You are on page 1of 56

Ateneo Main

Building Hazard
Map
Group 6
Kian P. De Asis
Mary Therese T. Paredes
2019
1946
1946
5
Levels
First Floor Second Floor
Materials
Materials
Canal/Ditch
Floor/Evacuation
Plan
Assembly
Area:
Ignatian Park

Assembly Area: Assembly Area:


In front of Xavier Hall In front of Christ the King Church
Emergency Systems
14
Emergency Lights
Fire Extinguishers

17
18
Guides
19
20
Fire Alarm System

21
Hazards
🏰

Physical Hazards
🏰
Structure
25
26
27
Chemical Hazards
Maintenance
Closet
Construction
Materials
Biological Hazards
39
40
41
Fire
Flood
Man-made
Recommendations

53
Recommendations
◈ Renovate parts of the ◈ Addition of fire alarm
building : systems and fire
⬥ Conversion of extinguishers
wooden structures to ◈ Replacement of old fire
hollow blocks and extinguishers
cement or new wood
◈ proper covering of open
frames
circuits
⬥ Replacement of
broken wood floors ◈ Regular removal of
infestations
Recommendations
◈ Maintaining the plant life ◈ Proper disposal and
surrounding and located storage of chemicals and
on the building construction materials
◈ Maintaining the ◈ Proper protective gear
canal/ditch for construction workers
◈ Fixing wall cracks ◈ Placement of
◈ First-Aid kits in each Construction Perimeters
room
Recommendations
◈ Proper orientation of emergency procedures
◈ More safety posters per emergency system areas
◈ DRRR classes for students

56

You might also like