Report No:
L
SOURCE ~ NON-CONFORMANCE REPORT Rear
°
Particulars of project
NY G. projec ame as Abu Aboud Stadium and Preinct
NY GL citer nae: BK Contracting Co. WLL, Qatar.
supper
Monutecurer ‘al Dung Corporation = DDE An Ha, Vietnam
DNV GL acs on bhatt: OK Contracting Co. WLL, Qatar
DAV GL orderP0 umber
Inspection details
Inspection start date (2010-20-12)
inspection end cat (go19-10-12)
PO item no, } ‘Quantity, [Description of non-conformity and possible root |
fomered—[Rejeced as)
oan Co > Reef SC CDS STE HBRSPEST 0064 Rav 7,
plate | ‘tem 6.2.1 required 235 for al pate > 20mm
Lora rire.
a ee ain onatesahocs cokers‘SOURCE - NON- CONFORMANCE REPORT Report No: NER-HBK-VN-RAA-027
Corrective/Preventive actionsh
[Acton(s) proposed by Manufacturer Proposed Verified on [Verification
|completion ‘completed by
late
Som nayamer ieee tate
ee ees tees ear
mesrarar are wetter? ,
Serer eae, 7
cate et oe Jp? der
a dae an
cee
+ Tha parts of S0mm pates (225) nthe [
photos are bang ct forthe connection
between secorsary bears an rater I
beams. Pease refer to trochmentsOt
{or simoeconnaesion were 20mm
eres vp
Jee lad
= -Atachment #02 to 32 address the sie
fases where the treugh-hickness
prover of te plate does rt follow the
Fabien Secon 21, Peace berated
that all he shop cravings have been
approved by SP ALS
‘actions!
SOT ee frmation related to design need
fo be confirm by Design before
12 Photographs on ast page ofthis report
‘cational comments(le poe Nera)
Inspector
‘pen dts: (2039°20-13)
Distributor: B) customer Supplier
stamp: _
on (optional)
Greny SP PG
Inspector
Coed cies (LE PHUOE NOTA)
Bi ManufacturerSOURCE - NON-CONFORMANCE REPORT Repor No: NER
Photographs