 37

NO URAIAN PEKERJAAN JUMLAH HARAGA (RP)

I PEKERJAAN ELEKTRIKAL Rp.


II PEKERJAAN TATA SUARA Rp.
III PEKERJAAN FIRE ARARM Rp.
IV PEKERJAAN CCTV Rp.
V PEKERJAAN MATV Rp.
VI PEKERJAAN NURSE CALL Rp.
VII PEKERJAAN KABEL DATA Rp.
VIII PEKERJAAN TELEPON Rp.
IX PEKERJAAN PLUMBING Rp.
X PEKERJAAN HYDRANT Rp.
XI PEKERJAAN AC Rp.
XII PEKERJAAN LIFT Rp.
XIII PEKERJAAN GAS MEDIS Rp.
XIV PEKERJAAN PERLENGKAPAN SANITAIR Rp.
JUMLAH Rp.
DIBULATKAN Rp.
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

I PEKERJAAN ELEKTRIKAL
1.1 Pekerjaan Fixtures Penerangan dan Daya
1.1.1 Lantai 1
1 TL T5 2 x 28W RM Alumunium Grille buah 26
2 TL T5 2 x 28W TKO buah 19
3 TL T5 1 x 28W TKO buah 2
4 TL T5 1 x 14W TKO buah 5
5 Down Light LED 7 Watt, Recessed Mounted buah 48
5 Down Light LED 7 Watt, Surface Mounted buah 6
6 LED 7 Watt E 27 Fitting Plafond buah 11
7 Lampu EXIT TL10W C/W Baterai Back Up buah 2
8 Titik Instalasi Penerangan titik 119
9 Saklar Tunggal bh 32
10 Saklar Ganda bh 27
11 Stop kontak 1fasa, 200W buah 60
12 Titik Instalasi Stop Kontak titik 60
13 Lampu Emergensi 2xFL 6Watt buah 12

1.1.2 Lantai 2
1 TL T5 2 x 28W RM Alumunium Grille buah 12
2 TL T5 2 x 28W RM Cover Acrylic buah 110
3 TL T5 1 x 14W TKO buah 2
4 Down Light LED 7 Watt buah 40
5 LED 7 Watt E 27 Fitting Plafond buah 10
6 Titik Instalasi Penerangan titik 174
7 Saklar Tunggal bh 40
8 Saklar Ganda bh 56
9 Stop kontak 1fasa, 200W buah 140
10 Titik Instalasi Stop Kontak titik 140
11 Lampu Emergensi 2xFL 6Watt buah 16

1.1.3 Lantai 3
1 TL T5 2 x 28W RM Alumunium Grille buah 18
2 TL T5 2 x 28W RM Cover Acrylic buah 48
3 TL T5 1 x 28W TKO buah 2
4 TL T5 1 x 14W TKO buah 2
5 TL T5 1 x 14W Balk, Pada Bed Head Unit buah 22
6 Down Light LED 7 Watt buah 50
7 LED 7 Watt E 27 Fitting Plafond buah 25
9 Titik Instalasi Penerangan titik 167
10 Saklar Tunggal bh 38
11 Saklar Ganda bh 44
12 Stop kontak 1fasa, 200W buah 130
13 Titik Instalasi Stop Kontak titik 130
14 Lampu Emergensi 2xFL 6Watt buah 9

1.1.4 Lantai 4
1 TL T5 2 x 28W RM Alumunium Grille buah 10
2 TL T5 2 x 28W RM Cover Acrylic buah 50
3 TL T5 1 x 28W TKO buah 2
4 TL T5 1 x 14W TKO buah 2
5 TL T5 1 x 14W Balk, Pada Bed Head Unit buah 28
6 Down Light LED 7 Watt buah 50
7 LED 7 Watt E 27 Fitting Plafond buah 22
9 Titik Instalasi Penerangan titik 164
10 Saklar Tunggal bh 39
11 Saklar Ganda bh 45
12 Stop kontak 1fasa, 200W buah 130
13 Titik Instalasi Stop Kontak titik 130
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
14 Lampu Emergensi 2xFL 6Watt buah 11

1.1.5 Lantai 5
1 TL T5 2 x 28W RM Alumunium Grille buah 10
2 TL T5 2 x 28W RM Cover Acrylic buah 50
3 TL T5 1 x 28W TKO buah 2
4 TL T5 1 x 14W TKO buah 2
5 TL T5 1 x 14W Balk, Pada Bed Head Unit buah 50
6 Down Light LED 7 Watt buah 59
7 LED 7 Watt E 27 Fitting Plafond buah 22
9 Titik Instalasi Penerangan titik 195
10 Saklar Tunggal bh 39
11 Saklar Ganda bh 45
12 Stop kontak 1fasa, 200W buah 130
13 Titik Instalasi Stop Kontak titik 130
14 Lampu Emergensi 2xFL 6Watt buah 11

1.1.5 Lantai 6
1 TL T5 2 x 28W RM Alumunium Grille buah 10
2 TL T5 2 x 28W RM Cover Acrylic buah 50
3 TL T5 1 x 28W TKO buah 2
4 TL T5 1 x 14W TKO buah 2
5 TL T5 1 x 14W Balk, Pada Bed Head Unit buah 28
6 Down Light LED 7 Watt buah 50
7 LED 7 Watt E 27 Fitting Plafond buah 22
9 Titik Instalasi Penerangan titik 164
10 Saklar Tunggal bh 39
11 Saklar Ganda bh 45
12 Stop kontak 1fasa, 200W buah 136
13 Titik Instalasi Stop Kontak titik 136
14 Lampu Emergensi 2xFL 6Watt buah 11

1.1.6 Lantai Atap


1 TL T5 1 x 14W TKO buah 4
2 Stop kontak 1fasa,16A, 200W buah 2
3 Titik Instalasi Penerangan titik 4
4 Titik Instalasi Stop Kontak titik 2
5 Saklar Ganda bh 1
JUMLAH

1.2. Pekerjaan Pengabelan


1.2.1 Lantai 1
1 Dari Panel LVMDP ke MDP Gedung , 2x(NYFGbY 4 X 300 m m' 336
2 Dari MDP - 1 ke LP -1, NYY 4 x 4 mm2 m' 4
3 Dari MDP - 1 ke PP -1, NYY 4 x 6 mm2 m' 4
4 Dari MDP - 1 ke PP -AC 1, NYY 4 x 4 mm2 m' 4
5 Dari SDP - 1 ke PP -UPS.1, NYY 4 x 6 mm2 m' 4

1.2.2 Lantai 2
1 Dari MDP ke SDP - 2, NYY 4 x 35 mm2 m' 8
2 Dari SDP - 2 ke LP -2, NYY 4 x 6 mm2 m' 4
3 Dari SDP - 2 ke PP -2, NYY 4 x 16 mm2 m' 4
4 Dari SDP - 2 ke PP -AC 2, NYY 4 x 4 mm2 m' 4
5 Dari SDP - 2 ke PP -UPS, NYY 4 x 6 mm2 m' 4

1.2.3 Lantai 3
1 Dari MDP ke SDP - 3, NYY 4 x 35 mm2 m' 12
2 Dari SDP - 3 ke LP -3, NYY 4 x 6 mm2 m' 4
3 Dari SDP - 3 ke PP -3, NYY 4 x 16 mm2 m' 4
4 Dari SDP - 3 ke PP -AC 3, NYY 4 x 4 mm2 m' 4
5 Dari SDP - 3 ke PP -UPS, NYY 4 x 6 mm2 m' 4
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
1.2.4 Lantai 4
1 Dari MDP ke SDP - 4, NYY 4 x 35 mm2 m' 16
2 Dari SDP - 4 ke LP -4, NYY 4 x 4 mm2 m' 4
3 Dari SDP - 4 ke PP -4, NYY 4 x 16 mm2 m' 4
4 Dari SDP - 4 ke PP -AC 4, NYY 4 x 4 mm2 m' 4
5 Dari SDP - 4 ke PP -UPS.4, NYY 4 x 4 mm2 m' 4

1.2.5 Lantai 5
1 Dari MDP ke SDP - 5, NYY 4 x 50 mm2 m' 20
2 Dari SDP - 5 ke LP -5, NYY 4 x 4 mm2 m' 4
3 Dari SDP - 5 ke PP -5, NYY 4 x 16 mm2 m' 4
4 Dari SDP - 5 ke PP -AC 5, NYY 4 x 4 mm2 m' 4
5 Dari SDP - 4 ke PP -UPS.4, NYY 4 x 4 mm2 m' 4
6 Dari SDP - 5 ke PP -OK, NYY 4 x 16 mm2 m' 102
1.2.6 Lantai 6
1 Dari MDP ke SDP - 5, NYY 4 x 50 mm2 m' 24
2 Dari SDP - 5 ke LP -5, NYY 4 x 4 mm2 m' 4
3 Dari SDP - 5 ke PP -5, NYY 4 x 16 mm2 m' 4
4 Dari SDP - 5 ke PP -AC 5, NYY 4 x 4 mm2 m' 4
5 Dari SDP - 4 ke PP -UPS.4, NYY 4 x 4 mm2 m' 4
6 Dari SDP - 4 ke PP -WH&BP, NYY 4 x 16 mm2 m' 110

1.2.6 Lantai Atap dan R.Lift


1 Dari MDP ke Panel Lift , FRC 4 x 25 mm2 m' 56
2 Dari MDP ke Panel PP-Outdoor AC , NYY 4 x 150 mm2 m' 80
Jumlah
1.3. Pekerjaan Perpanelan
Pekerjaan Panel Lengkap komponen,
dudukan, grounding & Accessories lain
1.3.1 Lantai 1
1 MDP unit 1
2 LP- 1 unit 1
3 PP - 1 unit 1
4 PP - AC 1 unit 1
5 PP - UPS.1 unit 1
6 Unit UPS,3 fasa Kapasitas 5 Kva Single back up 15 menit,ICA unit 1
7 Grounding panel MDP unit 1
8 Grounding panel OK unit 3

1.3.2 Lantai.2
1 SDP -2 unit 1
2 LP- 2 unit 1
3 PP - 2 unit 1
4 PP - AC 2 unit 1
5 PP - UPS 2 unit 1
6 Unit UPS,3 fasa Kapasitas 10 Kva Single back up 15 menit,ICA unit 1

1.3.3 Lantai.3
1 SDP -3 unit 1
2 LP- 3 unit 1
3 PP - 3 unit 1
4 PP - AC 3 unit 1
5 PP - UPS 3 unit 1
6 Unit UPS,3 fasa Kapasitas 10 Kva Single back up 15 menit,ICA unit 1

1.3.4 Lantai.4
1 SDP-4 unit 1
2 LP- 4 unit 1
3 PP - 4 unit 1
4 PP - AC 4 unit 1
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
5 PP - UPS 4 unit 1
6 Unit UPS,3 fasa Kapasitas 10 Kva Single back up 15 menit,ICA unit 1

1.3.5 Lantai.5
1 SDP -5 unit 1
2 LP- 5 unit 1
3 PP - 5 unit 1
4 PP - AC 5 unit 1
5 PP - UPS 5 unit 1
6 Panel Monitoring Isolasi R.Operasi unit 3
8 Unit UPS,3 fasa Kapasitas 15 Kva Single back up 15 menit,ICA unit 4

1.3.6 Lantai.6 dan Atap


1 SDP -5 unit 1
2 LP- 5 unit 1
3 PP - 5 unit 1
4 PP - UPS 5 unit 1
5 PP - Lift unit 1
6 PP - WH & BP unit 2
Jumlah

1.4 Pekerjaan Rak Kabel


1.4.1 Lantai 1
Ukuran 40 cm x 10 cm m 48
Ukuran 30 cm x 10 cm m 48
Material Bantu ls 1

1.4.2 Lantai 2
Ukuran 40 cm x 10 cm m 81
Ukuran 30 cm x 10 cm m 81
Material Bantu ls 1

1.4.3 Lantai 3
Ukuran 40 cm x 10 cm m 81
Ukuran 30 cm x 10 cm m 81
Material Bantu ls 1

1.4.4 Lantai 4
Ukuran 40 cm x 10 cm m 81
Ukuran 30 cm x 10 cm m 81
Material Bantu m 1

1.4.5 Lantai 5
Ukuran 40 cm x 10 cm m 81
Ukuran 30 cm x 10 cm m 81
Material Bantu m 1

1.4.5 Lantai 6
Ukuran 40 cm x 10 cm m 63
Ukuran 30 cm x 10 cm m 63
Material Bantu m 1
Jumlah

1.5 Instalasi Penangkap Petir & Grounding Sistem


- Air terminal ( R=100 cm ) lengkap tiang Bh 1
- Coaxial cable 2x35mm2 Mt 35
- Klem coaxial cable 2 x 35mm2 Ls 1
Grounding System (penangkap petir dan panel) unit 9
- Copper rod tembaga
- Pentanahan + pipa Gip 1 1/2"
- Bak kontrol (40x40x30) cm lengkap dengan tutup
- Kawat BC dia. 70mm2, 35mm2
Jumlah
Jumlah Total
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

II Pekerjaan Tata Suara


2.1 Sentral tata Suara
1 Sentral Public Address :
a. AM/FM Tuner bh 1
b. CD/DVD/MP3 bh 1
c. Mixer Pre Amplifier bh 1
d. Equalizer bh 1
e. 240 Power Amplifier bh 2
f. Zone Selector bh 1
g. Cabinet Rack w/ Acc. bh 1
h. Paging Microphone bh 7
2 Wiring & Testing Commisioning ls 1

2.2 Lantai 1
a. Panel MDF unit 1
b. Kabel Utama ke TB m' 200
c. Ceiling Speaker 6 watt (RM) buah 5
d. Ceiling Speaker 6 watt (SM) buah 14
e. Instalasi Titik Speaker titik 19

2.3 Lantai 2
a. Terminal Box Tata Suara unit 1
b. Ceiling Speaker 6 watt (RM) buah 11
c. Volume Control buah 5
d. Instalasi Titik Speaker titik 16

2.4 Lantai 3
a. Terminal Box Tata Suara unit 1
b. Ceiling Speaker 6 watt (RM) buah 10
c. Volume Control buah 3
d. Instalasi Titik Speaker titik 13

2.5 Lantai 4
a. Terminal Box Tata Suara unit 1
b. Ceiling Speaker 6 watt (RM) buah 13
c. Volume Control buah 3
d. Instalasi Titik Speaker titik 16

2.6 Lantai 5
a. Terminal Box Tata Suara unit 1
b. Ceiling Speaker 6 watt (RM) buah 13
c. Instalasi Titik Speaker titik 13

2.7 Lantai 6
a. Terminal Box Tata Suara unit 1
b. Ceiling Speaker 6 watt (RM) buah 13
c. Volume Control buah 4
d. Instalasi Titik Speaker titik 17
Jumlah Total
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

III Pekerjaan Fire Alarm


3.1 Lantai Dasar
Sentral Fire Alarm
a. FACP 15 Zone lengkap Battery,MDF,Alat-alat control dan Groun Unit 1
b. MDF Unit 1
c. Testing & Commisioning ls 1

3.2 Lantai 1
a. ROR temperature detector buah 11
b. Ionization smoke detector buah 19
c. Manual Break Glass buah 2
d. Alarm Bell buah 2
e. Indicator Lamp buah 2
f. Terminal Box Fire Alarm buah 1
g. Instalasi Titik Detector titik 34
h. Kabel Utama ke TB NYA 3x(2x2,5mm2) m' 540

3.3 Lantai 2
a. ROR temperature detector buah 8
b. Ionization smoke detector buah 36
c. Fixed temperature detector buah 1
d. Manual Break Glass buah 2
e. Alarm Bell buah 2
f. Indicator Lamp buah 2
g. Terminal Box Fire Alarm buah 1
h. Instalasi Titik Detector titik 51

3.4 Lantai 3
a. ROR temperature detector buah 8
b. Ionization smoke detector buah 37
c. Fixed temperature detector buah 1
d. Manual Break Glass buah 2
e. Alarm Bell buah 2
f. Indicator Lamp buah 2
g. Terminal Box Fire Alarm buah 1
h. Instalasi Titik Detector titik 52

3.5 Lantai 4
a. ROR temperature detector buah 8
b. Ionization smoke detector buah 37
c. Fixed temperature detector buah 1
d. Manual Break Glass buah 2
e. Alarm Bell buah 2
f. Indicator Lamp buah 2
g. Terminal Box Fire Alarm buah 1
h. Instalasi Titik Detector titik 52
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
3.5 Lantai 5
a. ROR temperature detector buah 6
b. Ionization smoke detector buah 34
c. Fixed temperature detector buah 1
d. Manual Break Glass buah 2
e. Alarm Bell buah 2
f. Indicator Lamp buah 2
g. Terminal Box Fire Alarm buah 1
h. Instalasi Titik Detector titik 47

3.6 Lantai 6 dan Atap


a. ROR temperature detector buah 6
b. Ionization smoke detector buah 34
c. Fixed temperature detector buah 1
d. Manual Break Glass buah 2
e. Alarm Bell buah 2
f. Indicator Lamp buah 2
g. Terminal Box Fire Alarm buah 1
h. Instalasi Titik Detector titik 47

Jumlah Total
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

IV. Pekerjaan CCTV


4.1 PERALATAN UTAMA CCTV DAN INSTALASI, DLL
a. 16 Channel Digital Video Recording (DVR) Samsung 2 Unit
b. TV LED 32" , Monitor, Samsung 2 Unit

4.2 PEKERJAAN INSTALASI DAN FIXTURES, DLL


Lantai 1
a. Type Dome Camera ,600 TVL 5 Unit
b. Instalasi Lengkap material (kabel, conduit, bracket, dll) 5 Titik

Lantai 2
a. Type Dome Camera ,600 TVL 4 Unit
b. Instalasi Lengkap material (kabel, conduit, bracket, dll) 4 Titik

Lantai 3
a. Type Dome Camera ,600 TVL 4 Unit
b. Instalasi Lengkap material (kabel, conduit, bracket, dll) 4 Titik

Lantai 4
a. Type Dome Camera ,600 TVL 4 Unit
b. Instalasi Lengkap material (kabel, conduit, bracket, dll) 4 Titik

Lantai 5
a. Type Dome Camera ,600 TVL 4 Unit
b. Instalasi Lengkap material (kabel, conduit, bracket, dll) 4 Titik

Lantai 6
a. Type Dome Camera ,600 TVL 4 Unit
b. Instalasi Lengkap material (kabel, conduit, bracket, dll) 4 Titik

Jumlah Total
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

V. Pekerjaan MATV
5.1 Lantai 1
a. Outlet Antena TV buah 2
b. Coupler / Spliter buah 1
c. Instalasi Titik Outlet TV titik 2
d. Testing & Commisioning ls 1

5.2 Lantai 2
a. Outlet Antena TV buah 3
b. Coupler / Spliter buah 2
c. Instalasi Titik Outlet TV titik 3

5.3 Lantai 3
a. Outlet Antena TV buah 12
b. Coupler / Spliter buah 4
c. Instalasi Titik Outlet TV titik 12

5.4 Lantai 4
a. Outlet Antena TV buah 21
b. Coupler / Spliter buah 5
c. Instalasi Titik Outlet TV titik 21

5.5 Lantai 5
a. Outlet Antena TV buah 21
b. Coupler / Spliter buah 5
c. Instalasi Titik Outlet TV titik 21

5.5 Lantai 6
a. Outlet Antena TV buah 21
b. Coupler / Spliter buah 5
c. Instalasi Titik Outlet TV titik 21

5.6 Lantai Atap


a. Parabola 6 feet unit 15
b. Coupler / Spliter buah 4
c. Kabel Coaxial RG 6 dari tiap Lantai m' 200
Jumlah Total
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

VI. Pekerjaan Instalasi Nurse Call


6.1 Lantai 1
a. Analog Master unit kapasitas 18 Call, Commax unit 1
b. Bed Head Console Unit JNS-2000C buah 18
c. Bed Side Call Button buah 18
d. Corridor call light 2 Warna buah 3
e. Emergency Switch Toilet (Pull Down Rope Type) buah 2
f. Titik instalasi nurse call titik 18
g. Testing dan commisioning ls 1

6.2 Lantai 2
a. Analog Master unit kapasitas 12 Call, Commax unit 2
b. Analog Master unit kapasitas 24 Call, Commax unit 2
c. Bed Head Console Unit JNS-2000C buah 45
d. Bed Side Call Button buah 45
e. Corridor call light 2 Warna buah 3
f. Emergency Switch Toilet (Pull Down Rope Type) buah 3
g. Titik instalasi nurse call titik 51

6.3 Lantai 3
a. Analog Master unit kapasitas 12 Call, Commax unit 1
b. Analog Master unit kapasitas 24 Call, Commax unit 2
c. Bed Head Console Unit JNS-2000C buah 54
d. Bed Side Call Button buah 54
e. Corridor call light 2 Warna buah 9
f. Emergency Switch Toilet (Pull Down Rope Type) buah 9
g. Titik instalasi nurse call titik 72

6.4 Lantai 4
a. Analog Master unit kapasitas 12 Call, Commax unit 2
b. Analog Master unit kapasitas 24 Call, Commax unit 2
c. Bed Head Console Unit JNS-2000C buah 35
d. Bed Side Call Button buah 35
e. Corridor call light 2 Warna buah 18
f. Emergency Switch Toilet (Pull Down Rope Type) buah 18
g. Titik instalasi nurse call titik 71

6.5 Lantai 5
a. Analog Master unit kapasitas 12 Call, Commax unit 2
b. Analog Master unit kapasitas 24 Call, Commax unit 2
c. Bed Head Console Unit JNS-2000C buah 35
d. Bed Side Call Button buah 35
e. Corridor call light 2 Warna buah 18
f. Emergency Switch Toilet (Pull Down Rope Type) buah 18
g. Titik instalasi nurse call titik 71

6.6 Lantai 6
a. Analog Master unit kapasitas 12 Call, Commax unit 2
b. Analog Master unit kapasitas 24 Call, Commax unit 2
c. Bed Head Console Unit JNS-2000C buah 33
d. Bed Side Call Button buah 33
e. Corridor call light 2 Warna buah 15
f. Emergency Switch Toilet (Pull Down Rope Type) buah 15
g. Titik instalasi nurse call titik 63

Jumlah Total
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

VII. Pekerjaan Instalasi Data


7.1 Sentral Data
a. Server + Komputer + Software unit 1 by owner

7.2 Lantai 1
a. Outlet data buah 7
b Instalasi Titik Outlet data UTP Cat.6 (0.6mm2) ttk 7
c. Switch 8 Port , HP Unit 1
d. Kabel ke Switch , UTP Cat.6 ( 0,6 mm2 ) m' 200
e. Testing & Commisioning ls 1
f. Box switch 8 U Unit 1
7.3 Lantai 2
a. Outlet data buah 10
b Instalasi Titik Outlet data UTP Cat.6 (0.6mm2) ttk 10
c. Switch 16 Port , HP Unit 1
d. Box switch 8 U Unit 1
7.4 Lantai 3
a. Outlet data buah 10
b Instalasi Titik Outlet data UTP Cat.6 (0.6mm2) ttk 10
c. Switch 16 Port , HP Unit 1
d. Box switch 8 U Unit 1
7.5 Lantai 4
a. Outlet data buah 7
b Instalasi Titik Outlet data UTP Cat.6 (0.6mm2) ttk 7
c. Switch 8 Port , HP Unit 1
d. Box switch 8 U Unit 1
7.6 Lantai 5
a. Outlet data buah 6
b Instalasi Titik Outlet data UTP Cat.6 (0.6mm2) ttk 6
c. Switch 8 Port , HP Unit 1
d. Box switch 8 U Unit 1
7.6 Lantai 6
a. Outlet data buah 6
b Instalasi Titik Outlet data UTP Cat.6 (0.6mm2) ttk 6
c. Switch 8 Port , HP Unit 1
d. Box switch 8 U Unit 1

Jumlah Total
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

VIII. Pekerjaan Instalasi Telepon


8.1 Sentrai Telephone
1 PABX kapasitas 64Extention,Panasonic unit 1
2 MDF unit 1
3 Testing & Commisioning ls 1
4 Biaya Penyambungan Telephone line 4

8.2 Lantai 1
a. Pesawat Telepon Single Line bh 6
b. Titik Instalasi Telepon titik 6
c. Outlet Telepon bh 3
d. Terminal Box Telepon bh 1
e. Kabel ITC 20 pair MDF ke TB m' 200

8.3 Lantai 2
a. Pesawat Telepon Single Line bh 8
b. Titik Instalasi Telepon titik 8
c. Outlet Telepon bh 8
d. Terminal Box Telepon bh 1

8.4 Lantai 3
a. Pesawat Telepon Single Line bh 6
b. Titik Instalasi Telepon titik 6
c. Outlet Telepon bh 6
d. Terminal Box Telepon bh 1

8.5 Lantai 4
a. Pesawat Telepon Single Line bh 4
b. Titik Instalasi Telepon titik 4
c. Outlet Telepon bh 4
d. Terminal Box Telepon bh 1

8.6 Lantai 5
a. Pesawat Telepon Single Line bh 3
b. Titik Instalasi Telepon titik 3
c. Outlet Telepon bh 3
d. Terminal Box Telepon bh 1

8.6 Lantai 6
a. Pesawat Telepon Single Line bh 3
b. Titik Instalasi Telepon titik 3
c. Outlet Telepon bh 3
d. Terminal Box Telepon bh 1

Jumlah Total
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

IX. PEKERJAAN MEKANIKAL


9.1 Pekerjaan Plumbing Air Bersih & Air Panas
9.1.1 Peralatan Utama di Ruang Pompa
a. Pompa Air Bersih Lengkap Panel Kontrol dan peralatan bantu
Jenis Pompa Centrifugal End Suction.
- Putaran : 1500 RPM
- PAB.1, Kapasitas : 220 LPM, Head : 35 Meter unit 2
Package Booster Pump unit 2
- Dosing Pump & Clorination Tank unit 1
b. Gate valve :
- Diameter 80 mm bh 8
- Diameter 65 mm bh 6
c. Flexible Joint :
- Diameter 80 mm bh 2
- Diameter 65 mm bh 2
d. Check valve :
- Diameter 65 mm bh 2
e. Pompa Kuras unit 1
Kapasitas : 200 lpm
Total head : 20 m
Penggerak : Elektrik motor
D a y a : 2,2 KW
Putaran : 1500 rpm
Karakt. Listrik : 380V / 3ph / 50 Hz
f. Floating valve diameter 50 mm bh 2
g. Butterfly valve
- Diameter 300 mm bh 1
h. Foot valve strainer diameter 80 mm bh 2
i. Pipa Header diameter 100 mm bh 1
j. Pemipaan Polypropeline :
Pipa Supply dari Ground Reservoir ke Roof Tank
- PPR PN10, diameter 65 mm m 227
- PPR PN10, diameter 50 mm m 30
k. Fitting & alat bantu ls 1
l. Instalasi daya listrik pompa titik 3
m. Ground Water Tank 90m3 (concrete) dan Rumah Pompa unit 1
9.1.2. Lantai 1
a. Bak kontrol valve unit 1
b. Instalasi Pemipaan Air Bersih, Polyprophyline PPr klas PN10
- Diameter 15 mm m 20
- Diameter 20 mm m 44
- Diameter 25 mm m 18
- Diameter 32 mm m 26
- Diameter 50 mm m 18
- Diameter 65 mm m 12
c. Gate Valve Kelas 10 K :
-Diameter 32 mm bh 1
-Diameter 25 mm bh 3
d. Instalasi Air Panas, Polyprophyline PPr PN20
- Diameter 25 mm m 3
- Diameter 15 mm m 14
- Gate valve diameter 25 mm bh 1
f. Fitting : Tee, Elbow, Reducer, dll Ls 1
h. Material Bantu titik 1
Ls 1
9.1.3. Lantai 2
a. Instalasi Pemipaan Air Bersih, Polyprophyline PPr klas PN10
- Diameter 15 mm m 90
- Diameter 20 mm m 120
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
- Diameter 25 mm m 45
- Diameter 32 mm m 26
- Diameter 50 mm m 160
- Diameter 65 mm bh 60
b. Gate Valve Kelas 10 K :
-Diameter 32 mm bh 4
-Diameter 25 mm unit 10

c. Instalasi Air Panas, Polyprophyline PPr PN20


- Diameter 25 mm m 5
- Diameter 15 mm bh 2
- Gate valve diameter 25 mm titik 2
e. Fitting : Tee, Elbow, Reducer, dll titik 1
g. Material Bantu Ls 1

9.1.4. Lantai 3
a. Instalasi Pemipaan Air Bersih, Polyprophyline PPr klas PN10
- Diameter 15 mm m 90
- Diameter 20 mm m 120
- Diameter 25 mm m 45
- Diameter 32 mm m 26
- Diameter 50 mm m 160
- Diameter 65 mm bh 60
b. Gate Valve Kelas 10 K :
-Diameter 32 mm bh 4
-Diameter 25 mm unit 10
c. Instalasi Air Panas, Polyprophyline PPr PN20
- Diameter 25 mm m 5
- Diameter 15 mm bh 2
- Gate valve diameter 25 mm titik 2
e. Fitting : Tee, Elbow, Reducer, dll titik 1
g. Material Bantu Ls 1

9.1.5. Lantai 4
a. Instalasi Pemipaan Air Bersih, Polyprophyline PPr klas PN10
- Diameter 15 mm m 90
- Diameter 20 mm m 120
- Diameter 25 mm m 45
- Diameter 32 mm m 26
- Diameter 50 mm m 160
- Diameter 65 mm bh 60
b. Gate Valve Kelas 10 K :
-Diameter 32 mm bh 4
-Diameter 25 mm unit 10
c. Instalasi Air Panas, Polyprophyline PPr PN20
- Diameter 25 mm m 5
- Diameter 15 mm bh 2
- Gate valve diameter 25 mm titik 2
e. Fitting : Tee, Elbow, Reducer, dll titik 1
g. Material Bantu Ls 1

9.1.6. Lantai 5
a. Instalasi Pemipaan Air Bersih, Polyprophyline PPr klas PN10
- Diameter 15 mm m 40
- Diameter 20 mm m 60
- Diameter 25 mm m 45
- Diameter 32 mm m 26
- Diameter 50 mm m 48
- Diameter 65 mm bh 20
b. Gate Valve Kelas 10 K :
-Diameter 32 mm bh 2
-Diameter 25 mm unit 2
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
c. Instalasi Air Panas, Polyprophyline PPr PN20
- Diameter 25 mm m 5
- Diameter 15 mm bh 2
- Gate valve diameter 25 mm titik 2
e. Fitting : Tee, Elbow, Reducer, dll titik 1
g. Material Bantu Ls 1

9.1.7. Lantai 6
a. Instalasi Pemipaan Air Bersih, Polyprophyline PPr klas PN10
- Diameter 15 mm m 40
- Diameter 20 mm m 60
- Diameter 25 mm m 45
- Diameter 32 mm m 26
- Diameter 50 mm m 48
- Diameter 65 mm bh 20
b. Gate Valve Kelas 10 K :
-Diameter 32 mm bh 2
-Diameter 25 mm unit 2
c. Fitting : Tee, Elbow, Reducer, dll titik 1
d. Material Bantu Ls 1

9.1.7. Lantai Atap


a. Roof Tank, FRP Modul Sistem kapasitas : 10 M3 (Efektif) unit 2
b. Package Booster Pump, Lengkap Panel Kontrol unit 1
kapasitas : 200 Lpm
Head : 15 M
c. Gate valve :
- Daiameter 65 mm bh 1
- Diameter 50 mm bh 4
- Diameter 25 mm bh 2
d. Floating valve bh 1
e. Level switch
f. Instalasi Pemipaan Air Bersih di lt. Atap, Polyprophyline PPr PN10
- Diameter 50 mm m 233

g. Instalasi Pemipaan Air Bersih di lt. Atap, Polyprophyline PPr PN10


- Diameter 50 mm m 192
- Gate valve diameter 20 mm bh 10
- Water Hamer ( WH ) bh 1
- Automatic Air vent ( AAV ) bh 1
h. Instalasi daya titik 1
i. Fitting : Tee, Elbow, Reducer, dll Ls 1
j. Material Bantu Ls 1
k. Pengadaan Heat Pump Water Heater kap 20,7 KW. Interdux unit 2
Power input: 4,6 kW
Return Pump 0,55 HP unit 2
Pressure Storage Tank 1500 ltr unit 2
Heat Pump Circulation Pump 133 lpm, 10 mtr,750W unit 2
System Piping, panel Control etc ls 1
Jumlah

Pekerjaan Instalasi Air Kotor Cair dan Padat


X. Air Kotor Padat
10.1 Lantai 1 & Shaft
a. Pemipaan PVC kelas AW
- Diameter 100 mm m 200
- Diameter 150 mm m 68
b. Fitting : Tee, Elbow, Reducer, dll ls 1
c. Bak kontrol buah 8
d. Material Bantu ls 1
e. Septic Tank FRP kap 5m3+pek Sipil unit 1
10.2 Lantai 1 & Shaft
Air Kotor Cair
XI. Lantai 1 & Shaft
11.1 a. Portable Grease Trap unit 5
b. Pemipaan PVC kelas AW
- Diameter 80 mm m 49
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
- Diameter 65 mm m 16
- Diameter 50 mm m 25
c. Fitting : Tee, Elbow, Reducer, dll ls 1
d. Clean Out ( CO ) buah 14
e. Material Bantu ls 1

Lantai 2 & Shaft


11.2 a. Pemipaan PVC kelas AW
- Diameter 80 mm m 164
- Diameter 65 mm m 13.5
- Diameter 50 mm m 35
b. Fitting : Tee, Elbow, Reducer, dll ls 1
c. Clean Out ( CO ) buah 20
d. Material Bantu ls 1

11.3 Lantai 3 & Shaft


a. Pemipaan PVC kelas AW
- Diameter 80 mm m 164
- Diameter 65 mm m 28.5
- Diameter 50 mm m 92
b. Fitting : Tee, Elbow, Reducer, dll ls 1
c. Clean Out ( CO ) buah 47
d. Material Bantu ls 1

11.4 Lantai 4 & shaft


a. Pemipaan PVC kelas AW
- Diameter 80 mm m 252
- Diameter 65 mm m 25
- Diameter 50 mm m 42
b. Fitting : Tee, Elbow, Reducer, dll ls 1
c. Clean Out ( CO ) buah 30
d. Material Bantu ls 1

11.5 Lantai 5 & shaft


a. Pemipaan PVC kelas AW
- Diameter 80 mm m 252
- Diameter 65 mm m 25
- Diameter 50 mm m 42
b. Fitting : Tee, Elbow, Reducer, dll ls 1
c. Clean Out ( CO ) buah 30
d. Material Bantu ls 1

11.6 Lantai 6& shaft


a. Pemipaan PVC kelas AW
- Diameter 80 mm m 252
- Diameter 65 mm m 25
- Diameter 50 mm m 42
b. Fitting : Tee, Elbow, Reducer, dll ls 1
c. Clean Out ( CO ) buah 30
d. Material Bantu ls 1
Jumlah

Pekerjaan Pipa Vent


XII. Lantai 1
12.1 a. Pipa PVC kelas AW
- Diameter 50 mm m 380
- Diameter 25 mm m 300
b. Fitting : Tee, Elbow, Reducer, dll ls 1
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

Lantai 2
12.2 a. Pipa PVC kelas AW
- Diameter 50 mm m 380
- Diameter 25 mm m 300
b. Material Bantu ls 1

Lantai 3
12.3 a. Pipa PVC kelas AW
- Diameter 50 mm m 380
- Diameter 25 mm m 300
b. Material Bantu ls 1

Lantai 4
12.4 a. Pipa PVC kelas AW
- Diameter 50 mm m 380
- Diameter 50 mm di shaft m 300
- Diameter 25 mm m 124
b. Material Bantu ls 1

Lantai 5
12.5 a. Pipa PVC kelas AW
- Diameter 50 mm m 380
- Diameter 50 mm di shaft m 300
- Diameter 25 mm m 124
b. Material Bantu ls 1

Lantai 5
12.5 a. Pipa PVC kelas AW
- Diameter 50 mm m 380
- Diameter 50 mm di shaft m 300
- Diameter 25 mm m 124
b. Material Bantu ls 1

Lantai Atap
12.6 a. Pipa PVC kelas AW
- Diameter 50 mm m 32
- Diameter 50 mm di shaft m 144
- Diameter 25 mm m 124
b. Material Bantu ls 1
Jumlah

Pekerjaan Pipa Air Hujan


XIII. Pekerjaan Pipa air Hujan
a. Pipa PVC kelas AW
- Diameter 150 mm m 560
b. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
c. Roof Drain :
- RD diameter 150 mm bh 20
d. Sumur Resapan Air Hujan unit 4
e. Bak Kontrol uk. 400 x 400 mm unit 6
g. Material Bantu ls 1
Jumlah
Jumlah Total
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

XIV. Pekerjaan Hydrant dan Sprinkler


14.1 P
1 Electric Main Pump unit 1
- Pompa
Jenis : horizontal single/multi stage
centrifugal pump, self priming.
Debit : 750 GPM
Head : 100 m
Efisiensi : 70 % minimum
Kecepatan putar : 2900 rpm
- Motor Penggerak
Jenis : 3 phase
Tegangan : 380/220 V
Starter : wye-delta
Daya poros : 75 kW (min)
Kopling : direct, base skid mounted
Kecepatan putar : 2900 rpm
c/w Panel control

2 Electric Jockey Pump unit 1


- Pompa
Jenis : vertikal multi stage
centrifugal pump, self priming
Debit : 25 GPM
Head : 110 m
Efisiensi : 70 % minimum
Kecepatan putar : 2900 rpm
- Motor Penggerak
Jenis : 3 phase
Tegangan : 380/220 V
Starter : wye-delta
Daya poros : 34.0 kW (min)
Kopling direct, base skid mounted
Kecepatan putar : 2900 rpm

3 Diesel Pump unit 1


- Pompa
Jenis : horizontal single/multi stage
centrifugal pump, self priming
Debit : 750 GPM
Head : 100 m
Efisiensi : 70 % minimum
Kecepatan putar : 2900 rpm
- Motor Penggerak (DIESEL)
Jenis : in-line internal combustion
Daya poros : 73 HP (min)
Kopling : direct, base skid mounted
Kecepatan putar : 2900 rpm
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
4 Tangki Bahan Bakar (Solar) unit 1
Kapasitas 100 liter, lengkap dengan dudukan,
pelat besi min. 3 mm. Tangki dicat merah.

5 Foot Valve Strainer With Flange dia 4" Bh 2


6 Foot Valve Strainer With Flange dia 2.5" Bh 1
7 Gate Valve Cast Iron 10 K With Flanged dia 4" Bh 4
8 Gate Valve Cast Iron 10 K With Flanged dia 3" Bh 2
9 Gate Valve Cast Iron 10 K With Flanged dia 2.5" Bh 1
10 Gate Valve Cast Iron 10 K With Flanged dia 2" Bh 1
11 Flexible Pipe dia 4" Bh 2
12 Flexible Pipe dia 3" Bh 2
13 Flexible Pipe dia 2.5" Bh 1
14 Flexible Pipe dia 2" Bh 1
15 Chek Valve Cast Iron Flanged dia 4" Bh 2
16 Chek Valve Cast Iron Flanged dia 3" Bh 2
17 Chek Valve Cast Iron Flanged dia 2" Bh 1
18 Header dia 8" Lengkap Blaind Flanged Soket Flanged L.2.8 Bh 1

14.1.2 Instalasi Hydrant


4.1.2.1 Lantai 1
a. Pemipaan BSP schedule 40 :
- Diameter 100 mm m'' 68
- Diameter 65 mm m'' 68
b. IHB, FHC type B lengkap Gate Valve, Nozzle buah 2
c. Fire Extinguisher Kap. 6kg buah 8
d. Material Bantu & Fitting ls 1

4.1.2.2 Lantai 2
a. Pemipaan BSP schedule 40 :
- Diameter 100 mm m'' 80
- Diameter 65 mm m'' 60
b. IHB, FHC type B lengkap Gate Valve, Nozzle buah 2
c. Fire Extinguisher Kap. 6kg buah 8
d. Material Bantu & Fitting ls 1

4.1.2.3 Lantai 3
a. Pemipaan BSP schedule 40 :
- Diameter 100 mm m'' 80
- Diameter 65 mm m'' 60
b. IHB, FHC type B lengkap Gate Valve, Nozzle buah 2
c. Fire Extinguisher Kap. 6kg buah 8
d. Material Bantu & Fitting ls 1
4.1.2.4 Lantai 4
a. Pemipaan BSP schedule 40 :
- Diameter 100 mm m'' 80
- Diameter 65 mm m'' 60
b. IHB, FHC type B lengkap Gate Valve, Nozzle buah 2
c. Fire Extinguisher Kap. 6kg buah 8
d. Material Bantu & Fitting ls 1
4.1.2.5 Lantai 5
a. Pemipaan BSP schedule 40 :
- Diameter 65 mm m'' 25
- Diameter 100 mm m'' 80
b. IHB, FHC type B lengkap Gate Valve, Nozzle buah 2
c. Fire Extinguisher Kap. 6kg buah 8
d. Material Bantu & Fitting ls 1
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

4.1.2.6 Lantai 6
a. Pemipaan BSP schedule 40 :
- Diameter 65 mm m'' 25
- Diameter 100 mm m'' 80
b. IHB, FHC type B lengkap Gate Valve, Nozzle buah 2
c. Fire Extinguisher Kap. 6kg buah 8
d. Material Bantu & Fitting ls 1

4.1.2.7 Lantai Atap


a. Fire Extinguisher Kap. 6kg buah 1

14.2 Instalasi Sprinkler


14.2.1 Lantai 1
1 Pemipaan BSP Schedule 40
- Diameter 100 mm Meter 40
- Diameter 80 mm Meter 80
- Diameter 65 mm Meter 28
;- Diamater 50 mm Meter 20
- Diameter 40 mm Meter 2
;- Diameter 32 mm Meter 120
;- Diameter 25 mm Meter 144
2 Gate valve
- Diameter 50 mm Buah 1
- Diameter 40 mm Buah 1
3 Head Sprinkler Buah 74
4 Indicating Valve :
- Diameter 80 mm Buah 1
5 Plat Orifice :
- Diameter 80 mm Buah 1
- Diameter 50 mm Buah 1
6 Test Valve Diameter 50 mm Buah 1
7 Drain Valve Diameter 50 mm Buah 1
8 Sight Glass Diameter 50 mm Buah 1
9 Water Flow Switch Buah 1
10 Flushing Valve Diameter 40 mm Buah 1
11 Fitting & peralatan bantu Ls 1

14.2.2 Lantai 2
1 Pemipaan BSP Schedule 40
- Diameter 100 mm Meter 40
- Diameter 80 mm Meter 80
- Diameter 65 mm Meter 18
- Diamater 50 mm Meter 11
- Diameter 40 mm Meter 2

- Diameter 32 mm Meter 64
- Diameter 25 mm Meter 195
2 Gate valve
- Diameter 50 mm Buah 1
- Diameter 40 mm Buah 1
3 Head Sprinkler Buah 76
4 Indicating Valve :
- Diameter 80 mm Buah 1
5 Plat Orifice :
- Diameter 80 mm Buah 1
- Diameter 50 mm Buah 1
6 Test Valve Diameter 50 mm Buah 1
7 Drain Valve Diameter 50 mm Buah 1
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
8 Sight Glass Diameter 50 mm Buah 1
9 Water Flow Switch Buah 1
10 Flushing Valve Diameter 40 mm Buah 1
11 Fitting & peralatan bantu Ls 1

14.2.3 Lantai 3
1 Pemipaan BSP Schedule 40
- Diameter 100 mm Meter 40
- Diameter 80 mm Meter 80
- Diameter 65 mm Meter 9
- Diamater 50 mm Meter 15
- Diameter 40 mm Meter 4
- Diameter 32 mm Meter 9
- Diameter 25 mm Meter 213
2 Gate valve
- Diameter 50 mm Buah 2
3 Head Sprinkler Buah 56
4 Indicating Valve :
- Diameter 80 mm Buah 1
5 Plat Orifice :
- Diameter 80 mm Buah 1
- Diameter 50 mm Buah 1
6 Test Valve Diameter 50 mm Buah 1
7 Drain Valve Diameter 50 mm Buah 1
8 Sight Glass Diameter 50 mm Buah 1
9 Water Flow Switch Buah 1
10 Flushing Valve Diameter 40 mm Buah 1
11 Fitting & peralatan bantu Ls 1

14.2.4 Lantai 4
1 Pemipaan BSP Schedule 40
- Diameter 100 mm Meter 40
- Diameter 80 mm Meter 80
- Diameter 65 mm Meter 44
- Diamater 50 mm Meter 24
- Diameter 40 mm Meter 6
- Diameter 32 mm Meter 18
- Diameter 25 mm Meter 110
2 Pemipaan BSP Schedule 40 di Shaft
- Diameter 100 mm Meter 16
- Diamater 50 mm Meter 16
- Diameter 40 mm Meter 16
Automatic Air Vent bh 2
3 Gate valve
- Diameter 50 mm Buah 2
4 Head Sprinkler Buah 39
5 Indicating Valve :
- Diameter 80 mm Buah 1
6 Plat Orifice :
- Diameter 80 mm Buah 1
- Diameter 50 mm Buah 1
7 Test Valve Diameter 50 mm Buah 1
8 Drain Valve Diameter 50 mm Buah 1
9 Sight Glass Diameter 50 mm Buah 1
10 Water Flow Switch Buah 1
11 Flushing Valve Diameter 40 mm Buah 1
12 Fitting & peralatan bantu Ls 1
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

14.2.5 Lantai 5
1 Pemipaan BSP Schedule 40
- Diameter 100 mm Meter 40
- Diameter 80 mm Meter 80
- Diameter 65 mm Meter 44
- Diamater 50 mm Meter 24
- Diameter 40 mm Meter 6
- Diameter 32 mm Meter 18
- Diameter 25 mm Meter 110
2 Pemipaan BSP Schedule 40 di Shaft
- Diameter 100 mm Meter 16
- Diamater 50 mm Meter 16
- Diameter 40 mm Meter 16
Automatic Air Vent bh 2
3 Gate valve
- Diameter 50 mm Buah 2
4 Head Sprinkler Buah 39
5 Indicating Valve :
- Diameter 80 mm Buah 1
6 Plat Orifice :
- Diameter 80 mm Buah 1
- Diameter 50 mm Buah 1
7 Test Valve Diameter 50 mm Buah 1
8 Drain Valve Diameter 50 mm Buah 1
9 Sight Glass Diameter 50 mm Buah 1
10 Water Flow Switch Buah 1
11 Flushing Valve Diameter 40 mm Buah 1
12 Fitting & peralatan bantu Ls 1

14.2.6 Lantai 6
1 Pemipaan BSP Schedule 40
- Diameter 100 mm Meter 40
- Diameter 80 mm Meter 80
- Diameter 65 mm Meter 44
- Diamater 50 mm Meter 24
- Diameter 40 mm Meter 6
- Diameter 32 mm Meter 18
- Diameter 25 mm Meter 110
2 Pemipaan BSP Schedule 40 di Shaft
- Diameter 100 mm Meter 16
- Diamater 50 mm Meter 16
- Diameter 40 mm Meter 16
Automatic Air Vent bh 2
3 Gate valve
- Diameter 50 mm Buah 2
4 Head Sprinkler Buah 39
5 Indicating Valve :
- Diameter 80 mm Buah 1
6 Plat Orifice :
- Diameter 80 mm Buah 1
- Diameter 50 mm Buah 1
7 Test Valve Diameter 50 mm Buah 1
8 Drain Valve Diameter 50 mm Buah 1
9 Sight Glass Diameter 50 mm Buah 1
10 Water Flow Switch Buah 1
11 Flushing Valve Diameter 40 mm Buah 1
12 Fitting & peralatan bantu Ls 1
Jumlah
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

XVI. Pekerjaan Pengadaan dan Pemasangan Elevator


1 Bed Elevator , Mitsubishi unit 2
- Kapasitas : 1000 Kg
- Kecepatan : 60 MPM
- Layanan : 6 Lantai
- Kelengkapan : ARD
- Perijinan
- Installasi per unit unit 2
Jumlah Total
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

XVII. Pekerjaan Gas Medis


17.1 Pekerjaan Instalasi Gas Oksigen
17.1.2 Lantai 1
a. Sentral Oksigen (O2) unit 1
Automatic Change Over Manifold
Kapasitas 130m3/m
Jumlah Tabung 2x10x2
Tekanan 4 s/d 6 bar
Header, Rak Tabung, Check Valve pada Tabung, Pigtails
Shut Off Valve
Regulator Tekan
b. Instalasi O2 Pipa Tembaga ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 74
- Pipa Tembaga Ø 13 mm m 30
- Pipa Tembaga Ø 20 mm m 12
- Pipa Tembaga Ø 25 mm m 10
- Pipa Tembaga Ø 32 mm m 54
- Pipa Tembaga Ø 50 mm m 36
c. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
d. Acesories :
- Bok kontrol valve 4 Gas buah 1
- Wall Outlet Oksigen buah 18
- Instalasi alarm gas medis lengkap Box unit 1
e. Material Bantu ls 1

17.1.3 Lantai 2
a. Instalasi O2 Pipa Tembaga Standart ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 307
- Pipa Tembaga Ø 13 mm m 44
- Pipa Tembaga Ø 20 mm m 49
- Pipa Tembaga Ø 25 mm m 38
- Pipa Tembaga Ø 32 mm m 46
- Pipa Tembaga Ø 40 mm m 8
b. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
c. Assesories
- Bok kontrol valve buah 1
- Wall Outlet Oksigen buah 43
- Instalasi alarm gas medis lengkap Box unit 2
d. Material Bantu ls 1

17.1.4 Lantai 3
a. Instalasi O2 Pipa Tembaga Standart ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 165
- Pipa Tembaga Ø 13 mm m 44
- Pipa Tembaga Ø 20 mm m 49
- Pipa Tembaga Ø 25 mm m 38
- Pipa Tembaga Ø 32 mm m 46
- Pipa Tembaga Ø 40 mm m 8
b. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
c. Assesories
- Bok kontrol valve buah 1
- Wall Outlet Oksigen buah 55
- Instalasi alarm gas medis lengkap Box unit 2
d. Material Bantu ls 1
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

17.1.5 Lantai 4
a. Instalasi O2 Pipa Tembaga Standart ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 165
- Pipa Tembaga Ø 13 mm m 44
- Pipa Tembaga Ø 20 mm m 49
- Pipa Tembaga Ø 25 mm m 38
- Pipa Tembaga Ø 32 mm m 46
- Pipa Tembaga Ø 40 mm m 8
b. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
c. Assesories
- Bok kontrol valve buah 1
- Wall Outlet Oksigen buah 35
- Instalasi alarm gas medis lengkap Box unit 2
d. Material Bantu ls 1

17.1.6 Lantai 5
a. Instalasi O2 Pipa Tembaga Standart ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 165
- Pipa Tembaga Ø 13 mm m 44
- Pipa Tembaga Ø 20 mm m 49
- Pipa Tembaga Ø 25 mm m 38
- Pipa Tembaga Ø 32 mm m 46
- Pipa Tembaga Ø 40 mm m 8
b. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
c. Assesories
- Bok kontrol valve buah 1
- Wall Outlet Oksigen buah 35
- Instalasi alarm gas medis lengkap Box unit 2
d. Material Bantu ls 1

17.1.7 Lantai 6
a. Instalasi O2 Pipa Tembaga Standart ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 165
- Pipa Tembaga Ø 13 mm m 44
- Pipa Tembaga Ø 20 mm m 49
- Pipa Tembaga Ø 25 mm m 38
- Pipa Tembaga Ø 32 mm m 46
- Pipa Tembaga Ø 40 mm m 8
b. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
c. Assesories
- Bok kontrol valve buah 1
- Wall Outlet Oksigen buah 35
- Instalasi alarm gas medis lengkap Box unit 2
d. Material Bantu ls 1
Jumlah
17.2 Pekerjaan Instalasi Gas Vacum
17.2.1 Lantai 1
a. Sentral Vacum (Suction) unit 1
Pompa Vacum
Duplex, motor 4 kW, Merk Becker
Tank Receiver 1000 liter
Max vacuum 3 mbar
Stop Valve, Separator Tank
Non Return Valve
Bactery Filter
Vaccum Gauge
Thermal Over load
Auto/ manual operation
Panel kontrol unit
b. Instalasi vaccum Pipa Tembaga Standart ASTM.B.88 Class L
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
- Pipa Tembaga Ø 9,6 mm m 74
- Pipa Tembaga Ø 13 mm m 30
- Pipa Tembaga Ø 20 mm m 12
- Pipa Tembaga Ø 25 mm m 10
- Pipa Tembaga Ø 32 mm m 54
- Pipa Tembaga Ø 50 mm m 36
c. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
d. Acesories :
- Wall Outlet Vaccum buah 18
e. Material Bantu ls 1

17.2.2 Lantai 2
b. Instalasi vaccum Pipa Tembaga Standart ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 307
- Pipa Tembaga Ø 15mm m 44
- Pipa Tembaga Ø 20 mm m 49
- Pipa Tembaga Ø 25 mm m 38
- Pipa Tembaga Ø 32 mm m 46
- Pipa Tembaga Ø 40 mm m 8
c. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
d. Acesories :
- Wall Outlet Vaccum buah 43
e. Material Bantu ls 1

17.2.3 Lantai 3
a. Instalasi vaccum Pipa Tembaga Standart ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 165
- Pipa Tembaga Ø 13 mm m 44
- Pipa Tembaga Ø 20 mm m 49
- Pipa Tembaga Ø 25 mm m 38
- Pipa Tembaga Ø 32 mm m 46
- Pipa Tembaga Ø 40 mm m 8
b. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
c. Assesories
- Wall Outlet Vaccum buah 55
d. Material Bantu ls 1

17.2.4 Lantai 4
a. Instalasi vaccum Pipa Tembaga Standart ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 165
- Pipa Tembaga Ø 13 mm m 44
- Pipa Tembaga Ø 20 mm m 49
- Pipa Tembaga Ø 25 mm m 38
- Pipa Tembaga Ø 32 mm m 46
- Pipa Tembaga Ø 40 mm m 8
b. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
c. Assesories
- Wall Outlet Vaccum buah 35
d. Material Bantu ls 1

17.2.5 Lantai 5
a. Instalasi vaccum Pipa Tembaga Standart ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 165
- Pipa Tembaga Ø 13 mm m 44
- Pipa Tembaga Ø 20 mm m 49
- Pipa Tembaga Ø 25 mm m 38
- Pipa Tembaga Ø 32 mm m 46
- Pipa Tembaga Ø 40 mm m 46
b. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
c. Assesories
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
- Wall Outlet Vaccum buah 35
d. Material Bantu ls 1

17.2.6 Lantai 6
a. Instalasi vaccum Pipa Tembaga Standart ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 165
- Pipa Tembaga Ø 13 mm m 44
- Pipa Tembaga Ø 20 mm m 49
- Pipa Tembaga Ø 25 mm m 38
- Pipa Tembaga Ø 32 mm m 46
- Pipa Tembaga Ø 40 mm m 46
b. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
c. Assesories
- Wall Outlet Vaccum buah 35
d. Material Bantu ls 1

17.3 Pekerjaan Instalasi N20


17.3.1 Lantai 1

a. Sentral Nitrous Oxide (N2O) unit 1


Automatic Change Over Manifold
safety Valve
Jumlah Tabung 2x1x2
Tekanan 4 s/d 6 bar
Header, Rak Tabung, Check Valve pada Tabung, Pigtails
Regulator Tekan
- Pipa Tembaga Ø 40mm m 30
- Pipa Tembaga Ø 25 mm m 8
Lantai 2
b. Instalasi N2O Pipa Tembaga Standart ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 24
- Pipa Tembaga Ø 13 mm m 32
- Pipa Tembaga Ø 20 mm m 18
- Pipa Tembaga Ø 25 mm m 21
c. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
d. Acesories :
- Wall Outlet N2O buah 3
e. Material Bantu ls 1
Jumlah

17.4 Pekerjaan Instalasi Air Compressor


Motor Hitachi Bebicon Oil Free Compressor unit 1
Motor Output : 3,7 kW 2 x 5HP
Air Tank 500 liter
Air Filter
Bacteral filter
Air regulator
Cap 405l/mnt
- Pipa Tembaga Ø 40mm m 30
- Pipa Tembaga Ø 25 mm m 8

Lantai 2
b. Instalasi N2O Pipa Tembaga Standart ASTM.B.88 Class L
- Pipa Tembaga Ø 9,6 mm m 24
- Pipa Tembaga Ø 13 mm m 32
- Pipa Tembaga Ø 20 mm m 18
- Pipa Tembaga Ø 25 mm m 21
c. Fitting : Tee, Elbow, Reducer, Union, dll ls 1
d. Acesories :
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6
- Wall Outlet Compress Air buah 3
e. Material Bantu ls 1
Jumlah
Jumlah Total
No UraianPekerjaan Satuan Volume Harga Satuan Jumlah Harga
(Rp.) (Rp.)
1 2 3 4 5 6

XVIII. Pekerjaan Perlengkapan Sanitair


18.1 Lantai 1
1 Kloset Duduk TOTO Lengkap Bh 7
2 Jet Washer Merk. TOTO Bh 7
3 Kran Dinding Merk. TOTO Bh 7
4 Lavatory (Washtafel) Bh 8
5 Floor Drain Merk. TOTO Bh 7
6 Slop Sink (Spoel Hok) Bh 1
18.2 Lantai 2
1 Kloset Duduk Merk. TOTO Lengkap Bh 7
2 Jet Washer Merk. TOTO Bh 7
3 Kran Dinding Merk. TOTO Bh 8
4 Lavatory (Washtafel) Bh 16
5 Slop Sink (Spoel Hok) Bh 3
6 Floor Drain Merk. TOTO Bh 10
7 Shower Dinding + Kran Bh 2
18.3 Lantai 3
1 Kloset Duduk Merk. TOTO Lengkap Bh 13
2 Jet Washer Merk. TOTO Bh 13
3 Kran Dinding Merk. TOTO Bh 14
4 Lavatory (Washtafel) Bh 12
5 Slop Sink (Spoel Hok) Bh 3
6 Floor Drain Merk. TOTO Bh 16
7 Shower Dinding + Kran Bh 9
18.4 Lantai 4
1 Kloset Duduk Merk. TOTO Lengkap Bh 22
2 Jet Washer Merk. TOTO Bh 22
3 Kran Dinding Merk. TOTO Bh 23
4 Lavatory (Washtafel) Bh 20
5 Slop Sink (Spoel Hok) Bh 2
6 Floor Drain Merk. TOTO Bh 22
7 Shower Dinding + Kran Bh 24
18.5 Lantai 5
1 Kloset Duduk Merk. TOTO Lengkap Bh 20
2 Jet Washer Merk. TOTO Bh 20
3 Kran Dinding Merk. TOTO Bh 21
4 Lavatory (Washtafel) Bh 18
5 Slop Sink (Spoel Hok) Bh 2
6 Floor Drain Merk. TOTO Bh 6
7 Shower Dinding + Kran Bh 22

18.6 Lantai 6
1 Kloset Duduk Merk. TOTO Lengkap Bh 19
2 Jet Washer Merk. TOTO Bh 19
3 Kran Dinding Merk. TOTO Bh 20
4 Lavatory (Washtafel) TOTO Bh 17
5 Floor Drain Merk. TOTO Bh 21
6 Shower Dinding + Kran Bh 14
7 Slop Sink (Spoel Hok) Bh 2
NO URAIAN PEKERJAAN VOL SAT HARGA SAT TOTAL HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6

5.1.0 Pekerjaan Tata Udara Lantai 1


Pekerjaan Peralatan Utama AC
Pengadaan dan pemasangan unit AC lengkap dengan penggantung dan
accessories
1 IU/OU LT 1.1 1 unit
Tipe Indoor : Split Duct
Kapasitas Pendinginan : 125.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

2 IU/OU LT 1.2 - LT 1.3 2 unit


Tipe Indoor : Split Duct
Kapasitas Pendinginan : 150.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

3 Pengerjaan Instalasi Pipa berikut kabel kontrol dan Aksesoris


Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 1.1 28 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 1/8" IU LT 1.2 23 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 1.3 22 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 1.1 8 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 1.2 4 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 1.3 4 m'
Pipa Drain Pipa PVC AW 3" dengan Insulation pada riser 38 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 1.1 32 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 1.2 25 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 1.3 24 m'
Kabel Power NYY 4 x 6 mm² 86 m'

4 Pengerjaan Istalasi Ducting dengan Polyurethane


Intalasi Ducting IU LT 1.1 86 m²
Intalasi Ducting IU LT 1.2 80 m²
Intalasi Ducting IU LT 1.3 80 m²
Instalasi Ducting untuk Exhaust lantai 1 s/d lt. 6 112 m²
Flexible Round Duct uk. 10" 96 m'

5 Pengerjaan Grile
SAD uk. 12 " x 12 " 32 buah
RAG uk 22 " x 12 " 11 buah
RAG uk 20 " x 10 " 1 buah
RAG uk 16 " x 8 " 7 buah
EAG uk. 6" x 6" 14 buah
FAG uk. 28" x 14" 1 buah
Volume Damper uk. 8" x 8" 3 buah

6 Exhaust Fan ( EF ) – 2.1 7 unit


- Type : Axial Duct
Aliran Udara : 100 CFM
Static Press. : 0,2 IN WG
Karakteristik : 220/240 V , 1 Ph , 50 Hz
Termasuk hanger/dudukan, ongkos pasang, dll

■ Sub Total Pekerjaan Tata Udara Lantai 1

5.1.2 Pekerjaan Tata Udara Lantai 2


I Pekerjaan Peralatan Utama AC

Pengadaan dan pemasangan unit AC lengkap dengan penggantung dan


accessories

1 IU/OU LT 2.1 1 unit


Tipe Indoor : Split Duct
Kapasitas Pendinginan : 100.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

IU/OU LT LT 2.2 1 unit


Tipe Indoor : Split Duct
Kapasitas Pendinginan : 125.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

2 IU/OU LT 2.3, dan LT 2.4 2 unit


Tipe Indoor : Split Duct
Kapasitas Pendinginan : 150.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

2 Pengerjaan Instalasi Pipa berikut kabel kontrol dan Aksesoris


Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 2.1 23 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 2.2 21 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT2.3 19 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 2.4 19 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 2.1 6 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 2.2 4 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 2.3 4 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 2.4 4 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 2.1 27 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 2.2 24 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 2.3 23 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 2.4 23 m'
Kabel Power NYY 4 x 6 mm² 64 m'

3 Pengerjaan Istalasi Ducting dengan Polyurethane


Intalasi Ducting IU LT 2.1 110 m²
Intalasi Ducting IU LT 2.2 76 m²
Intalasi Ducting IU LT 2.3 110 m²
Intalasi Ducting IU LT 2.4 110 m²
Flexible Round Duct uk. 10" 117 m'

4 Pengerjaan Grile
SAD uk. 12 " x 12 " 32 buah
SAD uk. 10 " x 10 " 11 buah
SAD uk. 8 " x 8 " 1 buah
RAG uk 22 " x 12 " 7 buah
RAG uk 16 " x 8 " 14 buah
RAG uk 12 " x 8 " 1 buah
RAG uk 12 " x 6 " 3 buah
EAG uk. 6" x 6" 14 buah
FAG uk. 28" x 14" 1 buah
Volume Damper uk. 8" x 8" 3 buah

14 Exhaust Fan ( EF ) – 2.1 9 unit


- Type : Axial Duct
Aliran Udara : 100 CFM
Static Press. : 0,2 IN WG
Karakteristik : 220/240 V , 1 Ph , 50 Hz
Termasuk hanger/dudukan, ongkos pasang, dll

■ Sub Total Pekerjaan Tata Udara Lantai 2

5.1.3 Pekerjaan Tata Udara Lantai 3


I Pekerjaan Peralatan Utama AC
Pengadaan dan pemasangan unit AC lengkap dengan penggantung dan
accessories

1 IU/OU D2, dan D4 2 unit


Tipe Indoor : Split Duct
Kapasitas Pendinginan : 150.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

2 IU/OU LT2 -1 1 unit


Tipe Indoor : Split Duct
Kapasitas Pendinginan : 125.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

3 Pengerjaan Instalasi Pipa berikut kabel kontrol dan Aksesoris


Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 3.1 23 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 3.2 21 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT3.3 19 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 3.1 6 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 3.2 4 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 3.3 4 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 3.1 27 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 3.2 24 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 3.3 23 m'
Kabel Power NYY 4 x 6 mm² 64 m'

4 Pengerjaan Istalasi Ducting dengan Polyurethane


Intalasi Ducting IU LT 3.1 110 m²
Intalasi Ducting IU LT 3.2 76 m²
Intalasi Ducting IU LT 3.3 110 m²
Flexible Round Duct uk. 10" 117 m'

5 Pengerjaan Grile
SAD uk. 12 " x 12 " 9 buah
SAD uk. 10 " x 10 " 22 buah
SAD uk. 8 " x 8 " 8 buah
RAG uk 22 " x 12 " 6 buah
RAG uk 22 " x 10 " 6 buah
RAG uk 16 " x 18 " 14 buah
EAG uk. 6" x 6" 1 buah
FAG uk. 28" x 14" 7 buah
Volume Damper uk. 8" x 8" 14 buah

6 Exhaust Fan ( EF ) – 2.1 16 unit


- Type : Axial Duct
Aliran Udara : 100 CFM
Static Press. : 0,2 IN WG
Karakteristik : 220/240 V , 1 Ph , 50 Hz
Termasuk hanger/dudukan, ongkos pasang, dll

■ Sub Total Pekerjaan Tata Udara Lantai 3

5.1.4 Pekerjaan Tata Udara Lantai 4


I Pekerjaan Peralatan Utama AC
Pengadaan dan pemasangan unit AC lengkap dengan penggantung dan
accessories
2 IU/OU D2, dan D4 2 unit
Tipe Indoor : Split Duct
Kapasitas Pendinginan : 150.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

1 IU/OU LT2 -1 1 unit


Tipe Indoor : Split Duct
Kapasitas Pendinginan : 125.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

2 Pengerjaan Instalasi Pipa berikut kabel kontrol dan Aksesoris


Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 4.1 32 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 4.2 36 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT4.3 46 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 4.1 17 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 4.2 20 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 4.3 18 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 4.1 42 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 4.2 48 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 4.3 51 m'
Kabel Power NYY 4 x 6 mm2 66 m'
Kabel Power NYY 4 x 10 mm2 34 m'

3 Pengerjaan Istalasi Ducting dengan Polyurethane


Intalasi Ducting IU LT 4.1 132 m²
Intalasi Ducting IU LT 4.2 74 m²
Intalasi Ducting IU LT 4.3 126 m²
Flexible Round Duct uk. 10" 123 m'

4 Pengerjaan Grile
SAD uk. 12 " x 12 " 8 buah
SAD uk. 10 " x 10 " 25 buah
SAD uk. 8 " x 8 " 8 buah
RAG uk 22 " x 12 " 8 buah
RAG uk 22 " x 10 " 1 buah
RAG uk 16 " x 18 " 12 buah
RAG uk 12 " x 8 " 2 buah
RAG uk 12 " x 6 " 8 buah
EAG uk. 6" x 6" 14 buah
FAG uk. 28" x 14" 1 buah
Volume Damper uk. 8" x 8" 3 buah

5 Exhaust Fan ( EF ) – 2.1 16 unit


- Type : Axial Duct
Aliran Udara : 100 CFM
Static Press. : 0,2 IN WG
Karakteristik : 220/240 V , 1 Ph , 50 Hz
Termasuk hanger/dudukan, ongkos pasang, dll

■ Sub Total Pekerjaan Tata Udara Lantai 4

5.1.5 Pekerjaan Tata Udara Lantai 5


I Pekerjaan Peralatan Utama AC
Pengadaan dan pemasangan unit AC lengkap dengan penggantung dan
accessories

2 IU/OU D2, dan D4 2 unit


Tipe Indoor : Split Duct
Kapasitas Pendinginan : 150.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

1 IU/OU LT2 -1 1 unit


Tipe Indoor : Split Duct
Kapasitas Pendinginan : 125.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

3 Pengerjaan Instalasi Pipa berikut kabel kontrol dan Aksesoris


Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 5.1 32 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 5.2 37 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT5.3 44 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 5.1 17 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 5.2 20 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 5.3 18 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 5.1 36 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 5.2 41 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 5.3 47 m'
Kabel Power NYY 4 x 6 mm2 61 m'
Kabel Power NYY 4 x 10 mm2 32 m'

4 Pengerjaan Istalasi Ducting dengan Polyurethane


Intalasi Ducting IU LT 5.1 82 m²
Intalasi Ducting IU LT 5.2 92 m²
Intalasi Ducting IU LT 5.3 99 m²
Flexible Round Duct uk. 10" 99 m'

5 Pengerjaan Grile
SAD uk. 12 " x 12 " 8 buah
SAD uk. 10 " x 10 " 25 buah
RAG uk 22 " x 12 " 10 buah
RAG uk 22 " x 10 " 5 buah
RAG uk 16 " x 18 " 3 buah
EAG uk. 6" x 6" 14 buah
FAG uk. 28" x 14" 1 buah
Volume Damper uk. 8" x 8" 3 buah

6 Exhaust Fan ( EF ) – 2.1 22 unit


- Type : Axial Duct
Aliran Udara : 100 CFM
Static Press. : 0,2 IN WG
Karakteristik : 220/240 V , 1 Ph , 50 Hz
Termasuk hanger/dudukan, ongkos pasang, dll

■ Sub Total Pekerjaan Tata Udara Lantai 5

5.1.6 Pekerjaan Tata Udara Lantai 6


I Pekerjaan Peralatan Utama AC
Pengadaan dan pemasangan unit AC lengkap dengan penggantung dan
accessories

2 IU/OU D2, dan D4 2 unit


Tipe Indoor : Split Duct
Kapasitas Pendinginan : 150.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

1 IU/OU LT2 -1 1 unit


Tipe Indoor : Split Duct
Kapasitas Pendinginan : 125.000BTU/H
Daya Listrik : 11.45 KW/3800V/3ph/50Hz

2 Pengerjaan Instalasi Pipa berikut kabel kontrol dan Aksesoris


Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 6.1 36 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT 6.2 40 m'
Pipa Tembaga dengan Insulation 25 mm : 5/8" + 1 3/8" IU LT6.3 42 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 6.1 17 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 6.2 20 m'
Pipa Drain Pipa PVC AW 1" dengan Insulation IU LT 6.3 18 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 6.1 41 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 6.2 45 m'
Kabel Kontrol NYM 4 X 4 mm² + 4 x 2.5 mm² IU LT 6.3 45 m'
Kabel Power NYY 4 x 6 mm2 61 m'
Kabel Power NYY 4 x 10 mm2 32 m'

3 Pengerjaan Istalasi Ducting dengan Polyurethane


Intalasi Ducting IU LT 6.1 112 m²
Intalasi Ducting IU LT 6.2 86 m²
Intalasi Ducting IU LT 6.3 131 m²
Flexible Round Duct uk. 10" 123 m'

4 Pengerjaan Grile
SAD uk. 12 " x 12 " 8 buah
SAD uk. 10 " x 10 " 25 buah
SAD uk. 8 " x 8 " 8 buah
RAG uk 22 " x 12 " 8 buah
RAG uk 16 " x 18 " 14 buah
RAG uk 12 " x 8 " 1 buah
RAG uk 12 " x 6 " 8 buah
EAG uk. 6" x 6" 14 buah
FAG uk. 28" x 14" 1 buah
Volume Damper uk. 8" x 8" 3 buah

5 Exhaust Fan ( EF ) – 2.1 22 unit


- Type : Axial Duct
Aliran Udara : 100 CFM
Static Press. : 0,2 IN WG
Karakteristik : 220/240 V , 1 Ph , 50 Hz
Termasuk hanger/dudukan, ongkos pasang, dll

■ Sub Total Pekerjaan Tata Udara Lantai 6

TOTAL PEKERJAAN AC