Proposal for
Building Monitoring System
Dec. 2019
OYO Seismic Instrumentation Corp.1. System Over View
1. Installing 6 Seismometers(accelerometers) in the building.
Position : First F, 3rd F, 5th F, 7th F, 9th F, Roof F
2. Data Recording and Processing display will be set in a
control room.
(Display Item)
* Maximum Acceleration, Spectral Intensity
* Calculated Displacement Interlayer displacement
* Wave Form, Orbit Chart
3. System Configuration
1) Compact Seismometer 6 units
2) Analysis and Display PC ‘1 Set
3) Analysis Software 1 Set1) Real time Output Data (1 second)
*Max. Acceleration fee norererennsad EPDPCUBE
*Spectral Intensity I AC Power
2) Earthquake rec
*Max. Acceleration Cable
F AC Power
«Displacement,
AC Power
*Interlayer displacement
“Obit
ft (al... Power
oy i
hal
5 AC Power
AC100V
Analysis and Display Unit2.2 Feature of Compact Seismometer
1) Very Compact Strong Motion Seismometer
2) Measure 3ch acceleration and storage.
3) Calculation:
Max peak G, JMA Intensity, SI number
4) Display:
2 Lines LED Display
Max peak G, JMA, SI etc.
5) Interface: og
Ethernet
6) Backup:
Battery Backup 15 minutes
oYo)$!2.3 Installation sample of Seismometer3.1 Sample of Analysis
History of Measurement Earthquake
Untitled - EPOPey=
) RRM) ATH) 2B
Maximum Acceleration,
Spectral Intensity
YO, $13.2 Sample of Analysis
Result of Max. Acc, Max. Displacement, Interlayer displacement
| Untied - EPDPsys - oO
pre eR ANH) se3.3 Sample of Analysis
Wave Form, Orbit Chart
| @ Untitied - EPOPsys aq x
| WF) 058Thank you for your attention
Saving Lives from
Huge Earthquakes
OYO Seismic Instrumentation Corporation
OYO) SI