GOVERNMENT OF ANDHRA PRADESH
WATER RESOURCES (REFORMS)DEPARTMENT
Mano 018. Desert
Sib |WRET= Buldees” Aseociion of india (BA) = Execution af
construcion works Cetin darfeations nodiesions on
IFetuctone issued rogering contusion of the works creed
‘Sencloned and closing of bits ~ Rep.
Tet | TS RiNo, 206, WiRetorma) Oo dt. 1 8zOT
2. From the Chain, (AP Sat}, Buders Associaton of
Iria (BA) ropresenation et. 01.07.2010
3, Mom No, SoRBOOFMUVIR. VASDISO2010, France
L__ | pepe tawz0t0
A copy of the rotorence 34 cle io sent hrawit to al tho Chief Engincors of
‘Woler Resources Deparment of Andhva Pradesh and Spi. Canwristener, CADA
‘They are requested to Tol the Isbuctons issued vide mero at reference 3° cted
land furish the Repot lo the Government by 23.02. 2019 99 per the hnstuetone
tanlaned in para 4 ofthe Meme 3 ced immedctly without all
2 Thismey bo weaied as urgent
ADITVANATH DAS
SPECIAL CHIEF SECRETARY TO GOVERNMENT
10
‘The Chet Engineer, Hoot works FIP, Plavarartwo)
The Chit Enger North Coast iahepainam(e)
‘ie Chef Engineer GDS, owsiswerams)
‘The Chief Engiyeer, KOS, Veajawede(we).
‘Ths Chief Engineer. Projects, Ongolwe)
‘Tho Chief Engineer, TGF, Thiypalhitve)
‘The Ciel Englneet, Projects Kadspatwe)
‘The Cisef Engineer, Projets Kurnool)
Chis Enginear, ProjctsAnanthpur(we)
‘The Chef Enginoe, Minor iigation, Viaystaca(we)
“The Chef Engheer, Hycology Viajewadates)
ine Chief Engineer, NSP, Guniurte)
‘The Chief Engrreer, QC Anahra Region, Visyawadaiwe)
‘The Chief Engireer QC Rayalasgoma Rion, Viayawadawe)
‘The Special Coramissionet,
Gammana Area Development Auhodly(CADA), Viayandatve)
cl Copy of reference a ted
Copy teh Enger in Chit (AWD, WRD, Viaysueda &
ginger in Chief (W), Cuteney Nagar, Viayawada
‘orinformation & Necessary acon
HEORWARDED BY:ORDER!
‘OFFICE OF Ce eNGWEER Mitton AnD MEDIUM IRRIGATION, AYAWAt Soto
AMESPCTION OFFICER
‘Endi0CE:1/012/13 Continuation of Works DT:1§ 08.2019
(Copy ofthe Government mera along vith the enclosures forwarded t all Superintending Fgheers ofthis
Ut fr information and necessary actin,
hie Engineer, tins ard Medium Iigation
ee
Fst ron a Ne Rin‘GOVERNMENT OF ANDHRA PRADESIL
FINANCE (FMU-WR.I) DEPARTMENT
Mes /BMU-WR.1/ASD/80/2019 Datet18,09.2
Sub:-Finance Department — Certain clarifications /modifcations on
instructions issued rogerding continuation of the works already
sanctioned and clearing of Bila Reg
Ro- 1, UO, Note No.FMUOASDYWRI}/80/2019{Comp.No. 898809),
dated 29.05.2019.
2, file No.ICDO1-COOROMISC/40/2019, from Water Resource
Departunent.
3. File No.985769/DIR-DWA/12/78/2019 , from Director of
‘Worles& Accounts
In the U.0.Note I*eited, all the Departments are advived to take action
28 follows:
‘2 Work sanctioned prior to 01.04.2019 but not rounded are canceled
2. Werks grounded but expenditure i lens thar 25% of originally estimated
tle shall be redler afresh. No paymant wll be done inthis regard
before obtains orders afresh from appropriate authorities.
2. Consequently, the Water Resources Department & the Director of Works
& Accounts have requested for certain clarifications regarding the
‘mmplementation ofthe U0, Note Ieited,
3. After casoful examination, with reference to the U.O. Note Ielted, the
[bowing carifeations/modieatons are bereby iaaed regarding
continuation of the works already sanctioned and clesring of the pending
‘alae
|) “The progress ofthe works aball be reckoned, with reference to the
‘agreement value of each agreemtent entered into by the Department
with the Agency.
fi) For reckoning the progress of work, the billed amount as on 29-05. |
2019, wailable at the Pay & Accounts Officer / Asst. Pay &
‘Accounts Officer, shall be considered.
Fil, The componente relating tg RAR wd Land Acquisition, W any, ace
ta be excluded, for the purpove of estimating the progress of the
work,
‘All works, exceptBAP/NABARD/CSS, sanctioned prior to 01-04
2019, but not roundedshall stand cancelled.
+The following works and payments are exempted from the purvicw
of U0. Note ete
4) All R&R works and Land Acquisition Bills,
]Works under NABARD/CSS not grounded, with agreement
Yale below f-10 Crores
@)All works grounded, having agreement value below Ra.10.00
(Contt..2)
-2-vv) The following works, shall be initially reviewed in detail at the
Departmental level then refer to the Minlster for Finance for
facearaing clearance:
9] Works undor EAP not grounded.
1) Works Under NABARD/CSS not grounded, with agreement
value above Re, 10 Croce
| Works under EAP/NABARD/CSS grounded, with aureement
Value above Rs-10 Crore but expenaitare lees than 25% of
‘agreement value
‘l) The review at departmental level shall cover the following:
‘a) Scrutiny of correctness of estimate
1) Aspects related to single bids.
6}. Aspects related to high tender premium,
ff} Granting of exemptions during the bid procens
1} In teapect of works tinder EAP/NABAKD/CSS not grounded,
the relevance of the works in the present context
4. The proposals forthe works mentioned at pare (vi) supra, shall be sent
to the Finance Department grant-wise & workwiso, through the concerned
falminietrative department, with specific remarks/fecommendations of the
‘Secretary concerned latest by 25-9. 2019.
5. W may be particularly noted ty all the Departments, that all the
Cxemptions mentioned at Para 3 above sre subject to ensuring strict
‘adherence to the FREM norms.
6, All the Departments of Secretariat/tead of Departments/Direetor of
orks & Accounts shall take necessnry action an per the above clarifications
SHAMSHER GINGH RAWAT
[PRINCIPAL FINANCE SECRETARY
te
Al the Administrative Departments of Secretariat, AP. Amaravat.
‘Al the Heads of Departments.
‘The Dieetor of Worle and Accounts, Andhra Pradesh, Morahimpetnam,
The Director of Trensurles te Accounts, AP. Ibrahismpatars,
‘The Pay and Accounts Offcer, AP. tbrahimpatnam,
Copy to:
‘The OSD to the Hon'ble M(Pindnce),A.P, Amaravati
‘The PS. to Chief Seeretary to Government.
‘The Chief Advisor to CM.
‘The Additonal Chief Secretary fo CM.
‘The Seoretary to CM
Ill Oficers in Finance Department.
s/PORWARDED =: BY ORDER // VS lok Alents