Sl.

No Description Unit Qty


1 Laying charges of 100mm thick approved filter CUM
material underneath pitching in slopes 8151

Laying charges of 230mm thick stone pitching on


2 slopes laid over prepared filter media with 1:3 CUM
cement mortar pointing and filling the joints
properly with mortar 9500

3 Laying charges of 230mm thick dry stone boulder CUM


pitching on slopes/ Providing and laying stone
boulder apron for protection against scour with
stone boulders weighing not less than 40kg each 813
4 Laying charges of 230mm thick stone pitched CUM
drains, joints grouted with cement mortar 1:3 13000

Drain Excavation in soil and disposal of same within


5 1km, Scope includes trimming and maintaining CUM
slope as per drawing 15194