Having to consider closing manufacturing assets, Our complete service for the overall stewardship of
due to their competitive position, is a reality of the projects, includes:
current economy. During this process a range of
outcomes, from business turnaround to shutting a -- Provision of overall project management,
whole site and selling off the land, must be including project control, planning and
considered. Other options include mothballing (for procurement management
restart, sale or later demolition) and a range of -- Environmental consultancy and technical field
scales of demolition (part or all of a site and to support
ground level or below). -- Acting as CDM principal designers
Once site demolition has been selected as a way ABB have developed a five stage demolition
forward, the most effective and suitable solution methodology based on our experience of managing
must be sought. over £250m worth of demolition and remediation
projects in the process industries.
What we offer
ABB can support clients in all areas of demolition We can offer a safe, cost effective approach to
works; from site environmental assessments and meeting objectives through:
isolations and removal / disposal of equipment,
through to full site demolition and remediation. -- Project management of all stages of the process
-- Detailed planning and risk assessments to manage
We can also deal with technical / legal questions and cost, risk and timescales effectively
concerns from potential site purchasers and resolve -- Tailoring the site work scope to match the
legislative issues to obtain the necessary regulatory requirements of the final use of the land
approvals. -- Continuous review and monitoring of all activities
to ensure safe delivery of the project
Benefits
-- Delivery of cost effective and safe site divestment
Stage 1 with reduced ongoing liability
Define scope of -- Minimisation of corporate environmental
works / liabilities, reduced risk of corporate and individual
briefing stage prosecution / poor public image
-- Management of site safety, environmental
standards and interaction with local communities
Stage 2
Design detailed -- All sites are part of a structured programme
Stage 5
Project close planning / throughout the project with up-to-date
manage risks information available for each site
-- Doing only the necessary work for the final land
use
Why ABB?
Stage 4 Our construction and demolition capability is built
Stage 3
On-site on a vast base of experience, reliability and respect
Procurement
management
for the environment. We have substantial experience
in the management of demolition and dismantling
projects - which have included work on power
stations, petrochemical installations, cooling
towers, and major asbestos removal project in
potentially hazardous environments.
Cost management
We tailor our contract packages to meet individual
client requirements, including contract strategy,
contract pricing (re-imbursable, incentivised or
fixed price), enquiry preparation, cost reporting on
a monthly basis, tender selection and assessment of
contractors, ensuring that the most beneficial
contract is selected.
Asset closure/PRS019a/04/18
— —
ABB Limited We reserve the right to make technical We reserve all rights in this document and
Daresbury Park, Daresbury changes or modify the contents of this in the subject matter and illustrations
Warrington, Cheshire document without prior notice. With contained therein. Any reproduction,
WA4 4BT United Kingdom regard to purchase orders, the agreed disclosure to third parties or utilisation of
Phone: +44 (0)1925 741 111 particulars shall prevail. ABB does not its contents – in whole or in parts – is
E-Mail: contact@gb.abb.com accept any responsibility whatsoever for forbidden without prior written consent of
potential errors or possible lack of ABB. Copyright© 2018 ABB
information in this document. All rights reserved
abb.com/consulting