08 Tie in
08 Tie in
Tie - In
Procedure No.: MAS/MNGL/ARC/JP/08
Page 1 of 5
MAS CONSTRUCTIONS
PROJECT : BI-ANNUAL RATE CONTRACT FOR LAYING &
CONSTRUCTION OF 6”/4” NB U/G STEELP/L NETWORK &
ASSOCIATED WORKS OF CITY GAS DISTRIBUTION N/W OF
MNGL,PUNE
TABLE OF CONTENTS
1. PURPOSE………………………………………… 03
2. SCOPE…………………………………………… 03
3. REFERENCE…………………………………… 03
4. RESPONSIBILITIES…………………………… 03
5. METHODOLOGY……………………………… 04
6. HSE……………………………………………… 05
7. ACCEPTANCE CRITERIA…………………… 05
8. DOCUMENTATIONS………………………… 05
Page 2 of 5
MAS CONSTRUCTIONS
PROJECT : BI-ANNUAL RATE CONTRACT FOR LAYING &
CONSTRUCTION OF 6”/4” NB U/G STEELP/L NETWORK &
ASSOCIATED WORKS OF CITY GAS DISTRIBUTION N/W OF
MNGL,PUNE
1.0 PURPOSE
The purpose of this work instruction is to establish guidelines and requirements to control the
production welding and inspection to be used in the CNG & City Gas Distribution Pipeline
Construction in Pune.
2.0 SCOPE
3.0 REFERANCE:
4.0RESPONSIBILITY
Page 3 of 5
MAS CONSTRUCTIONS
PROJECT : BI-ANNUAL RATE CONTRACT FOR LAYING &
CONSTRUCTION OF 6”/4” NB U/G STEELP/L NETWORK &
ASSOCIATED WORKS OF CITY GAS DISTRIBUTION N/W OF
MNGL,PUNE
5.0 METHODOLOGY
TIE - IN
The unconnected sections of the pipeline at various locations will be tied in after the sections are
coated, lowered and backfilled. The sections to be connected will have at the ends, sections of
overlapping, uncovered pipe of sufficient length to absorb without inducing excessive stresses in the
steel, small displacements necessary for perfect alignment and connection of the ends.
Tie-in will preferably be carried out at ambient temperatures. Bell holes of suitable size will be
excavated to facilitate welding and other operations. The tie-in will be done in such a way as to leave a
minimum of strain in the pipe. If necessary, with respect to the trench, realigning of the pipe will be
done to eliminate forces or strain in the pipe.
If a pup end cannot be avoided for tie-in, the minimum length that shall be added is 1.0 meter. If
necessary tie-in with two or more pups will be used provided that they each have minimum length of
1.0 meter and are separated by an entire length of pipe. In no case more than three (3) welds will be
done on a 10 meter length of pipeline.
Page 4 of 5
MAS CONSTRUCTIONS
PROJECT : BI-ANNUAL RATE CONTRACT FOR LAYING &
CONSTRUCTION OF 6”/4” NB U/G STEELP/L NETWORK &
ASSOCIATED WORKS OF CITY GAS DISTRIBUTION N/W OF
MNGL,PUNE
7.0ACCEPTANCE CRITERIA
Shall be as per the above procedure and MNGL Specification No: MNGL/S/05/21/02.
8.0 DOCUMENTATION:
NOTE:
In case of any conflict between the requirements of this procedure and MNGL specification, the later
shall govern.
Page 5 of 5