TMT 8mm including etc.(labour 2*350/panel) +(10m/panel)=30MT @4800 MS plain Dowel of dia.25mm490/10^6 x0.3x7.85x12000 50,000 Threaded lifty arrangement 7000 Nos.of female 100 Nos of male 20 Total Mould making cost including rubber pad ( if prov.) MS base Ms mould ,demoulding system 10% of total Transportaion of panel including (10000) 25km of lead. 10,000 Leveling of base ( avg 20mm) using C:S mix .including levelling of mix ,rolling of mix 400kg Hydra For unloading the panels + placing 4500/day 3 labours per hydra 350/day Grouting of dowel joints 12000x0.15x0.05x0.1 1000/cu.m Post tensioning of panels including PT wire 10,00,000 for pre tens.including wedges & barrel 70000/MT Qty Amount 700 cu.m 3710000 1930000 13.9 MT 692370 7100 142000 6474370 647437 88 88,000 140 56,000 20 90,000 60 21,000 9 9,000 10 700000 14560177