Name of the Project :- Development of NH-31 to 4 lane configuration from km 551.360 to km 563.260 (Ghoshpukur to Bihar More, Bagdogra) in Darjeeling District,West Bengal under EPC Mode'' (Project length-11.90 km.) RFI SUMMARY DATE : Submission Chainage Chainage Proposed Proposed Sl No. RFI No. Side Description of Work Submitted By Status Date (Km) (Km) Inspection Inspection 5711 TIPPLGRDJV/NH-31/HW/ 5837 30-Dec-19 RHS Median Kerb Laying HIGHWAY MEDIAN Kerb Laying MR. SATYAKI SARKAR 2-Dec-19 11:30 5712 TIPPLGRDJV/NH-31/HW/ 5838 30-Dec-19 RHS Median Kerb Laying HIGHWAY MEDIAN Kerb Laying MR. SATYAKI SARKAR 2-Dec-19 12:30 5713 TIPPLGRDJV/NH-31/HW/ 5839 30-Dec-19 LHS Median Kerb Laying HIGHWAY MEDIAN Kerb Laying MR. SATYAKI SARKAR 2-Dec-19 12:30 5714 TIPPLGRDJV/NH-31/HW/ 5840 30-Dec-19 558+120 558+320 200 RHS GSB Laying for Bus Bye HIGHWAY BUS BYE GSB Laying MR. SATYAKI SARKAR 2-Dec-19 01:30 FDD testing & Level Checking on 5715 TIPPLGRDJV/NH-31/HW/ 5841 30-Dec-19 558+120 558+320 200 RHS HIGHWAY BUS BYE GSB Top MR. SATYAKI SARKAR 2-Dec-19 02:30 GSB Top Layer Reinforcement & Shuttering Checking 5717 TIPPLGRDJV/NH-31/STR/ 5842 30-Dec-19 553+697 LHS of Raft of foundation of A-2 of MCW STRUCTURE Minor Bridge Renf. Of raft MR. ARINDAM SINHA 2-Dec-19 11:30 Bridge 5718 TIPPLGRDJV/NH-31/STR/ 5843 30-Dec-19 553+697 LHS Concreting of Slab of Side Drain STRUCTURE Minor Bridge Concreting of raft MR. ARINDAM SINHA 2-Dec-19 11:40 Reinforcement & Shuttering checking 5719 TIPPLGRDJV/NH-31/STR/ 5844 30-Dec-19 553+950 553+970 20 RHS STRUCTURE DRAIN reinf. Of deck slab MR. ARINDAM SINHA 2-Dec-19 12:30 of Deck slab of Side Drain. 5720 TIPPLGRDJV/NH-31/STR/ 5845 30-Dec-19 553+950 553+970 20 LHS Concreting of Deck Slab of Side Drain STRUCTURE DRAIN Concreting of Deck slab MR. ARINDAM SINHA 2-Dec-19 01:30 Reinforcement & Shuttering checking RETAINING 5722 TIPPLGRDJV/NH-31/STR/ 5846 30-Dec-19 555+070 555+130 60 LHS STRUCTURE reinf. Of wall 1st lift MR. ARINDAM SINHA 2-Dec-19 02:30 of wall 1st lift of ret.wall WALL RETAINING 5723 TIPPLGRDJV/NH-31/STR/ 5847 30-Dec-19 555+070 555+130 60 LHS Concreting of wall 1st lift of ret. Wall STRUCTURE concreting of wall 1st lift MR. ARINDAM SINHA 2-Dec-19 02:45 WALL 5724 TIPPLGRDJV/NH-31/STR/ 5848 30-Dec-19 552+480 LHS Reinforcement checking of RE Pannel STRUCTURE RE PANNEL reinf. Of RE Pannel MR. ARINDAM SINHA 2-Dec-19 03:00 5725 TIPPLGRDJV/NH-31/STR/ 5849 30-Dec-19 552+480 LHS Concreting of RE Pannel STRUCTURE RE PANNEL concreting of RE Pannel MR. ARINDAM SINHA 2-Dec-19 03:15 Reinforcement & Shuttering checking 5731 TIPPLGRDJV/NH-31/STR/ 5850 30-Dec-19 560+654 LHS of wall 1st lift of reconstruction type STRUCTURE CULVERT reinf. Of wall 1st lift MR. ARINDAM SINHA 2-Dec-19 04:15 box CULVERT Concreting of wall 1st lift of 5733 TIPPLGRDJV/NH-31/STR/ 5851 30-Dec-19 560+654 LHS STRUCTURE CULVERT concreting of wall 1st lift MR. ARINDAM SINHA 2-Dec-19 04:20 reconstruction type box culvert Level checking of PCC & Layout of 5733 TIPPLGRDJV/NH-31/STR/ 5852 30-Dec-19 562+405 LHS STRUCTURE CULVERT Layout of raft MR. ARINDAM SINHA 2-Dec-19 04:20 Raft of widening type Box CULVERT Reinforcement & Shuttering checking 5733 TIPPLGRDJV/NH-31/STR/ 5853 30-Dec-19 562+405 LHS STRUCTURE CULVERT Reinf. Of Raft MR. ARINDAM SINHA 2-Dec-19 04:20 of widening type box culvert Concreting of widening type box 5733 TIPPLGRDJV/NH-31/STR/ 5854 30-Dec-19 562+405 LHS STRUCTURE CULVERT Concreting of raft MR. ARINDAM SINHA 2-Dec-19 04:20 culvert