Professional Documents
Culture Documents
14/11/2019
ARVAL INSPECTION REPORT
End Of Contract
GENERAL INFO CHECK POINTS
There is no chargeable damage
OTHER DAMAGE(S)
13 Bumper Front // Painting Y
133 Bumper Rear // Painting Y
321 Wheel Alloy Rear Left // Repair Y
331 Wheel Alloy Rear Right // Repair Y
341 Wheel Alloy Front Right // Repair Y
If documents or keys are charged, you have 5 working days to deliver them to Arval.
DAMAGE PICTURES
Damage within Renta-norm
OTHER DAMAGES
Bumper Front // Painting: E - Scratch
Bumper Rear // Painting: E - Scratch
Wheel Alloy Rear Left // Repair: E - Scratch
Wheel Alloy Rear Right // Repair: E - Scratch
Wheel Alloy Front Right // Repair: E - Scratch