1 Laying charges of 100mm thick approved filter CUM material underneath pitching in slopes 8151
Laying charges of 230mm thick stone pitching on
2 slopes laid over prepared filter media with 1:3 CUM cement mortar pointing and filling the joints properly with mortar 9500
3 Laying charges of 230mm thick dry stone boulder CUM
pitching on slopes/ Providing and laying stone boulder apron for protection against scour with stone boulders weighing not less than 40kg each 813 4 Laying charges of 230mm thick stone pitched CUM drains, joints grouted with cement mortar 1:3 13000
Drain Excavation in soil and disposal of same within
5 1km, Scope includes trimming and maintaining CUM slope as per drawing 15194 Rate Amount