You are on page 1of 2

GOAL PROGRAMMING

your company has been asigned to build stadium that provides good returns within the given expenditure and gro
built 5 VIP galleries, 10 economical galleries and 15 least cost type galleries which can be flexible, proposed area is
the prority is towards VIP gallery, least cost type and should not exceed size and expen

Type VIP GalleryEconomical gallery least cost seatings


Size 400 750 1050
cost 1800 33000 45150

Constraints VIP GalleryEconomical gallery least cost Total size Total Budget
NO. of galleries to be u 5 5 15 21500 851250
under 0 5 0 0 0
small 0 0 0 0 0
proposed Total 5 10 15 21500 851250
target 5 10 15 25000 1000000

Percentage VIP GalleryEconomical gallery least cost Total size Total Budget
uder 0 0.5 0 0 0
small 0 0 0 0 0

Weightage VIP GalleryEconomical gallery least cost Total size Total Budget
uder 1 0 1 0 0
small 0 1 0 1 1

OBjective 0
the given expenditure and ground size and the company preference is to
an be flexible, proposed area is 25000 sq. feet, budget is 10 lakhs and also
ould not exceed size and expenditure coated

You might also like