Incident Rebar Truck Demurrage and Delays of Unloading Date October 2, 2019 Location 2 Guiguinto Fabrication Yard (Presam) 3 trucks arrived total Unloaded 1 Truck arrived around past midnight (12:30AM Oct. 1) 2PM (Oct. 2) 2 Trucks arrived early morning (5AM Oct. 1) 9 PM (Oct. 2) ‘Sequence of Event Sta. Clara Lifting Equipment "busy' with Balagtas station bored pile fabrication for whole day of Oct. 1 and night shift until late morning of Oct. 2 ‘SMCC Warehouseman has done visual checking and verification of quantities and documents by early afternoon of Oct. 4 Presam Site engineer endorsed to Sta. Clara supervisor night shift personnel before signing off duty at early evening of Oct. 1 ‘All SMCC personnel was assigned to Malolos laydown area for other activities on Oct. 2 by 11AM. One site engineer was asked to supervise the unloading after lunch break of Oct. 2. Unloading started at 1PM and successfully unloaded the first truck to arrive. However, heavy rain poured from 2PM to 6PM further delaying unloading of the remaining two trucks. Manpower shifting happens at 7PM and unloading activity is endorsed to night shift personnel. Remaining 2 trucks were finally unloaded as first activity of night shift on Oct. 2 from 7PM to 9PM

You might also like