You are on page 1of 7
F-NC-174 MAN (Elephant) Development Project - GOSP | FERROSTAAL| Peweretion F-17ai010-01 | __ PROJECT MANAGEMENT PROCEDURE | 520.02 71370 PROCEDURE NO. GS-MO-Q-PR-00-017-C1 1.0 PURPOSE 20 SCOPE 3.0 DEFINITIONS AND ABBREVIATIONS. 4.0 RESPONSIBILITIES......... 5.0 PROCEDURE.. = 6.0 REFERENCE DOCUMENTS. 7.0 DISTRIBUTION onsen ATTACHMENT AO1 BID EVALUATION CONTENTS FORM NOTIFICATION BID EVALUATION. ATTACHMENT AQ2_ FORM TECHNICAL BID EVALUATION AGP O1 COMPANY LIM FNC 17 TPR [Name: Wai SBrIa- Date: Movies. 02..... FIELD DEVELOPMENT PROJECT many Management Team PROVE Ra RONNNN 4 Page Page 1 of 4 ot | 14.10.02 |F. Kunstein |W. Stumpf Dr. Suckut] |For Implementation Rev] Date Prepared Checked ‘Approved | Dasernon of Revision GPROITCT Bid Evaluation Revision C1, dated 21.07.2003 Indubiarane | Procedure No. GS-MO-PR-00-017 Page 2 of 4 fuen Fl 10 2.0 3.0 40 PURPOSE This procedure describes the technical evaluation of bids submitted by vendors or subcon- tractors. This procedures ensures, that only those bids which fulfil the requirements of the inquiry specification are considered in the final bid tabulation, SCOPE This procedure applies to engineering activities carried out for the GOSP project. DEFINITIONS AND ABBREVIATIONS EP Engineering Partner le Lead Engineer PEM — — Project Engineering Manager PPM — — Project Procurement Manager PQM — — Project Quality Manager RESPONSIBILITIES The preparation, review and approval of this procedure is described in Project Quality Man- agement Plan GS-MO-Q-QA-00-001 section 7.0. The criteria for the above are described in GS-MO-0-QA-00-001 section 5.2. The PEM is responsible for the implementation of and adherence to this procedure. OPROTCT Procedure No. GS-MO-PR-00-017 Bid Evaluation Revision C1, dated 21.07.2003 Page 3 of 4 FERROSTAAL! 5.0 PROCEDURE CH ‘prow Evauled ly oat id Evaluation prea——or) Recetot ‘sarbuion [Remeron pra Prpaesonot >| PPPMLOIE Sansomare besooe ‘eaten wi ¥ ER 7] Report ot PePMao18 Staten ah poe ees ent Bis Evaton OF + Usetemuciseris 2 + vance 05 + Usetem oMErs6 OF + Next Pane toner ‘GPROT CT Procedure No. GS-MO-PR-00-017 Page 4 of 4 Bid Evaluation FERROSTAAL| Revision C1, dated 21.07.2003 6.0 REFERENCE DOCUMENTS Contractor's Project Procedures: GS-MO--QA-00-001 Project Quality Management Plan Contractor's Standard Procedures: MGO-Q-QA-001 Preparation, Review and Approval of QM Documents 7.0 DISTRIBUTION This procedure shall be distributed by the POM according to Project Quality Management Plan POP-QA-0001, section 7.0: 1 copy Geisenheim Document Control 1 copy Site Document Control GPROTo Procedure No.GS-MO-Q-PR-00-017 Attachment A01, Page 4 of 1 F-NC-174 a (Elephant) Development Project - GOSP_ | FERROSTAAL| pacino ‘Petraioi0-01 NOTIFICATION BID EVALUTION Ne Technical Bid Evaluation Requisition No: ‘Scope of work: Equipment No. / Tag No. Please find attached bid(s) for above mentioned scope. Bid evaluation shall be closed out complete with recommendation by. Bidders: If you need any further information concerning these documents, please contact the undersigned, PEM DISTRIBUTION ‘COMMENTS: reco Taal] OUT au] BA] GL] A] wR] | wT [rom ppm PEW a Sy na a Son Te mee 1" GPROTCTAT ‘Farz00s TomEraS Attachment A02, Page 1 of 2 ores oy tay oats o_o 8007 20142 OvIOLONLD oral sommyer| wens] oe :sqyeuweg ssjveUwu0g ‘sjuewwo ‘squeunog ‘sued oreds ‘oun Aenea ‘SuOREUEA EDIUYDeL ONE ISU WaISAS YO {Aeieiodes pore suone:nOp any ‘2uonisinbas uy paunbau se ereidweo pig TOpPIa ‘suomipuos / adoos rea :0y18 uo pexinboy hom yo adoos_ FON uopisinboy ozz4z zo Ozs ON GOF La NOLLVNTWAA GIG TWOINDAL LO-OLO/PLI-4 ON 1288000 OV Ene Na dSO9 - }99fo1g uowdojaneg (ueyde3) PLL-ON'A * Procedure No, GS-MO-Q-PR-00-017 e00z 2012 coro uoNED any ses ons 09 20 nn ‘suo; 1puos / edoas| Joppia :ayep poou oys | >yiom yo odoos PON wonrsinbey

You might also like