Professional Documents
Culture Documents
PROPERTY LI
C
L
NE
PROPERTY LI
5
2
2 4 3
4
3
1
650
800
260 (TYPE SF)
STEEL PEG STEEL PEG
560 (TYPE SE)
440 210 500
550
STRING LINE STRING LINE FINISHED LEVEL
150
WEARING SURFACE
FINISHED LEVEL
150
TOP OF WEARING SURFACE TOP OF
BASE
KERB R.L. KERB R.L.
BASE
SCHEDULE OF MARKS
3 RECOVERY AND DUMPY PEG PROPERTY LINE 50 × 50 DUMPY PEG (ON METAL TAG) UNPAINTED
NAL
DIFFERENT COLOURS
GI
ZE ORI
5 KERB TYPE SF - OFFSET PEG 800 BEHIND FACE OF MEDIAN 75 × 50 PEG AS ABOVE
40
NG MAY BE PREPARED I
35
30
A3
25
DOCUMENT VER.
DRAWING TO :
MANAGER ROAD POLICY, SPECIFICATIONS & TECHNOLOGY
SETTING OUT DIAGRAM FOR URBAN ROADS
........................................................................................................
S DRAWI
10
ROAD POLICY, SPECIFICATIONS AND STATUS EDMS No. ORIGINAL ISSUE DATE
ProjectWiseQRCodeLayer
№ DESCRIPTION LOCATION TYPE OF MARK COLOUR REMARKS
1 CLEARING STAKE LIMIT OF CLEARING 25 × 25 STAKE TOP 600 mm - PINK -
2 FILL BATTER PROFILE TOE OF FILL BATTER 50 × 50 POSTS WITH 75 × 25 RAIL PARALLEL TO BATTER ORANGE 1 000 mm VERTICAL ABOVE BATTER
3 CUT SLOPE PROFILE ADJACENT TO CUT SLOPE PEG 50 × 50 POSTS WITH 75 × 25 RAIL PARALLEL TO BATTER DARK BLUE 300 mm VERTICAL ABOVE BATTER
5 ROCK SLOPE PEG EDGE OF ROCK CUT 50 × 50 PEG PEG OR STEEL ROD (Ø12) DARK BLUE ACCURATELY LOCATE FOR PRESPLIT DRILLING
6 MEDIAN DRAIN PEG INVERT OF MEDIAN DRAIN 50 × 25 POST WHITE WITH BLACK LINE TO -
7 FORMATION PEG 900 mm FROM EDGE OF FORMATION 50 × 50 PEG PEG SUB-GRADE LEVEL AND SELECTED SUFFICIENT HEIGHT TO PROTECT
OR STEEL ROD (MINIMUM Ø20) SUB-GRADE THICKNESS-LIGHT GREEN X-FALL ACROSS TOTAL FORMATION
8 RECOVERY MARK AND INDICATOR IMMEDIATELY CLEAR OF EARTHWORKS TACK IN 50 × 50 × 200 PEG 50 × 50 × 1 500 POST WHITE PEG DRIVEN FLUSH WITH GROUND CHAINAGE
3 8
1
4
NE
NE
5
LI
LI
7
AS SPECIFIED
7 7 6
7
2
8
1
CONTROL
CONTROL
AS SPECIFIED
ED
FCOPI
A3
25
DOCUMENT VER.
DRAWING TO :
MANAGER ROAD POLICY, SPECIFICATIONS & TECHNOLOGY
SETTING OUT DIAGRAM FOR RURAL ROADS
........................................................................................................
S DRAWI
10
ROAD POLICY, SPECIFICATIONS AND STATUS EDMS No. ORIGINAL ISSUE DATE
ProjectWiseQRCodeLayer
1
--
E
OP
SL
EXISTING SURFACE
ER
TT
BA
MIN 600
SIDE ELEVATION
ROCK
FILLED MATTRESS
EMBANKMENT
PE
O
SL
ER
TT
1 BA
--
MIN 600
EXISTING SURFACE
PLAN
MIN 600
BRI
DGE EXISTING SURFACE
ED
FCOPI
1 2
TO
TO 1
2
NCOMPLETE I
GI
ZE ORI NAL
N COLOUR AND MAY BE I
NOTES
50mm ON A3SI
A3
25
DOCUMENT VER.
DRAWING TO :
MANAGER ROAD POLICY, SPECIFICATIONS & TECHNOLOGY
SPILL THROUGH BATTER PROTECTION
........................................................................................................
S DRAWI
AT BRIDGE ABUTMENTS
10
ROAD POLICY, SPECIFICATIONS AND STATUS EDMS No. ORIGINAL ISSUE DATE
ProjectWiseQRCodeLayer
APPROACH ROAD TO BRIDGE BRIDGE ABUTMENT
1
--
TOP OF BATTER
CONCRETE BLOCK
CONCRETE BLOCK FACING FACING ( LAID ON
( NO FABRIC REQUIRED ) APPROVED FABRIC
AS SHOWN )
CONCRETE EDGE
STRIPS 150 X 150
CONCRETE BLOCK
FACING ( LAID ON APPROVED
FABRIC AS SHOWN HATCHED )
150
SECTION 1
NOT TO SCALE --
500
TOE OF BATTER
300
1000 2000
CONCRETE FOOTING --
OVERBRIDGE
CONTROL ON ROADWAY
ED
FCOPI
NCOMPLETE I
GI
ZE ORI NAL
PLAN A
N COLOUR AND MAY BE I
50mm ON A3SI
NOTES
45
AT 28 DAYS.
40
NG MAY BE PREPARED I
35
30
A3
25
DOCUMENT VER.
DRAWING TO :
MANAGER ROAD POLICY, SPECIFICATIONS & TECHNOLOGY
CONCRETE BLOCK FACING OF BATTERS
........................................................................................................
S DRAWI
AT BRIDGE ABUTMENTS
10
ROAD POLICY, SPECIFICATIONS AND STATUS EDMS No. ORIGINAL ISSUE DATE
ProjectWiseQRCodeLayer
BRIDGE DECK
N
500MI
2
TO
1
NE
NE
LI
LI
NE
NE
CONTROL
CONTROL
LI
LI
EARTH MOUND
DEPRESSED MEDIAN
10000
SECTION 1
NOT TO SCALE --
1 1
-- --
2000 2000
10000
EARTH MOUND
CONTROL
CONTROL
ED
FCOPI
NCOMPLETE I
GI
ZE ORI NAL
N COLOUR AND MAY BE I
50mm ON A3SI
NOTES
45
A3
25
DOCUMENT VER.
DRAWING TO :
MANAGER ROAD POLICY, SPECIFICATIONS & TECHNOLOGY
EARTH MOUND TO PROTECT BRIDGE PIERS
........................................................................................................
S DRAWI
10
ROAD POLICY, SPECIFICATIONS AND STATUS EDMS No. ORIGINAL ISSUE DATE
ProjectWiseQRCodeLayer