You are on page 1of 34

PESHAWAR

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)


CLEAR CONC. COVER: 40 mm
REF. DWG NO: MMP-1020P01-BRT-ST-UP-335

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Bar # C/C (mm) Each bars

1 Bottom Main Bar of Base Slab #8 150 1 199 199

1 Bottom Main Bar of Base Slab #8 300 1 100 100

2 Top Main Bar of Base Slab #11 150 1 299 299


PESHAWAR

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)


CLEAR CONC. COVER: 40 mm
REF. DWG NO: MMP-1020P01-BRT-ST-UP-335

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Bar # C/C (mm) Each bars

Wall Outer Vertical Dowel


4 #11 150 1 200 200
Bars

Wall Inner Vertical Dowel Bars


3 #6 150 1 200 200

Wall Outer Vertical Lapping


4 #11 300 1 100 100
Bars

Wall inner Vertical Lapping


5 #6 150 1 200 200
Bars both sides
PESHAWAR

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)


CLEAR CONC. COVER: 40 mm
REF. DWG NO: MMP-1020P01-BRT-ST-UP-335

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Bar # C/C (mm) Each bars
Wall inner Vertical Lapping
5 #6 150 1 200 200
Bars both sides

Disst. Bars

6 Bottom slab (T/B) Bars #6 200 2 37 74

7 Wall Disst. Bar both wall. #6 150 2 57 114

Grand Total
PESHAWAR

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)


CLEAR CONC. COVER: 40 mm
REF. DWG NO: MMP-1020P01-BRT-ST-UP-335

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Bar # C/C (mm) Each bars

Grand Total

Weight Dia wise #3 #4 #5


Dia wise Total Steel for 30m - - -
PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:
LENGTH

Total Bend
in Total Nos Of Length of Bar in Bend Bend Deduction Weight P
Deduction Total length (m)
bars (m) No (m) Meter (Kg
(m)

199 8.400 2 0.020 0.040 1671.560 3.973

100 4.900 1 0.020 0.020 489.980 3.973

299 8.400 2 0.028 0.055 2511.545 7.907


PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:
LENGTH

Total Bend
in Total Nos Of Length of Bar in Bend Bend Deduction Weight P
Deduction Total length (m)
bars (m) No (m) Meter (Kg
(m)

200 6.000 1 0.028 0.028 1199.973 7.907

200 6.000 1 0.015 0.015 1199.985 2.235

100 6.000 1 0.028 0.028 599.973 7.907

200 4.600 1 0.015 0.015 919.985 2.235


PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:
LENGTH

Total Bend
in Total Nos Of Length of Bar in Bend Bend Deduction Weight P
Deduction Total length (m)
bars (m) No (m) Meter (Kg
(m)
200 4.600 1 0.015 0.015 919.985 2.235

74 32.400 0.015 0.000 2397.600 2.235

114 32.400 0.015 0.000 3693.600 2.235


PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:
LENGTH

Total Bend
in Total Nos Of Length of Bar in Bend Bend Deduction Weight P
Deduction Total length (m)
bars (m) No (m) Meter (Kg
(m)

#5 #6 #7 #8 #10 #11
- - 18,351.964 - 8,587.799 - 34,090.952
PESHAWA

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)

CLEAR CONC. COVER: 40 mm

REF. DWG NO: MMP-1020P01-BRT-ST-UP-328

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Bar # C/C (mm) Each bars

1 Bottom Main Bar of Base Slab #8 125 1 112 112

2 Top Main Bar of Base Slab #8 125 1 112 112

Bottom Main Bar of Base Slab


3 #8 125 1 39 39
Varies R/S
PESHAWA

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)

CLEAR CONC. COVER: 40 mm

REF. DWG NO: MMP-1020P01-BRT-ST-UP-328

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Bottom Main Bar of Base Slab Bar # C/C (mm) Each bars
3 #8 125 1 39 39
Varies R/S

Top Main Bar of Base Slab


4 #8 125 1 39 39
Varies R/S

Bottom Main Bar of Base Slab


5 #8 125 1 37 37
Varies L/S
PESHAWA

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)

CLEAR CONC. COVER: 40 mm

REF. DWG NO: MMP-1020P01-BRT-ST-UP-328

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Bar # C/C (mm) Each bars

Top Main Bar of Base Slab


6 #8 125 1 37 37
Varies L/S

Bottom Main Bar of Base Slab


7 #8 125 1 5 5
Varies D Section
PESHAWA

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)

CLEAR CONC. COVER: 40 mm

REF. DWG NO: MMP-1020P01-BRT-ST-UP-328

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Bar # C/C (mm) Each bars

Top Main Bar of Base Slab


8 #8 125 1 5 5
Varies D Section

Wall Outer Vertical Dowel


9 #11 225 1 145 145
Bars V Section

Wall Inner Vertical Dowel Bars


10 #11 225 1 120 120
V Section
PESHAWA

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)

CLEAR CONC. COVER: 40 mm

REF. DWG NO: MMP-1020P01-BRT-ST-UP-328

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Wall Inner Vertical Dowel Bars Bar # C/C (mm) Each bars
10 #11 225 1 120 120
V Section

Wall Outer Vertical Lapping


11 #11 225 1 145 145
Bars V Section

Wall Inner Vertical Lapping


12 #11 225 1 120 120
Bars V Section

Wall Both Sides Inner/Outer


13 #8 125 4 155 620
Vertical Dowel Bars
PESHAWA

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)

CLEAR CONC. COVER: 40 mm

REF. DWG NO: MMP-1020P01-BRT-ST-UP-328

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Wall Both Sides Inner/Outer Bar # C/C (mm) Each bars
13 #8 125 4 155 620
Vertical Dowel Bars

Wall Both Sides Inner/Outer


14 #8 125 4 155 620
Vertical Lapping Bars
PESHAWA

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)

CLEAR CONC. COVER: 40 mm

REF. DWG NO: MMP-1020P01-BRT-ST-UP-328

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Bar # C/C (mm) Each bars

Disst. Bars

15 Bottom slab (T/B) Bars #6 125 2 195 390

Bottom slab (T/B) Bars R/S


16 #6 125 2 17 34
Corner

Bottom slab (T/B) Bars L/S


17 #6 125 2 24 48
Corner
PESHAWA

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)

CLEAR CONC. COVER: 40 mm

REF. DWG NO: MMP-1020P01-BRT-ST-UP-328

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Bottom slab (T/B) Bars L/S Bar # C/C (mm) Each bars
17 #6 125 2 24 48
Corner

18 Wall Both side Outer #6 150 4 37 148

Wall Outer Bars At V Section


19 #6 150 1 37 37
R/S

Wall Outer Bars At V Section


20 #6 150 1 37 37
L/S
PESHAWA

CONTRACTOR : CR21G-MAQBOOL-CALSONS (JV)

CLEAR CONC. COVER: 40 mm

REF. DWG NO: MMP-1020P01-BRT-ST-UP-328

Dia of Spacing Nos of Bar in Total Nos Of


SR.NO Description Nos
Wall Outer Bars At V Section Bar # C/C (mm) Each bars
20 #6 150 1 37 37
L/S

21 Wall Inner Bars At V Section #6 150 2 37 74

Grand Total

Weight Dia wise #3 #4 #5


Dia wise Total Steel - - -
PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:

LENGTH

Total Bend
Total Nos Of Length of Bar in Bend Bend Deduction Weight Per
Deduction Total length (m)
bars (m) No (m) Meter (Kgs)
(m)

112 28.955 2 0.020 0.040 3242.920 3.973

112 28.955 2 0.020 0.040 3242.920 3.973

39 7.050 2 0.020 0.040 274.910 3.973


PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:

LENGTH

Total Bend
Total Nos Of Length of Bar in Bend Bend Deduction Weight Per
Deduction Total length (m)
bars (m) No (m) Meter (Kgs)
39 7.050 2 0.020 (m)
0.040 274.910 3.973

39 7.050 2 0.020 0.040 274.910 3.973

37 7.050 2 0.020 0.040 260.810 3.973


PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:

LENGTH

Total Bend
Total Nos Of Length of Bar in Bend Bend Deduction Weight Per
Deduction Total length (m)
bars (m) No (m) Meter (Kgs)
(m)

37 7.050 2 0.020 0.040 260.810 3.973

5 10.827 2 0.020 0.040 54.095 3.973


PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:

LENGTH

Total Bend
Total Nos Of Length of Bar in Bend Bend Deduction Weight Per
Deduction Total length (m)
bars (m) No (m) Meter (Kgs)
(m)

5 10.827 2 0.020 0.040 54.095 3.973

145 2.260 1 0.028 0.028 327.673 7.907

120 2.260 1 0.028 0.028 271.173 7.907


PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:

LENGTH

Total Bend
Total Nos Of Length of Bar in Bend Bend Deduction Weight Per
Deduction Total length (m)
bars (m) No (m) Meter (Kgs)
120 2.260 1 0.028 (m)
0.028 271.173 7.907

145 7.050 1 0.028 0.028 1022.223 7.907

120 7.050 1 0.028 0.028 845.973 7.907

620 2.260 1 0.020 0.020 1401.180 3.973


PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:

LENGTH

Total Bend
Total Nos Of Length of Bar in Bend Bend Deduction Weight Per
Deduction Total length (m)
bars (m) No (m) Meter (Kgs)
620 2.260 1 0.020 (m)
0.020 1401.180 3.973

620 7.050 1 0.020 0.020 4370.980 3.973


PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:

LENGTH

Total Bend
Total Nos Of Length of Bar in Bend Bend Deduction Weight Per
Deduction Total length (m)
bars (m) No (m) Meter (Kgs)
(m)

390 17.362 0.015 0.000 6771.180 2.235

34 10.166 0.015 0.000 345.644 2.235

48 12.000 0.015 0.000 576.000 2.235


PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:

LENGTH

Total Bend
Total Nos Of Length of Bar in Bend Bend Deduction Weight Per
Deduction Total length (m)
bars (m) No (m) Meter (Kgs)
48 12.000 0.015 (m)
0.000 576.000 2.235

148 20.470 0.015 0.000 3029.560 2.235

37 17.434 0.015 0.000 645.058 2.235

37 16.900 0.015 0.000 625.300 2.235


PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT (REACH-II )
BAR BENDING SHEDULE OF UNDERPASS AT AMAN CHOWK

COMPONENT:

LENGTH

Total Bend
Total Nos Of Length of Bar in Bend Bend Deduction Weight Per
Deduction Total length (m)
bars (m) No (m) Meter (Kgs)
37 16.900 0.015 (m)
0.000 625.300 2.235

74 14.450 0.015 0.000 1069.300 2.235

#5 #6 #7 #8 #10 #11
- 29,193.665 - 53,387.702 - 19,506.885
27
PESHAWAR SUSTAINABLE BUS RAPID TRANSIT PROJECT PACKAGE-II LOT-II
BAR BENDING SHEDULE OF WORK SHOP
CONTRACTOR : ANHUI-CALSONS (JV) CONSULTANT : M
STR. TYPE: Cast In Place BAR BENDING SHEDULE OF:
CLEAR CONC. COVER: COMPONENT:
REF. DWG NO: Shop Drawing CD 289

No of Nos of Total Length of Total


Dia of Space Nos of Total Weight Per Total Weight
SR.NO Description Eleme Bar in Nos Of Bar in Bend D/d length
Bar # C/C Bend Bend D/d Meter (Kgs) (Kgs)
nt Each bars (m) (m)

Columns

1 Vertical Dowels Bars #8 4 16 64 2.02 0 0.000 0.000 129.280 3.973 513.629

2 Columns Rings (Internal) #4 150 3 8 24 1.3 5 0.125 3.000 28.200 0.994 28.031

3 Columns Rings (External) #4 150 3 4 12 1.65 5 0.125 1.500 18.300 0.994 18.19

Tank Bed slab

1 Main Top & Bottom Bars #6 125 2 59 118 4.875 2 0.075 8.850 566.400 2.235 1265.904

2 Distr. Top & Bottom Bars #6 125 2 30 60 8.475 2 0.075 4.500 504.000 2.235 1126.44

Corner Beams Extra Bar

3 Short Side Top & Bottom Bars #6 2 6 12 4.875 2 0.075 0.900 57.600 2.235 128.736

4 Long Sides Top & Bottom Bars #6 2 6 12 8.475 2 0.075 0.900 100.800 2.235 225.288
Contractor Quantity Surveyor Consultant Quantity Surveyor
28

No of Nos of Total Length of Total


Dia of Space Nos of Total Weight Per Total Weight
SR.NO Description Eleme Bar in Nos Of Bar in Bend D/d length
Bar # C/C Bend Bend D/d Meter (Kgs) (Kgs)
nt Each bars (m) (m)

4 Long Sides Top & Bottom Bars #6 2 6 12 8.475 2 0.075 0.900 100.800 2.235 225.288

5 Short Side Stirrups #3 150 2 25 50 1.25 4 0.075 3.750 58.750 0.56 32.9

6 Long Side Stirrups #3 150 2 49 98 1.25 4 0.075 7.350 115.150 0.56 64.484

Contractor Quantity Surveyor Consultant Quantity Surveyor


29

No of Nos of Total Length of Total


Dia of Space Nos of Total Weight Per Total Weight
SR.NO Description Eleme Bar in Nos Of Bar in Bend D/d length
Bar # C/C Bend Bend D/d Meter (Kgs) (Kgs)
nt Each bars (m) (m)

Walls

1 Short Walls Vertical Bars #6 125 4 37 148 2.275 2 0.075 11.100 325.600 2.235 727.716

2 Long Walls Vertical Bars #6 125 4 62 248 2.275 2 0.075 18.600 545.600 2.235 1219.416

1 Short Walls Distr. Bars Each Way #4 150 4 9 36 4.875 2 0.050 1.800 173.700 0.56 97.272

2 Long Walls Distr. Bars Each Way #4 150 4 9 36 8.475 2 0.050 1.800 303.300 0.56 169.848

Tank Top Slab

Main Top & Bottom Bars Without Cover


1 #4 200 2 38 76 4.875 2 0.050 3.800 366.700 0.994 364.5
Portion

1 Main Top & Bottom Bars Cover Portion #4 200 2 4 8 3.575 2 0.050 0.400 28.200 0.994 28.031

1 Main Top & Bottom Bars Cover Portion #4 200 2 4 8 0.725 2 0.050 0.400 5.400 0.994 5.368

Distr. Top & Bottom Bars Without Cover


2 #4 200 2 20 40 5.175 2 0.050 2.000 205.000 0.994 203.77
Portion

1 Distr. Top & Bottom Bars Cover Portion #4 200 2 4 8 6.975 2 0.050 0.400 55.400 0.994 55.068

Contractor Quantity Surveyor Consultant Quantity Surveyor


30

No of Nos of Total Length of Total


Dia of Space Nos of Total Weight Per Total Weight
SR.NO Description Eleme Bar in Nos Of Bar in Bend D/d length
Bar # C/C Bend Bend D/d Meter (Kgs) (Kgs)
1 Distr. Top & Bottom Bars Cover Portion #4 200 nt
2 Each
4 bars
8 (m)
6.975 2 0.050 0.400 (m)
55.400 0.994 55.068

1 Distr. Top & Bottom Bars Cover Portion #4 200 2 4 8 0.725 2 0.050 0.400 5.400 0.994 5.368

Additional Bars Around Cover Top &


3 #4 200 4 4 16 1.5 0 0.000 0.000 24.000 0.994 23.856
Bottom

6303.815
Grand Total
6.304
Weight Dia wise #3 #4 #5 #6 #8 #9 # 11
Dia wise Total 97.384 999.302 0 4693.5 513.629 0 0 6.304

Contractor Quantity Surveyor Consultant Quantity Surveyor


31
SIT PROJECT PACKAGE-II LOT-II
EDULE OF WORK SHOP
CONSULTANT : MMP
Work Shop
Over Head Water Tank

Bar Shape

0.3
1.720

0.375
0.075

0.200

0.200
0.375 0.075

0.375
0.075
0.375

0.375
0.150 0.375 0.075

0.150
4.575
0.150

0.150
8.175
0.150

4.575 0.150
0.150

0.150

Contractor Quantity Surveyor Consultant Quantity Surveyor


32

Bar Shape

0.150

0.150
8.175

0.375
0.075

0.175

0.175
0.075
0.375
0.375
0.075

0.175

0.175
0.075
0.375

Contractor Quantity Surveyor Consultant Quantity Surveyor


33

Bar Shape

0.3

1.675
0.30
0.30

1.675
0.30

0.150

0.150
4.575

0.150

0.150
8.175

0.150

0.150
4.575
0.150

0.150
3.275
0.150

0.150
0.425
0.150

0.150
4.875
0.150

0.150

6.675

Contractor Quantity Surveyor Consultant Quantity Surveyor


34

Bar Shape

0.150

0.150
0.425

1.500

Kgs
Tons

Tons

Contractor Quantity Surveyor Consultant Quantity Surveyor