buildings on site as per the Plan, measurement of works executed by the Contractor,

certification for payments for the works executed in conformity with the contract
requirements.

3.10. Review of Contractor(s)' Implementation Schedule

The Contractor(s)' proposed implementation schedule shall be reviewed thoroughlyby


the Consultant. Interrelations between the various activities shall be carefullyreviewed
particularly with respect to time allocation, commencement and completiondates. At
the end of this procedure, an agreed implementation schedule should beprovided by the
contractor(s) to the satisfaction of all parties.

3.11Supervision of Construction Works

The Consultant should provide the necessary supervisory staff to be employed


duringthe period of implementation in executive and supervisory capacities in
respect ofthe construction contracts. The Consultant will be delegated with all
normal dutiesand powers of the "Residential Engineer as a project manager" for
the implementation of the project.
It will be the responsibility of the Consultant to supervise all operations fromthe
time of demolition of existing buildings to the handover of the completed new
building on behalfof the DHM and to ensure that the work of the Contractor(s)
carried out in aproperworkmanship and expeditious manner and in accordance
with the contract documents.
The Consultant will check, approve, reject and record, as the case may be, inter
alia,the following:
• Contractor(s)' construction plant and equipment
• Materials of construction
• Concrete testing, procedures and results
• Construction of site works: concrete structures, steel
structures,finishing, mechanical, water supply, sanitation &
electrical works and other utilities as required.
Review and approve all methods proposed by the Contractor(s) for permanent
and temporary works, formwork, etc. to ensure conformity with construction