You are on page 1of 1

From: Durairaj, Dhanakumar

Sent: Wednesday, January 8, 2020 4:55 PM


To: Marjan Pkg-1 Elect Engg Group <MarjanPkg-
1EnggGroup@mcdermottinc.onmicrosoft.com>
Cc: Subramaniam, Balaji <bsubramaniam@mcdermott.com>; Arumugaraj, Arumugam Pitchiah
<AArumugaraj@mcdermott.com>
Subject: D7068- Panelboards Revised inputs- Reg

Team,

Please find the consulate points after discussion with DM regarding the
panelboards,

1. Move all the power panels powered to field to outdoor from indoor.
2. Check the ampacity, voltage drop, end of line fault for lighting fixture.
3. Prepare the backup documents for arriving the no. of feeders, loads.
4. Prepare the drawing for location of convenience socket (20m for outdoor and
6m for indoor)
5. As per the DM mail it stated that provide the no. of panels as of required
now (Present day input). If any loads included in future we will include this
panels in future with correct backup documents.
6. After finalize of all the panels and loads, prepare / update the panel
schedule.

Based on the above prepare the revised inputs of MR for panelboards (indoor and
outdoor). The same we need to revise the MR.

Regards,
D.Dhanakumar

You might also like