8 FINAL INSPECTION
CONFIRMATION OF COMPLETION FOR ALL Purchase Order, Applicable Purchase Order, Applicable
8.1 REQUIRED TEST AND INSPECTION documents documents
FINAL DIMENSIONAL AND VISUAL Purchase Order, Applicable Purchase Order, Applicable
8.2 INSPECTIONS documents documents
: Page 2 of 2
w, “Yes” = Record Shall be Included in MDR or in (FD) Final Dossier.
Inspection Party Requirements Record
Verifying Documentation Remarks
and Evidence Vendor JGC CPY MDR FD
Lamination procedure
V-215A-811-A-876 and V R R YES
Detailed drawing
V-215A-811-A-876
WPS, PQR V- R R R
215A-811-A-860
NDE Procedure R R R
V-215A-811-A-861
MTC
Certificate of H R R YES
manufacturing.
WPS-PQR INCLUDING
WELD MAP V R R YES
V-215A-811-A-860
MTC
NDE Procedure R R R YES
V-215A-811-A-861
MTC
Certificate of H R R YES
manufacturing.
MTC
Material certificate, H R R YES
calibration certificate.
WPS, PQR V- H R R
215A-811-A-860
NDE Procedure H R R
V-215A-811-A-861
Inspection report
QR-DAI-5 V R R YES
MTC
Certificate of V R R YES
manufacturing.
Confirmation of
completion for all
required test and V R R
inspection check list
Confirmation of
completion of MDR V H R
preparation.
Confirmation of
preservation and nozzle V W R YES
flange condition check list.