TIPPL-GRD (JV)

RFI SUMMARY SHEET


Name of the Project :- Development of NH-31 to 4 lane configuration from km 551.360 to km 563.260 (Ghoshpukur to Bihar More, Bagdogra) in Darjeeling District,West Bengal under EPC Mode''
(Project length-11.90 km.)
RFI SUMMARY DATE :
Submission Chainage Chainage Proposed Proposed
Sl No. RFI No. Side Description of Work Submitted By Status
Date (Km) (Km) Inspection Inspection
5711 TIPPLGRDJV/NH-31/HW/ 5837 30-Dec-19 RHS Median Kerb Laying HIGHWAY MEDIAN Kerb Laying MR. SATYAKI SARKAR 2-Dec-19 11:30
5712 TIPPLGRDJV/NH-31/HW/ 5838 30-Dec-19 RHS Median Kerb Laying HIGHWAY MEDIAN Kerb Laying MR. SATYAKI SARKAR 2-Dec-19 12:30
5713 TIPPLGRDJV/NH-31/HW/ 5839 30-Dec-19 LHS Median Kerb Laying HIGHWAY MEDIAN Kerb Laying MR. SATYAKI SARKAR 2-Dec-19 12:30
5714 TIPPLGRDJV/NH-31/HW/ 5840 30-Dec-19 558+120 558+320 200 RHS GSB Laying for Bus Bye HIGHWAY BUS BYE GSB Laying MR. SATYAKI SARKAR 2-Dec-19 01:30
FDD testing & Level Checking on
5715 TIPPLGRDJV/NH-31/HW/ 5841 30-Dec-19 558+120 558+320 200 RHS HIGHWAY BUS BYE GSB Top MR. SATYAKI SARKAR 2-Dec-19 02:30
GSB Top Layer
Reinforcement & Shuttering Checking
5717 TIPPLGRDJV/NH-31/STR/ 5842 30-Dec-19 553+697 LHS of Raft of foundation of A-2 of MCW STRUCTURE Minor Bridge Renf. Of raft MR. ARINDAM SINHA 2-Dec-19 11:30
Bridge
5718 TIPPLGRDJV/NH-31/STR/ 5843 30-Dec-19 553+697 LHS Concreting of Slab of Side Drain STRUCTURE Minor Bridge Concreting of raft MR. ARINDAM SINHA 2-Dec-19 11:40
Reinforcement & Shuttering checking
5719 TIPPLGRDJV/NH-31/STR/ 5844 30-Dec-19 553+950 553+970 20 RHS STRUCTURE DRAIN reinf. Of deck slab MR. ARINDAM SINHA 2-Dec-19 12:30
of Deck slab of Side Drain.
5720 TIPPLGRDJV/NH-31/STR/ 5845 30-Dec-19 553+950 553+970 20 LHS Concreting of Deck Slab of Side Drain STRUCTURE DRAIN Concreting of Deck slab MR. ARINDAM SINHA 2-Dec-19 01:30
Reinforcement & Shuttering checking RETAINING
5722 TIPPLGRDJV/NH-31/STR/ 5846 30-Dec-19 555+070 555+130 60 LHS STRUCTURE reinf. Of wall 1st lift MR. ARINDAM SINHA 2-Dec-19 02:30
of wall 1st lift of ret.wall WALL
RETAINING
5723 TIPPLGRDJV/NH-31/STR/ 5847 30-Dec-19 555+070 555+130 60 LHS Concreting of wall 1st lift of ret. Wall STRUCTURE concreting of wall 1st lift MR. ARINDAM SINHA 2-Dec-19 02:45
WALL
5724 TIPPLGRDJV/NH-31/STR/ 5848 30-Dec-19 552+480 LHS Reinforcement checking of RE Pannel STRUCTURE RE PANNEL reinf. Of RE Pannel MR. ARINDAM SINHA 2-Dec-19 03:00
5725 TIPPLGRDJV/NH-31/STR/ 5849 30-Dec-19 552+480 LHS Concreting of RE Pannel STRUCTURE RE PANNEL concreting of RE Pannel MR. ARINDAM SINHA 2-Dec-19 03:15
Reinforcement & Shuttering checking
5731 TIPPLGRDJV/NH-31/STR/ 5850 30-Dec-19 560+654 LHS of wall 1st lift of reconstruction type STRUCTURE CULVERT reinf. Of wall 1st lift MR. ARINDAM SINHA 2-Dec-19 04:15
box CULVERT
Concreting of wall 1st lift of
5733 TIPPLGRDJV/NH-31/STR/ 5851 30-Dec-19 560+654 LHS STRUCTURE CULVERT concreting of wall 1st lift MR. ARINDAM SINHA 2-Dec-19 04:20
reconstruction type box culvert
Level checking of PCC & Layout of
5733 TIPPLGRDJV/NH-31/STR/ 5852 30-Dec-19 562+405 LHS STRUCTURE CULVERT Layout of raft MR. ARINDAM SINHA 2-Dec-19 04:20
Raft of widening type Box CULVERT
Reinforcement & Shuttering checking
5733 TIPPLGRDJV/NH-31/STR/ 5853 30-Dec-19 562+405 LHS STRUCTURE CULVERT Reinf. Of Raft MR. ARINDAM SINHA 2-Dec-19 04:20
of widening type box culvert
Concreting of widening type box
5733 TIPPLGRDJV/NH-31/STR/ 5854 30-Dec-19 562+405 LHS STRUCTURE CULVERT Concreting of raft MR. ARINDAM SINHA 2-Dec-19 04:20
culvert