CONSTRUCTION AND IMPLEMENTATION PLAN

S. No TASK NAME Duration in days

Planning and Permissions (Map


approval , Fire Noc , Excavation
1 15
permission , water & Electricity
Connection etc. ,)
2 Excavation 5
3 Concrete 13

4 Pre backfill 3

5 Framing ( all floors ) 42

6 Roof ( all Floors ) 22

7 Plumbing 42

8 Windows 24
9 HVAC 22
10 Electrical 13

11 Insulation 19
12 Plaster 21

Exterior stone / Elevation of


13 15
Building

14 Fire & Lift Installtion 20

15 Interior doors 13
16 Schedule Buffer 11

17 Interior doors- hang & hardware 11

18 Plumbing 4

19 Electrical 9

20 Interior painting 46

Flooring on all floors including


21 20
driveway

22 FINAL Inspections 1

23 Wrap up 28

24 Building Cleaning 13