Two
categories of risks should be clearly identified: first is risk to building from
environmental factors, and second is risk to environment due to the building. Also
identify whether the risk is construction period or operational period risk. The Initial
Environmental Examination (IEE) or an Environmental Impact Assessment (EIA)
process should start as early as possible, if an IEE or an EIA is necessary, so that this
completed in time. Broadly, environmental consideration (IEE or EIA or in other form)
will cover the following: baseline environmental conditions, potential environmental
impacts and their mitigations (both direct and indirect impacts, and impacts during
construction and/or operation), opportunities for environmental enhancement, and
proposed design and other measures for protection of the environment.