You are on page 1of 6
October 28, 2019 FSL & Associates, Co. 6" & 7" Floor, FSL Center, SL Building, 1407 F. Yuseco St., Sta. Cruz, Manila Attention : Arch. Patrick Jefferson Lim Project: 28- STOREY E-COM LOGISTICS WAREHOUSE BLDG. Antonio S, Arnaiz Ave., cor. Rufino Mateo St., Brgy. San Rafael, Pasay City ‘Subject : Estimated Water Consumption and STP Flowrate Estimated Water Consumption: Item / Description Area Factor Project Load (sq.m) (CMD/sq.m.) (CMD) 4. Warehouse Unit - 1 7.482 0.0020 14.36 2. Warehouse Unit - 2 7,185 0.0020 14.37 3. Warehouse Unit - 3 7,183 0.0020 14.37 4. Warehouse Unit - 4 7,208 0.0020 14.42 5. Warehouse Unit - 5 6.879 0.0020 13.76 6. Common Area / Utility 12,140 0.0040 48.56 7. Parking / Driveway 3,800 0.0010 3.80 723. say 125 m‘/day or 33,000 gals/day Potable Water Tank: Water storage time = approximately 2 days Water consumption aday = 33,000 gals /day 33,000 gals./day x 2days = 66,000 gallons (250m*) Provide: Cistemn Tank: 2 (two) ~ Potable Domestic Cistem Tank w/ a cap. of 26,000 gals. each. Overhead Water Tank: 2 (two) ~ Potable Overhead Water Tank w/ a cap. of 7,000 gals. Fire Reserved Tank: 4 (one) — Fire Reserve Cistern Tank wi a cap. of 90,000 gals. Di IGUERO ENGINEERS +» CONSULTANTS STOCROF SANCHED ST. UANOA’UYOND ST, PHRIBERES STP Fiowrate : Flow rate using 90% of water consumption 33,000 galsiday x 0.90 = 29,700 gals/day © Flow rate on ECC application is 30,000 gals/day or 115 m"/day ‘* Biochemical Oxygen Demand (BOD) = 400 mg/l Note: ‘STP design in compliance with DENR Administrative Order (PAO) no, 2016-08 ENGINEERS + CONSULTANTS Salty qamsetiaardstmeatt sachs warenioe ma are yanso com ferenantgran game om ‘ergs lrnaratyaron com - Ese? OFFICE OF THE CITY TREASURER ‘Accountable Form Not ORIGINAL ‘Revised Jamuary 1992 xo. 3808536 ANTHONY C._ FIGUEROA. Nature of Coteton” Ans SAUTARY ENGINEER Pao i> 300.0 Money Order Number Dato Treasury Warrant Check, Money Ore Bronesibinticaitich itinon © carmrovne 9002691 summoner 59/08/2012 wpenm > 06/25/2021 Pe BIRGER NNTGH Oss 17-088774 PTR NO. 3808536 REG NO. 0002691 ISSUED ON JAN. 04, 2019 PTR NO. 3808536 REG NO. 0002691 ISSUED ON JAN. 04, 2019 TIN NO. 253-886-002 ISSUED AT MANDALUYONG CITY (2-150MM@ CV WLOFDP. 0 a STORM DRAINAGE SYSTEM LAYOU [ i GROUND FLOOR PLAN \ ‘SCALE Ee 1:30 METERS, \ {eR — ap to son VERIFY @ SITE \. P-01 LR st ial PY) eae FOR ECC APPLICATION aa ae L==—_ = (J FSL_& ASSOCIATES, CO. LOGISTICS WAREHOUSE BUILONG SEWER & VENT SYSTEM LAYOUT (4. GROUND FLOOR PLAN { ROUND | (Poe) sone FOR ECC APPLICATION A CIATES, CO. PATRICK JEFFERSON T.LiM (I FSL & ASSO | 75MM@ CWLOF =, GRAVITY FEED (& 150MM@ CWR \° G1. PIPE TO OHWT UNIDIRECTIONAL WATER METER WI VALVE BOX — WATER SUPPLY DISTRIBUTION SYSTEM LAYOUT ,_~ ait (1) GROUND FLOOR PLAN \ \ pos / SCALE +300 METERS \, ae a FOR ECC APPLICATION TRIS ama L 7 [= WEF pence aon mume | eer corer 7 "| 6 ESL & ASSOCIATES, CO. _ | rarmeserensons.um ed eee : Ly eccromanaee —— [a a FSL & ASSOCIATES, CO. 2 ‘ J =e li a : i: = ARCHITECT = DESIGNE! ONSUL | tecanions ross mess communes mar omen oar on =

You might also like