PRODUCTION
Lean manufacturing and JIT
‘Kanban’ ~ using 4 ‘pull® system where
production responds quickly to real,
observed demand. This contrasts with &
push’ system where production is based
fon forecasts of demand Cwhich may not
bbe accurate)
Continuous process: work in
progress without stopping
Mass process: high volume, low variety
Batch process: groups of products of
the same type move through the process
Job production: low volume,
opportunities for customization
Project Cas in ‘project jement >:
highly customized products, long timescale
Flexible mannfacturing: designing machines
to do multiple tasks; reprogramming
machine tools while they are running g
Mass customization: tailoring products
Yo meet the needs of « large number
i
‘
%
$
Guality can be seen from a
manufacturing of 4 customer
point of view
Perfect quality comes at
4 price: is it justified?
Quality standards: internal
technical ‘Standards, ISO 9000
Family, Six Sigua
Checks on quality: what to check
for? which stages in the
production process? frequency?
every product or just 4 sample 2
Use of benchmarking (= comparison
with best practice in. the industry?
45 4 tool for improvement
wwww.vorne.com (> Solutions > Learning Center)
oF individual customers
“Forecasting demand fluctuations
Seasonality, ete
Maximizing capacity utilization
(> making the best use of the
capacity you have)
Monitoring equipment:
set-up and change-over
time / causes of breakdowns /
Speed losses / quality losses
Adjusting capacity:
Overtime / using part-time staff;
subcontracting parts of the
operation; changing demand
through price; developing products
with @ different seasonal demand /
Advantages of
storing materials
Buy the best when it is available
Respond quickly and flexibly
‘to changes in demand
Insure against unexpected problems
Buy in bulk to reduce costs
J disadvantages of
storing materials
Ties Up working capital
Has to be stored,
insured and handled
Can deteriorate
or be damaged
Perpetual inventory system:
soPtware knows what was sold
Cand when and where); when
inventory falls to « predefined
‘re-order level’ there is «
trigger to order more stock
woww.tutor2unet (> Revision Notes/Production & Ops)