ORR i BTS INSTALLATION GUIDELINES tl TELKOMSEL Project Keys Telkomsel Sulawesi modernization Phase Il guide Wo When What Whe 1 Phoning® «Permit Panes Preparation 2 Key Teche, 3. Desi ack SS) .CA Coordinator 4A Wa certat, raining crate, SS. Checking insalinton Toole, Safety ?P 6 Ste Address, rout and contact etal 2 wos check al Matar tems acersing to ON fste BOM in DP Peres 2. Any missing shouldbe write on ON Receiving ete B Ecletero2Te ‘Technician 3. Ensure HSE Compiles, No Salty PPE -No Worl Mandatory: Safety Heras Safety hemes fey Shoes, Safty & Gloves 3 metalation 1. Enwure pre labeting oF RU optical RU power & RF umpercable fest, Partners Commisioning 2 Team Fnshqualty se check kiting pot using Ste Manager Teennion 3 Enuire Team fofow te Ostign ad naalaon Standard Engines 44 Any misunderstanding, question abou solution, work te comet ZTE Engine. 5 say exception om design and ete tendo mut take writen approval from ZTE befor proces lnstlito, 6 Repon ny nedent rom Se 8 Prohibit touth any unconarned exiting equipment 4 agstonand 1. ParnarsDo Intagation of eaulpment Parner Eng A 2 cChce with ZTE PIcthat there sno Asem, 2. Eraure no oss ber eanestion among ect. 5S inewrator 2 Fi ou he LOM form according tothe dats obtained from the ld Teehnican 3. Emalto PACMCZTE to request OR by aching LOM | Team dsmanue the equipment nd ibelng 5 team take photo beter dane 6 Matera pickup by mover {© AferFinkh 1, Teamleaderdoqulty sitcheck sing TE Ste Managerafteralwork Partners Insalacon& compete, Teetnican ca 2. Teamleaderoordnate with TEEPMS Review team tomaie sure clfchack Ereneer ssetes 3. Without Self chek completed, Team nt allowed to leave Site 7 Ne 1 Folow ATP Pxoeedire pez Technician I 2 Gano erat beaker 025A) 3 coup 1p a81 8) dds a ds) om — ene | seine Ss [s 1, Power module (PM) 2. Site alarm board (SA) 3. Fabric switch board (FS) 4. Baseband processing board (BP) 5. Fan array module (FAM) 6. Control & clock board (CC) =e = lier = Fay Bi a = =e a cha oJ a i ‘ i mal 0'|) 1Q}0 en pera Hemet) ae cong eee ce Be | z — ir Lo vel lath et nn Exar a ro a = meet ererenry RRU-DCPD7 POWER CABLE AND RECTIFIER-DCPD7 POWER CABLE ‘SHOULD USED SCUN CABLE HORIZONTAL TRAY. CUMIN U TOT eKELRE NU Nawea ae Placement RRU & Filter on Leg Tower Priority ANANSI ky ey [. UME ANTENNA PORT CONNECTION (8 PORT & 12 PORT) R1 694/698-960 RRU R2 694/698-960 RRU aes 18862/8882/8852E LTE 900} B 83862/8882/B852E Gsm+usE0 YLLY1 1695/1710-2690 Y2-¥2.1695/1710-2690 RRU 88724 DCS/LTE 1800 RU 8852E/8863, UMTs/tTE 2100 ¥3-¥3 1695/1710-2690 ‘Ya-V4 1695/1710-2690 RRU 8978 TD02300 Ant1 RRU 8978 TDD2300 Ant3 Ant2/Ant5 & Ant6 &Anta/ Ant7 and Ant RU 8862 LTE RU 8852E LTE BBU LTE FDD & TOD BBU LTE FDD & TOD RU 8872A LTE RU 8863 LTE BBU LTE FDD & TOD BBU LTE FDD & TOD RRU 8862/ 8852E/ 88721 RU 8978 TDD 2300 ‘8863 WITHOUT NE LTE BBU LTE TOD aU TDD TDD SWAP ANTENNA SWAP ANTENNA ADDITIONAL PHOTO REQUIREMENT nd oa =n vd yas BEFORE BEFORE GEiTEe i str AFTER =BEFORE ECan ies ay Lapa Md cn, PHOTO AZIMUTH, ANTENNA HEIGHT, ra ETILT & MTILT SUBMIT VIA SITE Md MANAGER “TASK SWAP ANTENNA” ESS | MANDATORY ) = SELFCHECK KITTING LABEL WARNA RRU 8862-8872A-8863 (FDD) —— =a =| = RRU 8978 (TDD) a = See RRU 8852 (GUL)

You might also like