gk= 500 kN qk=

pile size = 600 mm no of pile required =

Depth Interval Type of Soil N-Value Diameter k1 Nav As


0 0 Sandy SILT 0 0.8 1.70 0.00 0
1.5 1.5 Sandy SILT 2 0.8 1.70 1.00 3.768
3 1.5 Sandy SILT 3 0.8 1.70 2.50 3.768
4.5 1.5 Silty SAND 7 0.8 2.00 5.00 3.768
6 1.5 Sandy SILT 6 0.8 1.70 6.50 3.768
7.5 1.5 Fine SAND 11 0.8 2.00 8.50 3.768
70 kN P= 780 kN
no of pile required = 7 nos P on each p 111 kN

Qs ΣQs k2 Nb Ab (m^2) Qb Qu FOS Shaft FOS base


0.00 0.00 250 0 0.503 0.00 0.00 2 3
6.41 6.41 250 2 0.503 251.36 257.77 2 3
16.01 22.42 250 3 0.503 377.04 399.46 2 3
37.68 53.69 400 7 0.503 1407.62 1461.31 2 3
41.64 79.32 250 6 0.503 754.08 833.40 2 3
64.06 105.69 400 11 0.503 2211.97 2317.66 2 3
ΣQs/FOS Shaft Qb/FOS Base Qa
0.00 0.00 0.00
3.20 83.79 86.99
11.21 125.68 136.89
26.85 469.21 496.05
39.66 251.36 291.02
52.85 737.32 790.17
efficiency = 8990.00% 89.8
sumQu = 1645.1 kN

Qg(u) = 1477.3