You are on page 1of 23
SIEMENS SIEMENS SITRAIN ‘Training for Industry SIMATIC Service 1 in the TIA Portal Course TIA-SERV1 rons ‘ae ens yin 200M ro err el SmRe enn tn 1. SIMATIC S7 System Famiy Installation and Maintenance 2 ofthe Automation System 3 Introduction tothe TIA Portal 4 Training Devices Device contguration 5 an Hardware commissioning fg _Pland DB tags| Wiring test 7 Block Editor ‘and simple Binary instructions 9 Block Architecture ‘and extended Binary instructions 9 Counter, Timer and Arithmetic 40 Iniroduction to Hal ‘Adeping HMI 7) ‘11a DB as user interfatge ~ “2 Iodution wPRiruted 10 PROFINET gad PROFIBUS 19 lvoducion to SINAMICS Standive ila SINAMICS G120 . S ‘download, archiving, updates ‘and version compatibility Final Exercise 15 commissioning and Expanding he Program 16 Suggested Solutions 47 Training and Support Table of contents 1 4, SIMATIC 87 - System Family. 14. SIMATIC'S?-anovenvow. 412. Postloning ote modular 57 convolers 14 48. SIMATICS7-120: Modular compact contoter. 15 14. SIMATIC S7-15%0 Moddar Convo fr the Mid to Upper Pectormanoe Range. 18 441, SMATIC 87-180: CPU Deploy <9 15, SIMATIC 57-10 Sofware Coole. +8 16. TWAPestal formation Contr 19 ‘foteg team, VON TERA 4.4. SIMATIC 87 - an overview SIMATICsofare TN Re ven oe Temateneerretnarmtmseraea™ ‘ib tarry nce Sa otra, nay Pat cmc posible for operation be inte, Infuchced, montored and toned ‘TiA- Totaly integrated automation Poin panna more riod ln hy ee ‘Sports ean ea prosion ‘Speae eco oay wn te oko. 4+ Totty stated snfauaon an progarning so hes eee : aon on components inohed “rg conan vison Ww SER 1 SUWALIC TA ortl Sonven $e comic SBontto Paint (RS232, RS485) ¢DI,D0, DIDO PRoribos ‘AA, AUKO Polntto-Pot(RS485) GPRS Baty backup ofreakeneclock_+AEAA/AEIAA Features Ww + mot comoactcos stan the we paomance nae 2 traded PU rene s + Satna conan + Steen enamine in ances nrerenamone NC © slots = chs aot the et ofthe CPU (number depands ihe CPU) Sis ae tothe it ofthe CPU (oumber PU) + "on pakage' wh CPUandUO one “sed dil anon (Q) ~ expansen worl mA + nie ric nites ee ow NSCerrot sos -optene ay I Er vr ‘SIMATIO TI Pot Suvice 1____ 4.44. SIMATIC 87-1800: CPU Display ‘» Every $7-1500 CPU is vere witha Display ‘+ Two sizes depending onthe CPU type 4.36" up tocPUISIS. 2a" as of CPUISIS «= Has is own MLFB, an be ordered as reflacoment part ‘© CPU can be operated without the Display «Removal and insertion possible during running operation = CPU stays in RUN + Mutingual csplay ofthe menus (Engineering languages) telingual display for errormessage texts (parameterized) '* Language ean be switched during running operation ‘Depending onthe xen CPU ssa, the exo on the Display vaes (9. Eor= ed Dasgroe, RO ne RK sees aoe o ‘Aepey word be acts prove naiorzd opr « ert es ees teh Aree ee | aia ee ae ss ny SE OT cee esi ra e _SATIC TA Pot Sonic 4 4.6, TIA Portal Information Contor othe mostimpotant elvicetntomaton and slutonsfor Entry ID: 65601780 ‘ish aieryormomvaateesinpranne nae TAN Both noacomers ad experienced TA Pera uses have an ent hare othe essontal ‘oration about he TA Poa (CB Linkatsoon te Home page ofA pera One hp An dacea e00 ese WO _swarne 1 Pet Sonic Table of contents 2 2. Installation and maintonance of the automation system. 21, Tooter instar, - 22, s7-tso0 224, Chee iano fon 571606 222) Components orbulang an 87-1600, 2 225. Rule foristalag on 87-1600 224 Moumtng poston whon stalin an 87-180. 225, Expansion aptone and Sit aes wth 29 $7-1805 228, Ltod and sion power sop ofan 57-1500, 2264. Power Budgeting for Sytem Power Suply of 87-180 coiguraicn 2 | 221" Insataton eran? 1600 2212 Madea 2215. Connects ichrigie oth rent connector 2214 Inala othe font connesor. ~ 2215. Fro sor. 228. Checist or he saciclisilaton- poeta 2281. Frontconectr win shed conse! 220." Wang the ort comocter. 22:10, Replacing YO molest an S71800.00 23, Werking wih lector manuals 24, eres: Workng with he S7-1600 manus 24, Breese 1: Anovo ot clifedtetnica queens. 242, Bercoe 2 Wg the signa mone, Dosaaev" ‘Addons oration 87-1200. Rus for naling an 87-1200 ‘MAT 8-4 alton ad ioing Pai) 2a Eipanden options atd Sit tos ofthe 57-12 2 | ina Sen . 228 | ‘Signal Modules - 230 See oO ae 4 2 3 Sint conn 8 oy ‘Hamgtemca iSaSE We a | 24, Tools for installing Checklist Your te ng maureen "Serna eahntmt Behn {pdm to rn Te led mans a ho sate an scorer — ‘his apate e atues tnate wp adonaon tm gic Scone ‘ecotunon nett scat i ~ S y ( ehwoktt cuts en oseice ? «& N\ Sw on Oe ea . Trane dcr, noon TS ‘SMATIOLTA Por Sane 1__ 222. Components forbuil ‘component ing an 87-1500 Function ete ak ran 7-800 Power supty {0 Power Oeon 8. Powe ob vats, main ego (72020 Vt 28 DE parang ‘sing rte nn pow ‘fe S80) bales he balgans bis Cental procensing unt (CP Coneatroeaig unt ec to ur prom ‘Reese Mary rae Dlotalanaiog WO moses dS ew es oe 0 a ‘rod conn: Gos comer (es) ‘Sh tase, hi oral (aso i) Front ceneca (2m do meddt) Accor nt carat (eh We Made) acmnlogy modules (na eemelogy edu) eo nein cour, ee Bid amp Bes ie Access: Fo eed cumperctns oie (acento ‘er comocions wasn euzoaton ssens ‘Racists Cooocing eas Standard mounting rll The meduls (gover spp Power supply “Two mod poe ar aval or the power upp + Sytem poner sui ( “The sytem power suo hi Sunpes 206. Dire PS vant are ctr depending on he conto eer 20230, si60 He wih autem vel PU ad wt 30 ees) re ete ote tra. “o® ee 3) conscton tthe baraane bus (4B tw t + Land power supp (PM ‘The lead poner spy doves 24VDC and odes gs wala tho ‘The cup votag 9 power supp mele has ato ro ‘otage ange swtchorer Central module Onofre crus RR + Status ant oor gens Ro RS XS opt and utut cuts of tho eos and actuators, ws rani oa 2 poo, ahneoad post. The ead “20020 AG 0160 He win automate eg ements ich ith 2 swith stings) yvoage the programing davies or nko further automation sytem anol cabinet: 24 V Qe ling an 87-1600 ‘Observe mounting positions (horizontal/vertical installation) ‘Comply with minimum clearances: —> No minimum clearance on the right and left sides of the rack (modules canbe installed up to the outer edge of the mounting rail) > Upper edge of rack and lower edge of modules: > 25 mm. Observe possible expansions > Max. 32 modules Observe slot rules Low-resistance connection between mounting rail and support — PE connection element for mounting rail Connect modules using U-connectors Do not install a U-connector on the last module x arene » ssmaric 1A Pott 225. Expansion options and Slot Rules with an $7-1500 >> Single-tior assemby Multsier cistibutedIO ET200MP PSIPM CPU max 30modules: DI, DO, Al, AO, CMICP,TM, (orsina) max. 2S (now powor segments hough addional stem power supplies) ‘Maximum configuration Se ee a ee Bas Sts carersieees x secpun sent sO 5 ce ‘+ Aso lot 2 any (0, D0, Al,AO, CNICP, TM, PS) Tih SELECTION rex WS Serna . suai 1 Service 1 2284. Powor Budgeting fer Systm Powor Supply of 57-100 configuration ‘When do I need an additional power segment (an additional PS)? Tow atu 10 odin crgmrinercVOroaae an mech tecenrakette NO” {Saya -cplya yr oy GPU auch esac Ainpeanay tral oer egerson in cian orton (XO™ {asim pove tga s,s a 2 Dudgeteanbe clei and the ned otter stam power spel ori ‘tha nareware ie contigs, a power budget can be extracts om thf Obs conigwation fom four tote ee ‘Towson ech mil pin nett Fag 99 foment — — “6 eer vem oy onan Yon ws ee noeeg fst OS cH Sern ecru tae role must no havea bus conned. Medes ge a aa: ori aa coon Reel ueemeres + Poverty oe + cpu 7 Jumper inks canbe sere, Strain relief by rneans of cable tes Te comeatne poss sgn, fort emer pune ote sal moses, To prevent theocracy ag ety paced er, hrs amecanel ng ‘bewoen the module and the co ‘8 owgng up he reas latch, and pulng toward youth font connector released Ke fhemodue Prewislng Poston 20 ‘The fon connec lees wiin the module. Inti poston, came is ost of {homodu, butte fot comacor ad the module ae ot yt lc Jumper Links for modules with with 35 mm ‘The jumper inks cane inset in tha tnt connector nfo So. wp ofloed sree Tat esa po ag ser a oe a ee OW iiretsaaenttaraaa ma

You might also like