HM12+00

Stripping =39.524 m Total 20.00


Excavation
Right = 0.005 sqm
Excavation
Left
0.597 sqm
= 0.592 sqm
Excavation 15.00
EL +13.356 EL +13.356
Embankment= 6.150 sqm
M.A.N WL +12.099
Pontoon
EXcavation = 1.702 sqm EL +10.678
10.00
bidang persamaan
reference level

5.00

9.889
ELEVASI DESAIN

0 1 2 3 4 5 6 7 8 9 10 11 12 13

15.972

16.134

15.794
16.086

14.560

13.857

13.305

11.705

10.294

10.861

12.061

12.994

14.071

14.171
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (m)
DISTANCE (m) 2.19 3.90 1.18 2.84 8.00 4.14 4.02 8.00 10.40 2.13 1.40 2.93 3.53

10.100

18.110

22.250

26.270

34.270

44.670

46.800

48.190

51.120

54.650
0.000

2.190

6.080
7.270
JARAK KOMULATIF

HM 12+50 (sippon)

Stripping = 0.00 m Total 20.00


Excavation
Right = 0.00 sqm
Excavation
Left
0.00 sqm
Excavation
= 0.00 sqm
15.00

Embankment= 0.00 sqm


M.A.N WL +12.091
Pontoon
EXcavation = 0.00 sqm
10.00
bidang persamaan
reference level

5.00

ELEVASI DESAIN 9.848

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
15.193

15.319

15.250

15.100

14.365

13.970

13.195

12.000

11.777

10.321

10.661

11.385
11.484

13.687

13.782

13.907

13.938
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (m)

44.300 0.68
DISTANCE (m) 3.00 4.55 1.51 3.38 7.12 3.18 1.80 1.43 7.26 7.26 3.14 3.14 1.66 2.92 2.49
12.430

19.560

22.730

24.540

25.970

33.230

40.480

43.620

47.430

49.090

52.020

54.510
0.000

3.000

7.540

9.050

JARAK KOMULATIF

WIKA - LESTARI KSO PT. VIRAMA KARYA ( Persero ) KSO

PAKET PEKERJAAN : REHABILITASI JARINGAN IRIGASI PAMARAYAN BARAT Judul Gambar :


D.I CIUJUNG, KAB. SERANG (MYC) CONSTRUCTION DRAWING
NOMOR KONTRAK : HK.02.03/PPK.RW-II/ BBWSC3/05/2017 MC - 1
SALURAN INDUK PAMARAYAN BARAT
TANGGAL KONTRAK : 06 OKTOBER 2017 POTONGAN MELINTANG, HM 12+00 ~ HM 12+50
Tgl. Gambar : No. Register : No.Gambar :
LOKASI PEKERJAAN : KAB.SERANG - PROVINSI BANTEN
PENYEDIA JASA KONSTRUKSI KONSULTAN SUPERVISI
Mengetahui
WIKA - LESTARI KSO PT. VIRAMA KARYA ( Persero ) KSO

PURNOMO, A.Md.
DIPERIKSA : EDY MURDONO DIREKSI :
DIGAMBAR : BONNY SANTOSO Pelaksana Teknis
Design Engineer
Drafter
0 0.4 0.8 1.2 1.6 2.0 m SISWANTO, ST Ir.OKY ARIS PRAYITNO
SCALE B DI AJUKAN : DISETUJUI :
DIKETAHUI : MUHAMAD IRHAN, ST
Project Manager Team Leader
PPK

Note : Gambar ini berlaku apabila telah ditandatangani semua pihak dan telah di stempel legalisir