F-NC-174 MAN
(Elephant) Development Project - GOSP | FERROSTAAL|
Peweretion
F-17ai010-01 | __ PROJECT MANAGEMENT PROCEDURE | 520.02 71370
PROCEDURE NO. GS-MO-Q-PR-00-017-C1
1.0 PURPOSE
20 SCOPE
3.0 DEFINITIONS AND ABBREVIATIONS.
4.0 RESPONSIBILITIES.........
5.0 PROCEDURE.. =
6.0 REFERENCE DOCUMENTS.
7.0 DISTRIBUTION onsen
ATTACHMENT AO1
BID EVALUATION
CONTENTS
FORM NOTIFICATION BID EVALUATION.
ATTACHMENT AQ2_ FORM TECHNICAL BID EVALUATION
AGP O1 COMPANY LIM
FNC 17 TPR
[Name: Wai SBrIa-
Date: Movies. 02.....
FIELD DEVELOPMENT PROJECT
many Management Team
PROVE
Ra RONNNN
4 Page
Page 1 of 4
ot | 14.10.02 |F. Kunstein |W. Stumpf
Dr. Suckut] |For Implementation
Rev] Date
Prepared Checked ‘Approved | Dasernon of Revision
GPROITCTBid Evaluation
Revision C1, dated 21.07.2003 Indubiarane |
Procedure No. GS-MO-PR-00-017 Page 2 of 4 fuen
Fl
10
2.0
3.0
40
PURPOSE
This procedure describes the technical evaluation of bids submitted by vendors or subcon-
tractors.
This procedures ensures, that only those bids which fulfil the requirements of the inquiry
specification are considered in the final bid tabulation,
SCOPE
This procedure applies to engineering activities carried out for the GOSP project.
DEFINITIONS AND ABBREVIATIONS
EP Engineering Partner
le Lead Engineer
PEM — — Project Engineering Manager
PPM — — Project Procurement Manager
PQM — — Project Quality Manager
RESPONSIBILITIES
The preparation, review and approval of this procedure is described in Project Quality Man-
agement Plan GS-MO-Q-QA-00-001 section 7.0.
The criteria for the above are described in GS-MO-0-QA-00-001 section 5.2.
The PEM is responsible for the implementation of and adherence to this procedure.
OPROTCTProcedure No. GS-MO-PR-00-017
Bid Evaluation
Revision C1, dated 21.07.2003
Page 3 of 4
FERROSTAAL!
5.0 PROCEDURE
CH
‘prow
Evauled ly
oat
id Evaluation
prea——or)
Recetot
‘sarbuion
[Remeron pra
Prpaesonot >| PPPMLOIE
Sansomare
besooe
‘eaten wi
¥
ER 7]
Report ot PePMao18
Staten ah
poe ees
ent
Bis Evaton
OF + Usetemuciseris
2 + vance
05 + Usetem oMErs6
OF + Next Pane toner
‘GPROT CTProcedure No. GS-MO-PR-00-017 Page 4 of 4
Bid Evaluation
FERROSTAAL|
Revision C1, dated 21.07.2003
6.0 REFERENCE DOCUMENTS
Contractor's Project Procedures:
GS-MO--QA-00-001 Project Quality Management Plan
Contractor's Standard Procedures:
MGO-Q-QA-001 Preparation, Review and Approval of QM Documents
7.0 DISTRIBUTION
This procedure shall be distributed by the POM according to Project Quality Management
Plan POP-QA-0001, section 7.0:
1 copy Geisenheim Document Control
1 copy Site Document Control
GPROToProcedure No.GS-MO-Q-PR-00-017 Attachment A01, Page 4 of 1
F-NC-174 a
(Elephant) Development Project - GOSP_ | FERROSTAAL|
pacino
‘Petraioi0-01 NOTIFICATION BID EVALUTION Ne
Technical Bid Evaluation
Requisition No:
‘Scope of work:
Equipment No. / Tag No.
Please find attached bid(s) for above mentioned scope.
Bid evaluation shall be closed out complete with recommendation by.
Bidders:
If you need any further information concerning these documents, please contact
the undersigned,
PEM
DISTRIBUTION ‘COMMENTS:
reco Taal] OUT au] BA] GL] A] wR] | wT [rom ppm
PEW
a Sy
na a Son Te mee
1"
GPROTCTAT ‘Farz00s TomEraSAttachment A02, Page 1 of 2
ores
oy tay oats o_o
8007 20142
OvIOLONLD
oral
sommyer| wens] oe
:sqyeuweg
ssjveUwu0g
‘sjuewwo
‘squeunog
‘sued oreds
‘oun Aenea
‘SuOREUEA EDIUYDeL
ONE ISU WaISAS YO
{Aeieiodes pore suone:nOp any
‘2uonisinbas uy paunbau se ereidweo pig
TOpPIa
‘suomipuos / adoos
rea
:0y18 uo pexinboy
hom yo adoos_
FON uopisinboy
ozz4z zo Ozs
ON GOF La
NOLLVNTWAA GIG TWOINDAL
LO-OLO/PLI-4
ON 1288000 OV
Ene
Na
dSO9 - }99fo1g uowdojaneg (ueyde3)
PLL-ON'A
* Procedure No, GS-MO-Q-PR-00-017e00z 2012
coro uoNED
any ses ons 09 20 nn
‘suo; 1puos / edoas|
Joppia
:ayep poou oys | >yiom yo odoos PON wonrsinbey