You are on page 1of 4
Report No: L SOURCE ~ NON-CONFORMANCE REPORT Rear ° Particulars of project NY G. projec ame as Abu Aboud Stadium and Preinct NY GL citer nae: BK Contracting Co. WLL, Qatar. supper Monutecurer ‘al Dung Corporation = DDE An Ha, Vietnam DNV GL acs on bhatt: OK Contracting Co. WLL, Qatar DAV GL orderP0 umber Inspection details Inspection start date (2010-20-12) inspection end cat (go19-10-12) PO item no, } ‘Quantity, [Description of non-conformity and possible root | fomered—[Rejeced as) oan Co > Reef SC CDS STE HBRSPEST 0064 Rav 7, plate | ‘tem 6.2.1 required 235 for al pate > 20mm Lora rire. a ee ain onatesahocs cokers ‘SOURCE - NON- CONFORMANCE REPORT Report No: NER-HBK-VN-RAA-027 Corrective/Preventive actionsh [Acton(s) proposed by Manufacturer Proposed Verified on [Verification |completion ‘completed by late Som nayamer ieee tate ee ees tees ear mesrarar are wetter? , Serer eae, 7 cate et oe Jp? der a dae an cee + Tha parts of S0mm pates (225) nthe [ photos are bang ct forthe connection between secorsary bears an rater I beams. Pease refer to trochmentsOt {or simoeconnaesion were 20mm eres vp Jee lad = -Atachment #02 to 32 address the sie fases where the treugh-hickness prover of te plate does rt follow the Fabien Secon 21, Peace berated that all he shop cravings have been approved by SP ALS ‘actions! SOT ee frmation related to design need fo be confirm by Design before 12 Photographs on ast page ofthis report ‘cational comments (le poe Nera) Inspector ‘pen dts: (2039°20-13) Distributor: B) customer Supplier stamp: _ on (optional) Greny SP PG Inspector Coed cies (LE PHUOE NOTA) Bi Manufacturer SOURCE - NON-CONFORMANCE REPORT Repor No: NER Photographs

You might also like