CHECK LIST FOR BLO

Project Name:
Architectural dwg rev no with date:

Block/Flate Details

Date:

S.No PARTICULARS
1 Cleaning of entire Flat before starting masonry marking

2 Dimensions & right angle of room(after marking)

3 Sill level and lintel level marked on the column


External wall features windows,Doors& Ventilators check with
4
architectural drawing
5 First layer of brick work completed and cheked

6 Horizontal & vertical alignment of brick work

7 Mortar mix ratio

8 Bricks pre wetting

9 Window sill crete - Reinforcement & Concrete

10 A/C sill crete -Reinforcement & Concrete


4.5" wall 3' level sill crete-Reinforcement & Concrete, in through
11
still concrete at 3" level for 4 1/2"brickwall
12 Lintel loft -Reinforcement & Concrete

13 At 7' level through sill concrete at 3" level for 4 1/2"

14 Brick work pointing on both sides(v Groove)

15 R.C.C Surface hacked (Coloum & Beam bottom)


SITE ENGINEER'S SIGN

Date:
CHECK LIST FOR BLOCK/BRICKWORK

YES NO REMARKS