You are on page 1of 38
STANDARISASI ANALISA HARGA SATUAN PEKERJAAN UNTUK PEKERJAAN DRAINASE DAN PENGEBORAN PEMERINTAH KOTA SEMARANG 2, Mandor iB ean = PERALTA D arih (ArB+0) E [Overhead & Proft x [Marga Satuan Pekerjaan (0+) 3735.00} 5 Jenls Pekerjaan —:Pembersthan dan striping/kosrekan Pokerjaan m2. Tura Wo Uraian Kode | sauan | Koefsien | Harga Satuan Harga E (Ro) (Ro) lpekeria o | -o .06a| 55,000.00 3,300.00, andor ola .006{ 89,000.00. 480 SULA HARK, 3790.00, 3 Baran SUMIAH HARGA BH = CT TRERALATANT TORCH HARGA AAT z B pariah (AB+0) T7800, E [Overnead & Prof : (mx 378.00 [Marga Satuan Pekerjzan (D+) 158.00 B. PEKERIAAN TANAH 1 Jens Pekerjaan Gallan tanah biasa dibuang di sekitar lokasi proyek (mekanis) Pekerjaan m3 Varga Satuan | Juma Uralan de |Satuan] Koefsien | "ron St ra = = Lor 319.00 Mandor Los 132.00 31.00 saa © PERALATAN == sy [1 Excavator 60-140 HP £3 | jam 73.38 2. At fant E45 | set ‘300.00 5,043.38 | D pariah (ArB+O) 897438 [Overnead & Prof B74) {Marga Satuan Pekerjaan (D+) 3321.00, 2 JenisPekeriaan Satuan Pekerjaan GGalian tanah bioss eecintam s, Tumis (ABC) loverhead & Profe Marga Satuan Peker jaan (0+) 3. Jenis Pekerjaan Satuan Pokeriggn Uraian Kode THUR 1 Pekera ae 2}Tukang Batu = 3} Tara z ala Boanan 1Batu telah (erry - lokas!pekerisan) 2 cn mn (aya peer) Slportand cemant CTA aS = | Tooncrte mer 350. ent 1529701 “UMLATTHARGA ALAT | 15128701 Pariah (FBC) 7: E lOveread & Prete xa 70 £ [Heras Sotuan Pekeraan (0+) 357,564.00 Jens Pekeraan Pasangan batu belah 1 PC: 5 PP, dengan material btu belah bekas bongkaran ,Satuan Pekerizan me Targa Satuan | Damian Uraian re ARCATA = eae 7 = 35,0000 | 148 50.00 | 2}Tukang Bats 79,900.00 | 63,000.00 3]kepaa Tung — - = an 00.00 7,200.00 alMandor 80,009.00 | 23,600.00 | “TERAGA KERIA | 740,300.00 | ahaa pace pasang muntlon (quareiolastpeeraar) 260,000.00| vai 0.00 2] porn cement. 1,350.00 | 182,250.00 TARGA BATAR | “35535606 CTA 5 sad Concrete mer 3507 En 367] a3 538.00 |i 3a7 01 SUMUAR FARGA ALAT | 15,267.01 D Pariah (RvB) [agro E JOvernend 8 Prote (exo F _|Harga Satuan Pokerjaan (D+) 637,204.00 | Jens Pekeriaan :Bongkar pasangan batu bata Savon Petarigon Samia Uraian — "AERA OA— | 1Pekerja sna 33,000.00 andor 400.00 37.8000 Bpbanan TRA = [PRAT a fPatw/Geder (Baia Keres) | ‘p50| 25,500.00 2lPahot Beton (Sa kes) 0.4201 15,000.00 “UMLAR HARGA AAT ‘D Pumiah (A+B+C) E JOverhead & Profit ex F_|Harga Satuan Pekerjean (D+E) jaan (RFC) ‘overhead & Profit Haraa Satuan Pekerian (O+E) mo] 338,500.00, 2,880.00 311,680.00 Jens Pekerjaan Satuan Pekerjean io : Pasangan batu bata dengan campurat FTENAGA KER keri a] il 2FTukang Batu 3[Kepele Tukang al [Mandor Bahan ata merah 5 x11 x 22 em 2[Portiend coment 3] Past pasang muntilan (quarry okasl pekejaan) | C.[PERALATAN, [iumiah (A816) loverhead & Proft fmol [Tukeng Bat IKepala Tukang Mando [Bahan ibsta mera Skitxaegn Portona. 7 2 3 cement [Pasir pasang muntian (quarylokasi pekeraan) SUNLAH HARGA AAT : D pariah (AFE+C) FELIS Joverhoad & Proft XD 78,115.00 F_|Harga Sotuan Pekerjaan (O+E) 59,265.00 Pasangan bat bata dengan campuran 1 PC: 6 PP Uralan Kode |Satuan] Koefisien | Marga Setuan | Jumiah | oH 2400) $5,000.00 ou 4.200 [on ot biah tg ™ ‘CTPERALATAN, a SOLAR ARG AAT = D pariah (R850) TESS E Overhead & Proft (axe 78,305.00, £_lHarae Setuan Pekerigan (D+E) 351,355.00 PEKERZAAN CERUCUK JenisPekerjaan—Cerucuk kayu/dotken diameter 8 cm ~ 40 cm Sauan Pekergan im Targa Setuan | Sumiah Uralan Kode [Satuan] Koefision rem [TENAGA KERR [Peter 7 a | 55,0006 TBO [Tukang Batu - 0.003 | 70,000.00 210.00 anda 10.005_[ 86,000.00, 400.00 (TH HAGA TENG KERIA 260.00 [B]panan a ‘[Doken keys gala 6 6-10 an, pig 3 M75 | bata 0:35| 79,500.00 | 10,325.00 [UMLAH FARGA BAHAN 10 325.00 [PERATATAR {ftipod tngals m_ 78 | tan | alAiat pancang Hammer 0.5 fon E79 | hari 1.013] 350,000.00 4550.00 TUMUAH RGA ALAT | 10,900.00 D Pauiah (Bo) E Jovernead & Profit (HexD £ |iarg setuan Pokeraan (0+6) 723.00 Jens Pekeraan Cerucuk bambu dlameter 10 em in Pekerfgan im? rf ail Warga Satuan | __Sumlah Uraian Kode | Satuan] Koefisien A FTENAGA KEROA_—— alee |" i]Pekeria Lot_|on 55,000.00, 3,360.00, 2}Mandor Loa | OH $0,000.00, 320.00 ‘loperator at barat Los | oH 170,000.00 1,020.00 SUPTAR ARCA TERAGA RERA 3,320.00 [E[eahan 1 [Bambu censcuk 6-10 cn panfang 600 an M77 | batang | 0.175| 27,500.00 S20 JUMLAH TARGA BAHAY 4812350 CPERATATAN S sa Z _ifipod nga Sm - a Tae 006| 250,000.00 | 1500.00 2a Hammer 0:5 ton £79 | hast 4.006] 350,000.00 2,100.00 [Asst pemyembung tana pancena dikes E79 | tari | 6.0025] 350,000.00 875,00 SUMLAT HARGA LAT 7,475.00 Punian (eB) 72,607.50 E [Overseas a Prote io 3,260.75 F Jsarga Satuan Pekerjgan (0+) 75,368.00 arpa Satuan | — Suma ode [Satuan] Koetsion {Rp.) 480.) bor 0.036 55,000.00 1,980.00 oa ry Co. m8 7437.50 733730 Ee 3,250.00 En S.1st.00 E79 ‘7500 E2750 7035 76.7350 denis ekeraan :Plesteran tebal 15 cm, dengan campuran 1 PC:S PP (Satuan Pekerjaan _: m2 Tania Uralan Kode | Setuan ey — Loi | OH 21,120.00 frsang Bats oze"| ow 1340.00, 03 | 0H 152000 cos [oH 3 3120.00 Bahan 7 Pas rasang muna (aaroka parany | W228 | me 70005 [Portland cement. M883 | _ kg ‘CPERALATAN 1D [aumiah (A+B+C) Tae overeat a Prete [781.76] £ [Harge SatuanPekeraan (O+E) —— JenisPekeyaan__:Plesterantebal 1.5 em, dengan campuran 1 PC:4 PP Satan Pekerjean m2 Uratan Kode [Satuan] Koetiaien | Hergs Setuan [Juma x Se 1| ~~ — ~ [cor | “on | 03ea] 55,000.00 | 24,120.00 2] a ‘Loza | “OH 0.192| 70,000.00, 13,440.00 3 03 [On| aor5] 0.00.00 |~ al Lot [of | oozal 90,000.00 ILAH HARGA TENAGA KERJA BiB ah: a easel 1 Pasir pasang muntilan (quarry-lokasi pekerjaan) orn emer ae RATER 5 5 Pumibk BO) S00 E Overhead & Profit (Go%xd 5,383.80, = [Herg Sotwan Pekerjoan (O+E) $221.00 JenisPekeran = Slaran dengan campuran 1 PC: 3 PP ‘SatuanPokergen m2 Uraten [Pasir pasang muntan (quar oka pekerjaai) 2JPontand cement [PERALATAN J = D paumiah (ABC) E [Overhead & Proft ie 4,264.40, E |arga Satuan Pekertaan (O+E) 6,308.00 17, Jenis Pekertaan Satuan Pekeriaan Harga Satwan | Jumlah Kode | Satuan] Koefision an ‘ Upah Tenaga era Loe [on | a.i00. Sumiah Rarga Upan 79,500.00. Beanan = 4. Portand cement 4.983 | ig [3.3500 7350.00 43758 urna Haga Baha 41387 50 a T ‘Juri Haraa Peralatan 2 B Pariah (ABO) BoD E [overhead & Proft (exe 398. E |Harga Satuan Peterizan (O+E) 26,386. G. PEKERJAAN BETON ‘Beton mutu, fe = 7,4 MPa (K100), slump (122) em, w/e = 0,87 Koefisien | Marga Satuan | 3umiah <0.) | _(Rp.)__| 1323] $8,000.00 0.169) 00 -0.019| 80,000.00 0.33 80,000.00 JNIAH HARGA TENAGA KERJA 247.000) 4,350.00 0 302,400.00, 0740] 28.000) 157.00 TOMTAH ARCA BAAN, — 91,538.00 | fam TARGA ALAT. B pariah (ArBC) E |Overtead & Prof (ex 85,910.52 F [Marga Satuan Pekerjaan (D+E) 345,015.00 | Jens Pekerjaan ‘Beton mutu, fc = 14,5 MPa (K175), slump (1222) em, w/e = 0,66 Satuan Pekorigan _: m3. = Wiarga Satuan | Sur Kode | Satuan| Koefsien | Harve St | ATTENAGA KEDA ne i 1 ]Pekerja Loi_| oF i 35,000.00 765.00 frutang Batu Loze | “oH |. "70,000.00 | $3,230.00 '3)Xepaia Tukang Los _| oH, ‘0.019 80,000.00 | 4,520.00 | ‘alendor Los [ on 10.132] 60,000.00 30,560.00 LAH HARGA TENAGA KERUA 96,075.00 BBanan ‘jporiand cement —— ~ mass | ig [-2}Pasiebeton mu |e 5 }eatu pecan = 20 | 4 Cpe “i fconerete noes 350 ent | an ‘D lumiah (A+B+C) E [Overhead & Prot £ [Harga Sauan Pekeraan (O¥€) Jens Pekerfaan: Beton mutu, Fe = 19,3 MPa (K225), slump (122) em, w/e = 0,58 Satuan Pekeraan m3 Targa Satuan | Sumiah Uralan Kode | Satuan | Koefisien (Ro) | (Rod TK [TENAGA KERGA = = a 1ekena ~ “2 1323] $5,000.00] 72,768.00 | |-2}Tukang Bats [on | o.1e9t 7,000.00 | 13,230.00 | 3]kenaleTulang a ~oH |" — oats] 80,000.00 1,520.00 4|Mandor_ ‘OH 0.133 80,000.00 10,560.00 (AT HARGA TENAGA KERIA_| 95,075.00 B]sahan 1) Portiand cement. nani kg__| 371.000} 1,350.00 500,850.00 ‘2|Pasr beton 698.000] 213.00] 148,674.00. +3|Batu pecah 1047.00] 3. . la, 215.000 “JUMLAH HARGA BARAN [875,209.00 PeuLaTAN a i i Concrete miner 3500 ei | am 025] sissa00 | 2875 SORTA FORA AAT 22,808.75 > Pama BID 396,368.75 |Overhead & Profit (oexd 99,618.88. £ |Worga Satuan Pekeriaan (0+) 17095,807.00 JenisPekeraan Beton Struktur K-175 Ready Mbx Satuan Peteraan mt Uraian Koefisien | Marga Satuan ATENAGAKERA = = 1, Pekera = ‘oH | o.a569 | 35,000.00 | — 2. Tukang Bats - “ort_| 0.2076 | 70/0000 | 3. Mandor on] 055 36,416.00 IMA ENAGA | ‘55,477.50. [Bahan = 1 Adan bton K-17 wey M50 | 738,750.00 | 708,078. TARGA Baranl 783,075.00 E17 | jam _| ‘52,126.00 | 2,965.57, E45 | et 50,000.00 5,000.00 FTFURGA AAT. 7,965.97 D paman Be E [Overhead & Prot (med aes. 5 [Harga Satan Petersen (O¥€) 351,170.00 Jnis Pekerjian: Beton Struktur K-200 Ready Mix Satuan Peleraan m2 Uralan Kode | Satuan| Koefisien | H2rga Satuan | 3umlah TERRE = 3 Peter a 2. Tukang Batu 0| 3, Mandor ‘0.4552 | a0,000,00 | 36,416.00 TARGA TENAGA KERR | 55,477.50 eahan 1, Adskan bekon K-20 ready mic Maat | a 1,666.00 | 617,965: “OMIA HARGA GAHAN] 617,965.96 CRA = T Conerete vibrator Tis | Seo 96597 ‘Abt bart 0.1000 | 50,000.00 500.00 JUMLAT HARGA ALAT 7965.97 ‘D Pumiah (A+B+C) 681,409.43. E [overeac & Pront iow KD £ [Horga Souan Pekeroan (O+€) {es 6 Jens Pekeraan Beton Struktur K-225 Ready Mix SatuonPeteriasn m2 Uratan Kode Ed | oa | A TENRGR ERA Ft 7 a. Feteria Lot 312850 2. Tukang Batu Lites [5952.00 3. Mander Loe i 35,477.50 Tan = : ‘Adan baton K-25 reody mix ma 28,360.00 £28,380.00 | & PERALATAN | Concrete vibrator = Ev 365.57 2. Ala bons £45 5,000.00 7,365.57 D Pamian (Bea) BLs47 E [Overhead & Prot 89,185.35 E |harga StuanPokerjean (0+) 351,016.00 7 Jens Pekerjaan = Beton Struktur K-250 Ready Mix SntuonFeteraan > igen Satuan | Koetsien | Haraa Satuan | Sumlah tea.) _|__¢Re__| TENA KEROA = 3108.50 2 Tukang Bail — 35932.00 3. Mandor 38,416.00, 35,477.50 [BBanan = 1 Aa ion R50 rea was | “ms _| oan | aos. 750.00 | 954,055 00 © PERALATAN D paamiah (A840) oi753847 E Overhead & Prof (oe 91,7531 F |waraa Satuan Pekerigan (O+E) 7,009,292.00 8 Jeni Pekerfaan Beton Struktur K-275 Ready Mix re Warga Satuan | Jurlah larga Satuan | Suri Uralan ode [setuan] Koersien | Horan St iat 7K TENAGA KEDA ale |e 1 Pekeria Lor | ow | 00588 | $5,000.00, 31550 | _2: Tukana Batu toa | on | 02276) 70,000.00 15,832.00, Mandor Los [oH [0.45521 60,000.00 36,416.00 i TENAGA KERIA. 55,477.50 B Bahan 1. Adukan Beton K-275 ready mb +0600 | ~~ 333,000.00 | 982,580.00 TJUMLAT HARGA BANAN| 82,980.00 CPERALATAN z 1. Concrete vibrat = a5 jam_| 0.0569 | 52,326.00 965.97 2. lat bantu set_[- 0.1000 | 50,000.00 000.00 JUMLAH HARGA ALAT [7,965.97 | D Plumiah (ABO) 6403.47 [Overhead & Proft exo 94,642.35 F |araa Satuan Peteriaan (0+6) 08,068.00 halaman 14 9 10 a Jens Pekerjoan —:- Beton Struktur K-300 Ready Mix ruanPekergon mt Uraian Kode Koefisien di | A TENG KER 1. Peters 35,000.00 [2 Tokay aby 7,900.00 | 3. Mandor 80,000.00 TENAGA KERJA Ebahen |__1. Adukan Beton F300 ready mix “Logoo | 63,500.00 an. SUMLAT HARGA PERALATAN— 1. Concrete vibrator ‘0.0568 | 32,136.00 365.97 2: Alt ants 10.1000 | —~50/000.00 5,000.00 D pumian Ba) E [Overhead & Prot [Marga Satuan Pekerzan (0+) 708958. Jes Pekersan Beton Struktur K-350 Ready Mbx SatuonPeteren _:_m™ ra ‘arga Satuan | Jura u Kode Koetsien | Hara z TTA RE Se een 1, Poeera Lor | on | — 0.0569. | 55,000.00 312550 2. Tukang = ‘Loza | on | 0.3414 | 70,000.00 | 23,886.00 3. Mandor 30,000.00 | 58,616.00 : (TH HARGA TENA KERIA_|"—B,643 50 an 1, Advan elon 350 ready 4.0600 | 910,000.00 | 964,e00.00 SUMLATT RARGA Balai] ——969,60.00 CPERALATAN 1. Concrete vibrator Ey 005m | sz iz600 | 3865.57 At bantu E45 9.1900 | 50,000.00 5,000.00 SUMLAT PRGA ALA 796597 B Pnlah (asB+C) 704,209.47 E Overhead & Prot ax 105 420.95, F |Harga Satuan Pekeriaan (+E) _ 759,630.00, JenisPokeran Beton Struktur K-400 Ready Mix SatuanPekeraan 2m Paina Warga Satuan | Surah Urai Kode oetisien | Hara St — TRACE RERIA 1, Pekers 0.0589 | $5,000.00 | 3,128.50 2: Tukang Batu La2a 0.3963 | ~~70,000.00 | 278. 3: Mandor Lo 0.7965 | au00.00 | 63,720.00 THUR HARGA TERGA KERJA | 94,790.50 BBahan aera = 1. Adukonbeten 1300 ready ib 5.0600 | 951,250.00, TARGA BAAN = 52.2600 AAT D arian (ABO) Ti021.47 E [Overhead Prot i 1110 £[Harga Satan Pekeraan (048) 222,123.00 | 120 nis Pekerjaan:-Pembesian dengan bes! polos U24 dan U32 ullr Satuan Pekerjaan_:_m? Uretan Satuan] Koefsien | MarGa Satuan | Sumiah 2 0. FTENAGA ERA ue Pexena on 0700) 55,000.00 | 3,500.00 frukana Bes oH 0700] 70,000.00} 49,000.00 Ikepa Tukang | oH | 0.070) 0,000.00 5,600.00 amish (ArS#o) Harae per 100 Kg TO73,535.00 E [Hara per ko [ "10,735.95 F Overhead & Prof Goexo 1073.60] orga Sauan Pekeraan (E+) 11,309.00 113 Jenis Pekerjaan Bekisting untuk permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa perancah) Setuon Pekan Uraian Koefisien | Harga Satuan | Jumiah (po) | “ep frre] [aumiah (ABC) loverhead & Profit an Pekerjsan (DE) 14 Jenis Pekeriaan —:_Bekisting untuk permukaan beton expose den: Kayu Sengon (balok) (tanpa perancah) Setuan Pekeriaan m2. Satuan [TENAGA KEDA & I 2) — Bahan [Mutttek tebal 28 mim {Kavu Sengon (bel) Paku Pumian (AsB+C) [overhead & Profit IHarga Satuan Paerjzan (D-+E) 16 Setuan Pekerjaan_:_ me Perancah untuk beton denaan ketinaalan*/. 5 m Harga Satuan | 3umiah Uraian Kode | Satuan| Koefisien | Herge Set ae “ATENAGA KERR lee 1 Pekeria Tor [OF 1.2000 | ~~ ~55;000.00 | 66,000.00 D Ppumiah (A+B C) 75625000 E [Overhead & Profit (ax 175,825.00. £ [Marga Satuan Pokerjzan (D+) 1,934,075.00 Jenis Pekerjzen —:Perancah beton ketinggian >: Satuan Pekerjsan__:_ mi Uraian KTENAGA ERA 4. Pokeria 3. Mandor [2 Tukang Batu EBanan Pura (aeB=C) Jovernead a Prot Iarga Satuan Pekeriaan (046) 103,475.00 Jen is Pekeriaan :_Bongkar Beton secara konvensional Satuan Pokerjaan Koefisien Tamia (.) RERA Pekeria andor 345,750.00 | 0 Bahan [cura bib PERALATAN |Paly/Godam (Baja Keras) |Geraat Best [Panat Beton (Baja Keras) mniah {A¥B+-C) loverhead & Prot Harga Satuan Pekeraan (O-+E) 79,650.00, 18,965.00 208,615.00, Jens Pekerjzan Bongkar beton dengan Jack Hammer Setuan Pekeriaan m3, aia Harga Satuan | Sumlah Urala Kode | Satuan] Koefisien re 7] ER : cf 3fPekera Loi | OW ‘900 $5,000.00, 49,500.00 [Mandor on 40,000.00 | 29,500.00 | © [PERALTA deck hammer 2{Palu/Godom (Baja Keres) 3|eraaj Bes | 5s 4[Pahat Boton (aia keras) — "3,000.00 771456. 1B uriah (ABC) Too 214.56 E [Overhead & Proft 10,021.46, F [orga Satuan Pekerjaan (O+E) 110,236.00 | denis Pekergan —Kistdam kedalaman 3-2 m Setuan Pokerjaan__:_mt 03200. 0.0800 0.0400 umieh, 4.0000. 2 “Tanah basa (quarry - loasl pakerjaan) m_| 1.0000 +3. Bambu © 10 cm panjang 600 cm [1 2.0000 3 Karung plastic 30.0000 Pera [2 Ame bangs eas | set | 0000. a D Pariah Bao) E [Overtead a Prone [Marga Stuen Pekeroan (O+E) JenisPetersan = Kistdam kedalaman 2-3 m

You might also like