Title : Design of FP at Approaching Road Checked: B. Veeresh
Date: 17.12.2019
𝟏+𝒓𝒏−𝟏
Traffic Growth Factor TGF =
𝒓
33.07 IRC 37(2018) - § 4.6.1
Where
A = Initial traffic in the year of completion of construction in terms of the
number of commercial vehicles per day (CVPD).
D = Lane distribution factor.
F = Vehicle damage factor (VDF).
n = Design life in years.
r = Annual growth rate of commercial vehicles.
IRC 37(2001) -
=
Pavement Thickness 620 mm Pg-37
Type-2 W/C
= MORTH §
1. Wearing Course (BC+MA) 65 mm 2702.1
2. Wearing Course (DBM) = 105 mm
3. Base Course (WMM) = 250 mm
4. Sub Base Course (GSB) = 200 mm
5. Sub Grade = Well Compacted
Page 1 of 4
Project Name: NAD – Vizag Designed: V. Manikanta
Title : Design of FP at Approaching Road Checked: B. Veeresh
Date: 17.12.2019
Material Considerations:
1.a. Wearing Course (MA=25mm) - MASTIC ASPHALT
19 100
13.2 88-96
2.36 00-05
Bitumen 14 to 17 %
Content
Aggregate Grading IRC 107
(2013) Table-3 Mastic
Asphalt (Fine Aggregate
including Fillers)
Sieve (mm) rade-5 (200m
m
2.36 00-25
0.6 May-25
0.212 Oct-20
0.075 30-50
Page 2 of 4
Project Name: NAD – Vizag Designed: V. Manikanta
Title : Design of FP at Approaching Road Checked: B. Veeresh
Date: 17.12.2019
26.5 -
19 100
13.2 9.-100
9.5 70-88
4.75 53-71
2.36 42-58
1.18 34-48
0.6 26-38
0.3 18-28
0.15 12-20
0.075 04-10
BT Content Min. 5.40%
45 100
37.5 95-100
26.5 63-93
13.2 55-75
4.75 38-54
2.36 28-42
0.3 07-21
0.075 02-08
BT content Min. 4.00%
Page 3 of 4
Project Name: NAD – Vizag Designed: V. Manikanta
Title : Design of FP at Approaching Road Checked: B. Veeresh
Date: 17.12.2019
53 100
45 95-100
22.4 60-80
11.2 40-60
4.75 25-40
2.36 15-30
0.6 08-22
0.075 00-05
75 100
53 80-100
26.5 55-90
9.5 35-65
4.75 25-50
2.36 Oct-20
0.85 02-10
0.425 0-05
Page 4 of 4