ASSIGNED WORK STAT

SL DESCRIPTION
NO
1 Boiler Front area cementing completed. Room plastering and area near ID fan pending
2 Store room door finished RM godown and flaker framework done. Sheet work pending.
3 scrapyard pending but will be completed along with the cementing works.
4 Both the aging room and cake room are erected. Quotation of the door taken.
5 Blender - installation & commissioning
6 Lightining strip for chimmeny pending
7 Condensative steam pipe line extension from extractor area
8 Removal of product room windows planned along with the blender installation.
9 Restroom and canteen
10 New Tyres for trailer
11 cooling tower basin leak - water proofing of basin Planned in shut down
12 Reflex level gauge & panel for boiler
13 Insulation for gas inlet pipeline from evaporator to condenser asbetos sheet
14 Centrifuge - partition with polycarbonate sheet on frame
15 Fly catcher installation on west side columns of main plant
floor tiling for sanitation room and toilet
16
17 Workshop - shed & flooring
18 Softner valve replacement and testing , repair of the existing valve
19 Samples of oil in transformer for testing
20 Replacement of cooling water line to lab
21 Diversion of cooling water outlet to earthpit
22 process water connection to lab condenser in place of cooling water
23 Excavation and civil Foundation for NE plant
24 Excavation and civil foundation for pipe rack to NE plant
25 Screw conveyor for spent feed in boiler
26 Modification of Feed pipe in boiler to accommodate the screw feeder
27 Relocation of FD fan of boiler for screw conveyor
28 Final product screw feeder - from blender to vibrating screen
29 Boiler stand for cleaning
ASSIGNED WORK STATUS
palned on finished on ASSIGNED TO
13/Nov
13/Nov
13/Nov
13/Nov 17/Nov
13/Nov
13/Nov binu
13/Nov vinoy
13/Nov
13/Nov
13/Nov Viji
13/Nov vinoy
13/Nov Hitz
13/Nov 14/Nov vinoy
13/Nov binu
13/Nov 17/Nov ramraj
13/Nov vinoy
13/Nov
13/Nov 19/Nov
13/Nov ramraj
13/Nov 13/Nov
13/Nov 13/Nov
13/Nov 14/Nov
13/Nov 17/Nov
13/Nov
13/Nov
13/Nov vinoy
13/Nov
13/Nov
13/Nov vinoy
REMARKS
Under construction
Under construction
in progress
given to nagaraj fro 13k

During shutdown

To be planned during shutdown

Under construction
water hardness 20 ppm
During shutdown

Trial run completed on 15-11 during boiler cleaning. Further modification required
DAILY WORK ENTRY
SL NO DESCRIPTION DATE
1 Material purchase for washing area 01/Nov
2 EFP-1 pump removed for maintenance 01/Nov
3 Washing area pipleline and basin fix 02/Nov
4 Went to hospital with hindi people 02/Nov
5 Went to hospital with hindi people 03/Nov
6 Automation of ETP final collection tank 04/Nov
7 EFP-1 taken to uthukottai 05/Nov
8 Purchase in pichatur for paint 06/Nov
9 Guest house wiring work 06/Nov
10 Unloading and placement of FD fan 07/Nov
11 Removal of false ceiling in FP room 07/Nov
12 EFP -2 maintenace (sound) 08/Nov
13 Purchase in pichatur for insulation pipe for bore well motor 08/Nov
14 Demolition of FP room wall 08/Nov
15 EFP-1 Fixed 08/Nov
16 FP room finishing work 09/Nov
17 ID fan placement and alignment of motor 10/Nov
18 ID fan belt adjustment and pulley alignment 11/Nov
19 lab condensative water oulet modification to earth pit 11/Nov
20 New safety guard created for ID fan belt 12/Nov
21 Grass cutting behind boiler shed and fire pump 12/Nov
22 LAB water line modifictaion 13/Nov
23 Bore well motor line insulation 13/Nov
24 Removed chain block for maintenance 13/Nov
25 Motorised chain block hook changed 13/Nov
26 Grass cutting in transformer area 13/Nov
27 Condernsor- Evaporator pipe line insulation 14/Nov
28 Chain block maintenace done 14/Nov
29 Store arrangement 14/Nov
25 Boiler platform fabrication and cleaning test run 15/Nov
26 FD fan full removed and cleaned 15/Nov
27 Measurement for tiling area calculation 15/Nov
28 grass cutting ETP and Cooling tower area 15/Nov
29 went pichatur for repairing omini 15/Nov
30 Electrical layout planned for spider catcher 15/Nov
31 House keeping 16/Nov
32 Chain block maintenance 16/Nov
33 Purchase in puttur 16/Nov
34 Purchase in pichatur 16/Nov
35 Roller discharge platform modification 17/Nov
36 Office shoe rack assembly 17/Nov
37 Automated level senor connection disconted 17/Nov
38 Watering pump repair 17/Nov
39 Automated level sensor new wire layout done 18/Nov
40 Spider catcher wiring layout and welding work 18/Nov
41 vacuum recirculation pump dicharge connection 18/Nov
42
43
44
45
DAILY WORK ENTRY
WORKED BY REMARKS
Vinoy
Vinoy
Vinoy
Ramraj
Vinoy
Vinoy & Ramraj
Ramraj Repaired in uthukotai. Bearing replaced( motor side 6205-C 2Z & 6035 )
Vinoy
Ramraj
Vinoy
Vinoy
Vinoy & Ramraj spider changed L -95
Ramraj
Vinoy & Ramraj
Vinoy
Vinoy plastering and tile work
Vinoy
Vinoy
Vinoy
Vinoy
Vinoy
Vinoy & Ramraj
Vinoy & Ramraj
Vinoy & Ramraj
Vinoy
Vinoy & Ramraj
Vinoy & Ramraj
Vinoy & Ramraj
Vinoy & Ramraj
Vinoy
Ramraj
vinoy
Vinoy & Ramraj
Ramraj Spare not available
Ramraj
Vinoy half day ( chiller area .. and plant ouside )
Vinoy Chain drive
Ramraj courier from vijayalakshmi, cable from mahalakshmi
Ramraj sipder catcher electrical line layout
Vinoy Plastc bag hook modification
Vinoy
Vinoy
Vinoy
Ramraj 1.5 sq mm 3 core
Vinoy & Ramraj
Vinoy
SL NO DESCRIPTION ASSIGNED TO
1 Sent transformer oil sample during shutdown Ramraj
2 PUF covering for lab cylinders
3 Fix lath for office window
4 fix latch for store shutter
5 fix latch for toilets
6 Fix Flood light for security cabin
7 Tractor tyre fix
8 Workshop flooring
ID fan area flooring
ETP area Flooring
Fencing Work
Roller gate for 2nd entry
bird prevention rolls
re connection of bore well line
rain water chaneling from plant side
plastering of extractor side road
mechanical workshop plastering and room
TRolley Refabrication
Extractor net bend fixing
Pit line re fabrication
Boiler Plate fabrication
Flaker
CONTACTS NAME COMPANY AERA REMARKS
SURESH POWER TREK transformer
SL NO DESCRIPTION CONTACTS
1 Cooling tower scale prevention chemicals
2 Magnet certificate for ISO 04802732232
3 leveling of the extension area
4 Omini repair
5 buy zycosil for water proofing
6 Arrange multiport valve for softner
7 estimate for tiling
8 repiar hp printer
9 pressure and temperature gauge list for plant
10 Temperature gauge for maintenace list
11 Get spare list for manual Chain block
NAME COMPANY AERA

Vanaja sonex

Jaison & bijo


REMARKS

buy spare
follow up with ninu