Professional Documents
Culture Documents
1.
o = RM x / DAY
o West Malaysia = RM x / DAY
All levels:
o Northern region estates = (500KM X 0.80) + (500KM X 0.70) + 20% = RM 900 / TRIP
o Southern
o .80) X 2 + 20% = RM 390 / TRIP
a
o Sabah = RM 1w / Round Trip Region Estates = (500KM X0.80) + (200KM X0.70) + 20% =
RM 650 / TRIP
o Central East Region Estates (
o 0
o Sarawak = RM w / Round Trip
band below:
o Sabah = RM w / Round Trip
o Sarawak = R250KM X 0.80) X 2 +20% = RM 480 / TRIP
o Central West Region Estates = (200KM X M 1,100 / Round Trip
All Levels)
Overseas – Others:
10.